Fundamentals Of Drawing, Specs, Sketches Quiz

Reviewed by Editorial Team
The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Dbower45236
D
Dbower45236
Community Contributor
Quizzes Created: 1 | Total Attempts: 142
| Attempts: 142 | Questions: 25
Please wait...
Question 1 / 25
0 %
0/100
Score 0/100
1. Specifications should have revision numbers just like drawings?

Explanation

True. Specifications should have revision numbers just like drawings. Revision numbers are used to track changes, updates, and revisions to specifications, ensuring that all stakeholders are working with the most current version of the specifications. This helps maintain consistency, accuracy, and clarity in the construction documentation process.

Submit
Please wait...
About This Quiz
Fundamentals Of Drawing, Specs, Sketches Quiz - Quiz

Immersive yourself in our Fundamentals of Drawing, Specs, Sketches Quiz! This quiz is designed to test your knowledge and understanding of the foundational principles of drawing, specifications, and sketching.

If you're an aspiring artist looking to hone your skills or someone interested in the technical aspects of art, this quiz... see moreoffers an engaging opportunity to delve into the fundamentals of visual expression. In this quiz, you'll encounter a variety of questions that cover essential topics such as basic drawing techniques, understanding specifications in art and design, and the art of sketching. From understanding perspective and proportions to grasping the importance of technical specifications in various art forms, this quiz covers it all.

Each question is crafted to challenge your understanding and provide valuable insights into the world of visual arts. Whether you're a beginner or have some experience in drawing and sketching, this quiz is a great way to test your knowledge and learn something new.
see less

Tell us your name to personalize your report, certificate & get on the leaderboard!
2. All sketch drawings must start with "SK"?

Explanation

False. Sketch drawings do not necessarily have to start with "SK." While "SK" is a common abbreviation used to denote sketch drawings in some contexts, there is no universal requirement that all sketch drawings must start with "SK."

Submit
3. What is the best file type for Sketches?

Explanation

The best file type for Sketches would typically be PDF (Portable Document Format). PDF files are widely compatible, easy to view, share, and print, making them ideal for distributing sketches to various stakeholders involved in the project.

Submit
4. The revision "03.1" is not a recommended revision number

Explanation

False. The revision "03.1" is a valid revision number format and is commonly used to indicate a minor revision or a revision between major revisions. This format allows for more precise tracking of revisions, especially when there are multiple revisions within a major revision cycle.

Submit
5. Specifications should be broken down into files for each?

Explanation

When organizing specifications, they are typically divided into sections, each covering a specific aspect of the project. For example, common sections in construction specifications include General Requirements, Site Preparation, etc. Each section contains detailed information, requirements, and instructions related to its specific aspect of the project.

Submit
6. Sketches can be applied to a previous revision of a drawing?

Explanation

True. Sketches can indeed be applied to a previous revision of a drawing. Sketches are often used to propose changes, revisions, or additional details to existing drawings. These sketches can be incorporated into the documentation process, even if they are addressing an earlier revision of the drawing.

Submit
7. Drawings usually contain more than one page?

Explanation

Drawings typically consist of a single page, especially when referring to individual artworks or sketches. However, in certain contexts like technical drawings or architectural plans, drawings may span multiple pages for comprehensive representation.

Submit
8. What revision follows revision "Z"?

Explanation

The revision that follows revision "Z" would typically be "AA." In the alphabetical sequence, after "Z," the next progression is to add another letter, creating a two-letter combination such as "AA" to denote the next revision.

Submit
9. Specifications usually will not include a specification Item Date?

Explanation

False. Specifications typically include a specification Item Date. This date indicates when a specific specification item was issued or revised, providing important information about the timeline and version history of the specification document. Including specification item dates helps ensure that stakeholders are referencing the most current and relevant information when reviewing or working with the specifications.

Submit
10. Specifications should be stored as a single file containing all sections so the subcontractors always have the most current information?

Explanation

True. Specifications should ideally be stored as a single file containing all sections to ensure that subcontractors and other stakeholders have access to the most current and comprehensive information. This practice helps maintain consistency and reduces the risk of discrepancies or outdated information being used during the project execution.

Submit
11. Which is the best drawing numbering scheme?

Explanation

The best drawing numbering scheme is A101. This scheme follows a simple and clear format, using a letter (A) followed by a three-digit number (101). It avoids any unnecessary symbols or characters and maintains a consistent structure.

Submit
12. The most important attribute for a drawing is?

Explanation

Discipline in drawing refers to the artist's commitment, focus, and dedication to the craft, which are essential for consistent practice, attention to detail, patience, and learning and refining techniques. The other options (Number, Revision, Issue Date) do not directly relate to the fundamental attributes required for drawing and are therefore not as relevant or essential in this context.

Submit
13. Sketches can modify more than one drawing.

Explanation

Sketches cannot modify more than one drawing. A sketch is a rough, preliminary drawing that is typically used as a starting point for creating a more detailed and finalized drawing. It is meant to be specific to a single drawing and is not designed to modify multiple drawings simultaneously. Therefore, the statement is false.

Submit
14. Drawings can be stored as a single file for each discipline.

Explanation

False. While it's possible to store drawings as a single file for each discipline, it's more common and practical to organize drawings into sets or packages that contain multiple drawings related to a specific discipline or aspect of a project.

Submit
15. Which is the best format for a specification number?

Explanation

The format "03 21 04" adheres to the MasterFormat system, which is a standardized organizational structure widely used in the construction industry for categorizing construction-related information. In the MasterFormat system, numbers are used to classify information into specific divisions, groups, and sections.

Submit
16. Sketches are usually attached to which type of document?

Explanation

Sketches are usually attached to Construction Drawings. These sketches provide additional details, annotations, or revisions to the construction drawings, helping to clarify specific aspects of the design or construction process. 

Submit
17. Preconstruction or design drawings should have a revision number that starts with "00" and increases with each revision.

Explanation

False. Preconstruction or design drawings typically have a revision number that starts with "A" or another designation to indicate that they are preliminary or conceptual versions. The revision number then increases with each subsequent revision, typically using alphabetical characters (e.g., A, B, C) rather than numerical characters.

Submit
18. Which is a valid Revision for a Preconstruction document?

Explanation

A valid revision for a Preconstruction document would typically be "A." In the context of preconstruction documents, revisions are often denoted using alphabetical characters, such as "A," "B," "C," etc., to indicate different versions or iterations of the document. Numeric characters like "1A," "00," or "0A" are less commonly used for revisions in preconstruction documents.

Submit
19. The revision "03A" is not a recommended revision number.

Explanation

True. The revision "03A" is not a recommended revision number format. Typically, revisions are designated using alphabetical characters (e.g., A, B, C) after a numerical prefix (e.g., 01, 02, 03) to indicate major revisions followed by minor revisions. Using a letter after the numerical revision, such as "03A," can lead to confusion in tracking revisions and is not a common or recommended practice in document management for construction projects.

Submit
20. What type of document is used to convey a change?

Explanation

A Change Order is the type of document used to convey a change in a project's scope, schedule, or budget. It is a formal written document that outlines the details of the change, including the reason for the change, the impact on the project, any associated costs or schedule adjustments, and any approvals required.

Submit
21. The Drawing or Item Date indicates the date that the drawing was originally drawn.

Explanation

False. The Drawing or Item Date typically indicates the date when the drawing was issued or revised, rather than the date it was originally drawn. This date reflects the latest version of the drawing and is important for tracking revisions, managing changes, and ensuring that all project stakeholders are working from the most up-to-date information.

Submit
22. The Issue Date field contains which date?

Explanation

The Issue Date field typically contains the date when the documents are issued or released to stakeholders, including subcontractors, for review, reference, or action. This date indicates when the documents become available for use or consideration in the project. It's important for tracking the timeline of document distribution and ensuring that stakeholders have access to the most current information.

Submit
23. The following document types contain a Discipline?

Explanation

Drawings and specifications are document types that contain a Discipline, which refers to discipline-specific information organized within each document. Drawings typically convey design and construction details related to various disciplines such as architectural, structural, mechanical, electrical, or plumbing. Specifications, on the other hand, include discipline-specific requirements, materials, standards, and procedures organized by discipline, such as architectural specifications or structural specifications.

Submit
24. Which attributes are shared between drawings and specifications?

Explanation



Both drawings and specifications share common attributes, namely Number and Revision. Number refers to the unique identification assigned to each drawing or specification, facilitating easy reference and organization. Revision denotes the process of making changes or updates to both drawings and specifications, ensuring accuracy and alignment with project requirements. These attributes are essential in managing and tracking the various components of a project, whether it involves creating detailed drawings or outlining specific requirements and standards through specifications.
Submit
25. Which Issue Status is typically sent to contractors so that they can prepare a bid during the bidding phase?

Explanation

The Issue Status typically sent to contractors so that they can prepare a bid during the bidding phase is "Issued For Bid." This status indicates that the drawings and specifications are finalized and ready for contractors to review and submit their bids based on the project requirements.

Submit
View My Results

Quiz Review Timeline (Updated): Jun 6, 2024 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Jun 06, 2024
    Quiz Edited by
    ProProfs Editorial Team
  • Jan 21, 2013
    Quiz Created by
    Dbower45236
Cancel
  • All
    All (25)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
Specifications should have revision numbers just like drawings?
All sketch drawings must start with "SK"?
What is the best file type for Sketches?
The revision "03.1" is not a recommended revision number
Specifications should be broken down into files for each?
Sketches can be applied to a previous revision of a drawing?
Drawings usually contain more than one page?
What revision follows revision "Z"?
Specifications usually will not include a specification Item Date?
Specifications should be stored as a single file containing all...
Which is the best drawing numbering scheme?
The most important attribute for a drawing is?
Sketches can modify more than one drawing.
Drawings can be stored as a single file for each discipline.
Which is the best format for a specification number?
Sketches are usually attached to which type of document?
Preconstruction or design drawings should have a revision number that...
Which is a valid Revision for a Preconstruction document?
The revision "03A" is not a recommended revision number.
What type of document is used to convey a change?
The Drawing or Item Date indicates the date that the drawing was...
The Issue Date field contains which date?
The following document types contain a Discipline?
Which attributes are shared between drawings and specifications?
Which Issue Status is typically sent to contractors so that they can...
Alert!

Advertisement