Quizzes
Take Quizzes
Animal
Nutrition
Love
Relationship
Computer
Sports
Society
Business
Geography
Language
Personality
Harry Potter
Movie
Television
Music
Online Exam
Health
Country
Art
Entertainment
Celebrity
Math
Game
Book
Fun
Science
Food
History
Education
All Topics
Create a Quiz
Quiz Maker
Training Maker
Survey Maker
Flashcards
Brain Games
See All
ProProfs.com
Search
Create A Quiz
Take Quizzes
Animal
Nutrition
Love
Relationship
Computer
Sports
Society
Business
Geography
Language
Personality
Harry Potter
Movie
Television
Music
Online Exam
Health
Country
Art
Entertainment
Celebrity
Math
Game
Book
Fun
Science
Food
History
Education
All Topics
Products
Quiz Maker
Training Maker
Survey Maker
Flashcards
Brain Games
See All
ProProfs.com
Quizzes
Quizzes
›
Training
›
OSHA
›
Scaffolding Safety
Scaffolding
10 Questions
|
By Frankenstein | Updated: Dec 12, 2015
| Attempts: 1741
Share
Start
Share on Facebook
Share on Twitter
Share on Whatsapp
Share on Pinterest
Share on Email
Copy to Clipboard
Embed on your website
Question
1
/ 11
🏆
Rank #--
▾
0 %
0/100
Score
0/100
1.
At the start of each shift you must conduct an inspection of the scaffolding.
TRUE
FALSE
Submit
Start Quiz
About This Quiz
This quiz is designed to test employees on Scaffolding Safety.
2.
What first name or nickname would you like us to use?
You may optionally provide this to label your report, leaderboard, or certificate.
2.
It is okay to set up a scaffold out of plumb as long as it is only 5 frames tall or less.
TRUE
FALSE
Submit
3.
If a/an______ is installed at the appropriate height it can act as the top rail or mid rail on a scaffold's handrail.
Bucket
Cross brace
Caution tape
Stair tower
Bologna sandwich
Submit
4.
The rated load capacity for three-person scaffolding is 250 pounds placed at the center of the span and 250 pounds placed 18 inches to the left and right of the center span (total 750 pounds)
TRUE
FALSE
Submit
5.
How often do you have to inspect a stair tower?
Weekly
Any time the scaffold is moved
Only when suspicions warrant
Daily with all other scaffold
Submit
6.
When overlapping OSHA planks on a scaffold frame what is the minimum and maximum overlap required?
"2"" min - 36"" max"
"1"" min - 14"" max"
"6"" min - 12"" max"
"15"" min - 22"" max"
Submit
7.
A screw jack should never extend more than ______ of it's length?
2-Jan
3-Feb
8-Jul
4-Mar
Submit
8.
You do not want to distribute the load on a scaffold over the support.
TRUE
FALSE
Submit
9.
For scaffold platform construction you must have all the following:
Platforms fully planked or decked
Not more than 1-inch gap between planks
"Scaffold Platforms and walkways must be at least 20"" wide"
A yellow tag hanging on the scaffold during construction
Submit
10.
Which of the following are scaffolding access requirements?
Must have safe access
"Bottom access rung is not more than 24"" high"
Rest platforms at 35 foot intervals
"Only end frames with built in ladders that have rungs 8"" apart can be used for access"
The base plate or foot of the scaffold leg only has to contact ground on 3 of the 4 sides.
Submit
×
Thank you for your feedback!
View My Results
Related Quizzes
Scaffolding Safety: Construction Safety Standards Quiz!
Scaffolding Safety: Construction Safety Standards Quiz!
Construction Safety Standards Scaffolding Safety
Construction Safety Standards Scaffolding Safety
2.2 Construction Safety Standards- Scaffolding Safety
2.2 Construction Safety Standards- Scaffolding Safety
OSHA HAZWOPER Practice Quiz
OSHA HAZWOPER Practice Quiz
OSHA: Job Safety and Hazard Analysis Quiz!
OSHA: Job Safety and Hazard Analysis Quiz!
HAZWOPER Hazardous Waste Operations and Emergency Response
HAZWOPER Hazardous Waste Operations and Emergency Response
Thank you for your feedback!
Would you like to edit this question to improve it?
No thanks
Name:
Email:
Oops! Give us more information:
Incorrect Question
Incorrect Answer
Typos
I have a feedback
Submit
Please provide name and email to proceed.
Please provide correct email to proceed.
Please provide feedback.
Please select the option.
All (10)
Unanswered (
)
Answered (
)
At the start of each shift you must conduct an inspection of the...
It is okay to set up a scaffold out of plumb as long as it is only 5...
If a/an______ is installed at the appropriate height it can act as the...
The rated load capacity for three-person scaffolding is 250 pounds...
How often do you have to inspect a stair tower?
When overlapping OSHA planks on a scaffold frame what is the minimum...
A screw jack should never extend more than ______ of it's length?
You do not want to distribute the load on a scaffold over...
For scaffold platform construction you must have all the following:
Which of the following are scaffolding access requirements?
X
OK
X
OK
Cancel
X
OK
Cancel
Your Rank: #-- / --
Leaderboard
✕