CA Ncs Pi Run Action Plan

5 Questions | Attempts: 55
Please wait...
Question 1 / 6
🏆 Rank #--
Score 0/100

1. If the legal description is Lot 5 and a portion of Lot 4, only Lot 5 needs to be ran in DataTrace.

Submit
Please wait...
About This Quiz
CA Ncs Pi Run Action Plan - Quiz

This quiz is for the PI Action plan training done one 21, January 2010.

2.

What first name or nickname would you like us to use?

You may optionally provide this to label your report, leaderboard, or certificate.

2. The All Tract run needs to be properly checked like a regular PI run and any documents that could affect need to be pulled and checked before eliminating.

Submit

3. The examiner should double check the search package to make sure all PI runs were pulled and pulled correctly.

Submit

4. A legal description must be fully read and all property mentioned in the legal needs to be ran in DataTrace.

Submit

5. If a condominium has recorded, but no lots have been sold and the report is on the entire condominium, only the underlying lot needs to be run, not the individual condos.

Submit
×
Saved
Thank you for your feedback!
View My Results
Cancel
  • All
    All (5)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
If the legal description is Lot 5 and a portion of Lot 4, only Lot 5...
The All Tract run needs to be properly checked like a regular PI run...
The examiner should double check the search package to make sure all...
A legal description must be fully read and all property mentioned in...
If a condominium has recorded, but no lots have been sold and the...
play-Mute sad happy unanswered_answer up-hover down-hover success oval cancel Check box square blue
Alert!