ISTQB Practice Exam Simulator - 4

SettingsSettings
Please wait...
  • 1/37 Questions

    ‘X’ has given a data on a person age, which should be between 1 to 99. Using BVA which is the appropriate one

    • 0,1,2,99
    • 1, 99, 100, 98
    • 0, 1, 99, 100
    • –1, 0, 1, 99
Please wait...
ISTQB Practice Exam Simulator - 4 - Quiz
About This Quiz

ISTQB Practice Exam Simulator - 4


Quiz Preview

  • 2. 

    Bug life cycle

    • Open, Assigned, Fixed, Closed

    • Open, Fixed, Assigned, Closed

    • Assigned, Open, Closed, Fixed

    • Assigned, Open, Fixed, Closed

    Correct Answer
    A. Open, Assigned, Fixed, Closed
  • 3. 

     _____________ testing is performed at the developing organization’s site

    • Unit testing

    • Regression testing

    • Alpha testing

    • Integration testing

    Correct Answer
    A. Alpha testing
  • 4. 

    System testing should investigate 

    • Non-functional requirements only not Functional requirements

    • Functional requirements only not non-functional requirements

    • Non-functional requirements and Functional requirements

    • Non-functional requirements or Functional requirements

    Correct Answer
    A. Non-functional requirements and Functional requirements
  • 5. 

    Which is the non-functional testing 

    • Performance testing

    • Unit testing

    • Regression testing

    • Sanity testing

    Correct Answer
    A. Performance testing
  • 6. 

    Use cases can be performed to test 

    • Performance testing

    • Unit testing

    • Business scenarios

    • Static testing

    Correct Answer
    A. Business scenarios
  • 7. 

    Purpose of test design technique is 

    • Identifying test conditions only, not Identifying test cases

    • Not Identifying test conditions, Identifying test cases only

    • Identifying test conditions and Identifying test cases

    • Identifying test conditions or Identifying test cases

    Correct Answer
    A. Identifying test conditions and Identifying test cases
  • 8. 

    PDCA is known as

    • Plan, Do, Check, Act

    • Plan, Do, Correct, Act

    • Plan, Debug, Check, Act

    • Plan, Do, Check, Accept

    Correct Answer
    A. Plan, Do, Check, Act
  • 9. 

    Contract and regulation testing is a part of

    • System testing

    • Acceptance testing

    • Integration testing

    • Smoke testing

    Correct Answer
    A. Acceptance testing
  • 10. 

    One person has been dominating the current software process improvement meeting. Which of the following techniques should the facilitator use to bring other team members into the discussion?

    • Confront the person and ask that other team members be allowed to express their opinions

    • Wait for the person to pause, acknowledge the person’ s opinion, and ask for someone else’ s opinion

    • Switch the topic to an issue about which the person does not have a strong opinion

    • Express an opinion that differs from the person’ s opinion in order to encourage others to express their ideas

    Correct Answer
    A. Wait for the person to pause, acknowledge the person’ s opinion, and ask for someone else’ s opinion
  • 11. 

    Who is responsible for document all the issues, problems and open point that were identified during the review meeting

    • Moderator

    • Scribe

    • Reviewers

    • Author

    Correct Answer
    A. Scribe
  • 12. 

    Arc testing is known as

    • Branch testing

    • Agile testing

    • Beta testing

    • Ad-hoc testing

    Correct Answer
    A. Branch testing
  • 13. 

    The principle of Cyclomatic complexity, considering L as edges or links, N as nodes, P as independent paths

    • L-N +2P

    • N-L +2P

    • N-L +P

    • N-L +P

    Correct Answer
    A. L-N +2P
  • 14. 

    The software engineer's role in tool selection is

    • To identify, evaluate, and rank tools, and recommend tools to management

    • To determine what kind of tool is needed, then find it and buy it

    • To initiate the tool search and present a case to management

    • To identify, evaluate and select the tools

    Correct Answer
    A. To identify, evaluate, and rank tools, and recommend tools to management
  • 15. 

    Which is not the testing objectives

    • Finding defects

    • Gaining confidence about the level of quality and providing information

    • Preventing defects

    • Debugging defects

    Correct Answer
    A. Debugging defects
  • 16. 

    Which is not the software characteristics

    • Reliability

    • Usability

    • Scalability

    • Maintainability

    Correct Answer
    A. Scalability
  • 17. 

    Which is not a testing principle

    • Early testing

    • Defect clustering

    • Pesticide paradox

    • Exhaustive testing

    Correct Answer
    A. Exhaustive testing
  • 18. 

    Which is not the fundamental test process

    • Planning and control

    • Test closure activities

    • Analysis and design

    • None

    Correct Answer
    A. None
  • 19. 

    Find the correct flow of the phases of a formal review

    • Planning, Review meeting, Rework, Kick off

    • Planning, Individual preparation, Kick off, Rework

    • Planning, Review meeting, Rework, Follow up

    • Planning, Individual preparation, Follow up, Kick off

    Correct Answer
    A. Planning, Review meeting, Rework, Follow up
  • 20. 

    ___________ Testing will be performed by the people at client own locations 

    • Alpha testing

    • Field testing

    • Performance testing

    • System testing

    Correct Answer
    A. Field testing
  • 21. 

    The purpose of exit criteria is

    • Define when to stop testing

    • End of test level

    • When a set of tests has achieved a specific pre condition

    • All of the above

    Correct Answer
    A. All of the above
  • 22. 

     ________ and ________ are used within individual workbenches to produce the right output products.

    • Tools and techniques

    • Procedures and standards

    • Processes and walk-throughs

    • Reviews and update

    Correct Answer
    A. Procedures and standards
  • 23. 

    Which is not a black box testing technique

    • Equivalence partition

    • Decision tables

    • Transaction diagrams

    • Decision testing

    Correct Answer
    A. Decision testing
  • 24. 

    A project that is in the implementation phase is six weeks behind schedule. The delivery date for the product is four months away. The project is not allowed to slip the delivery date or compromise on the quality standards established for this product. Which of the following actions would bring this project back on schedule?

    • Eliminate some of the requirements that have not yet been implemented

    • Add more engineers to the project to make up for lost work

    • Ask the current developers to work overtime until the lost work is recovered

    • Hire more software quality assurance personnel

    Correct Answer
    A. Eliminate some of the requirements that have not yet been implemented
  • 25. 

    Which is not the project risks

    • Supplier issues

    • Organization factors

    • Technical issues

    • Error-prone software delivered

    Correct Answer
    A. Error-prone software delivered
  • 26. 

    Poor software characteristics are

    • Only Project risks

    • Only Product risks

    • Project risks and Product risks

    • Project risks or Product risks

    Correct Answer
    A. Only Product risks
  • 27. 

    What is the main purpose of Informal review 

    • Inexpensive way to get some benefit

    • Find defects

    • Learning, gaining understanding, effect finding

    • Discuss, make decisions, solve technical problems

    Correct Answer
    A. Inexpensive way to get some benefit
  • 28. 

    Which is not a test Oracle

    • The existing system

    • The code

    • Individual’s knowledge

    • User manual

    Correct Answer
    A. The code
  • 29. 

    Which of the following is the standard for the Software product quality

    • ISO 1926

    • ISO 829

    • ISO 1012

    • ISO 1028

    Correct Answer
    A. ISO 1926
  • 30. 

    Maintenance releases and technical assistance centers are examples of which of the following costs of quality?

    • External failure

    • Internal failure

    • Appraisal

    • Prevention

    Correct Answer
    A. External failure
  • 31. 

    A _____ is the step-by-step method followed to ensure that standards are met

    • SDLC

    • Project Plan

    • Policy

    • Procedure

    Correct Answer
    A. Procedure
  • 32. 

    Stochastic testing using statistical information or operational profiles uses the following method

    • Heuristic testing approach

    • Methodical testing approach

    • Model based testing approach

    • Process or standard compliant testing approach

    Correct Answer
    A. Model based testing approach
  • 33. 

    ___________ technique can be used to achieve input and output coverage 

    • Boundary value analysis

    • Equivalence partitioning

    • Decision table testing

    • State transition testing

    Correct Answer
    A. Equivalence partitioning
  • 34. 

    Find the mismatch

    • Test data preparation tools – Manipulate Data bases

    • Test design tools – Generate test inputs

    • Requirement management tools – Enables individual tests to be traceable

    • Configuration management tools – Check for consistence

    Correct Answer
    A. Configuration management tools – Check for consistence
  • 35. 

    FPA is used to

    • To measure the functional requirements of the project

    • To measure the size of the functionality of an Information system

    • To measure the functional testing effort

    • To measure the functional flow

    Correct Answer
    A. To measure the size of the functionality of an Information system
  • 36. 

    A software model that can’t be used in functional testing

    • Process flow model

    • State transaction model

    • Menu structure model

    • Plain language specification model

    Correct Answer
    A. Menu structure model
  • 37. 

    Which is not a Component testing

    • Check the memory leaks

    • Check the robustness

    • Check the branch coverage

    • Check the decision tables

    Correct Answer
    A. Check the decision tables

Quiz Review Timeline (Updated): +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 22, 2022
    Quiz Edited by
    ProProfs Editorial Team
  • Oct 18, 2011
    Quiz Created by
Back to Top Back to top
Advertisement