  • 1. 
    The most important attribute for a drawing is?
    • A. 

      Discipline

    • B. 

      Number

    • C. 

      Revision

    • D. 

      Issue Date

  • 2. 
    Drawings usually contain more than one page?
    • A. 

      True

    • B. 

      False

  • 3. 
    Which attributes are shared between drawings and specifications?
    • A. 

      Number

    • B. 

      Discipline

    • C. 

      Revision

    • D. 

      Subproject

  • 4. 
    What type of document is used to convey a change?
    • A. 

      Drawing

    • B. 

      Specification

    • C. 

      Sketch

    • D. 

      Change Order

  • 5. 
    Sketches can modify more than one Drawing?
    • A. 

      True

    • B. 

      False

  • 6. 
    Specifications should be stored as a single file containing all sections so the subcontractors always have the most current information?
    • A. 

      True

    • B. 

      False

  • 7. 
    Drawings can be stored as a single file for each discipline?
    • A. 

      True

    • B. 

      False

  • 8. 
    The Drawing or Item Date indicates the date that the drawing was originally drawn?
    • A. 

      True

    • B. 

      False

  • 9. 
    Which Issue Status is typically sent to contractors so that they can prepare a bid during the bidding phase?
    • A. 

      Issued For Bid

    • B. 

      Issued for Construction

    • C. 

      Issued for Design

    • D. 

      Issued for Review

  • 10. 
    Preconstruction or design drawings should have a revision number that starts with "00" and increases with each revision?
    • A. 

      True

    • B. 

      False

  • 11. 
    The revision "03A" is not a recommended revision number.
    • A. 

      True

    • B. 

      False

  • 12. 
    The revision "03.1" is not a recommended revision number
    • A. 

      True

    • B. 

      False

  • 13. 
    The following document types contain a Discipline?
    • A. 

      Drawings

    • B. 

      Specifications

    • C. 

      Sketches

    • D. 

      Narratives

  • 14. 
    The Issue Date field contains which date?
    • A. 

      The date the documents are Issued to subcontractors

    • B. 

      The date the Issue is Released

    • C. 

      The date the architect Issued the files

    • D. 

      The date displayed on the transmittal or narrative

    • E. 

      The date that the files are to be released for bid

  • 15. 
    Specifications should be broken down into files for each?
    • A. 

      Chapter

    • B. 

      Section

    • C. 

      Spec Book

    • D. 

      Division

  • 16. 
    Which is the best drawing numbering scheme?
    • A. 

      A 101

    • B. 

      A-101

    • C. 

      A101

    • D. 

      A + 101

  • 17. 
    What revision follows revision "Z"?
    • A. 

      AA

    • B. 

      Z1

    • C. 

      ZA

    • D. 

      AZ

  • 18. 
    Sketches can be applied to a previous revision of a drawing?
    • A. 

      True

    • B. 

      False

  • 19. 
    Specifications should have revision numbers just like drawings?
    • A. 

      True

    • B. 

      False

  • 20. 
    What is the best file type for Sketches?
    • A. 

      PDF

    • B. 

      Tiff

    • C. 

      AutoCAD

    • D. 

      Revit

  • 21. 
    Which is a valid Revision for a Preconstruction document?
    • A. 

      1A

    • B. 

      A

    • C. 

      00

    • D. 

      0A

  • 22. 
    Specifications usually will not include a specification Item Date?
    • A. 

      True

    • B. 

      False

  • 23. 
    Sketches are usually attached to which type of document?
    • A. 

      Preconstruction Drawings

    • B. 

      Construction Drawings

    • C. 

      Both Preconstruction and Construction Drawings

    • D. 

      Shop Drawings

  • 24. 
    Which is the best format for a specification number?
    • A. 

      03 21 04

    • B. 

      03-21-04

    • C. 

      032104

    • D. 

      32104

  • 25. 
    All sketch drawings must start with "SK"?
    • A. 

      True

    • B. 

      False