A "takeoff' of the blueprint is done using a ruler ("stick") and these takeoff quantities are used to calculate material and labor prices.
Unit prices with predetermined standard prices from subcontractors and installers are factored by a judgment on special site conditions.
The "stick" method is another word for guesstimate which relies on the estimator's experience to estimate material and labor prices.
A complete list of all materials and their prices is added to the list of calculated labor costs and quoted subcontractor prices for a total project cost.
Rate this question:
Plank
Strip
Parquet
Laminated
Rate this question:
Must include copyright symbol, year of publication, and name of the designer
Provides protection after the client has paid retainer
Endures for 25 years after your death
Filed with the office of copyright
Rate this question:
The relationship of people to their environment
Past human lives and activities through material objects
Human measurements, such as size and proportion
Human behavior, artifacts and beliefs of different cultures
Rate this question:
Show client photos from previous projects
Identify the client's needs and wants.
Have knowledge of current interest rates
Survey selling prices of homes sold in the last six months
Rate this question:
36 inches
42 inches
48 inches
60 inches
Rate this question:
Cost effective
Improve air and water quality
Reduce solid waste
Conserve natural resources
Rate this question:
9
12
15
18
Rate this question:
0"
1/8"
1/4"
1/2"
Rate this question:
1/2" drywall
5/8" drywall
Lath and plaster
Cement board
Rate this question:
In full either upon signing or immediately upon completion of work
At the completion of the job
After the punch list has been completed.
Once a week during the job
Rate this question:
Asbestos fibers in the air
Dumpster placment
Recycle concerns
Water line leaks
Rate this question:
Furring strips
Ballon framing
Joist
2x4 or 2x6 studs
Rate this question:
1/8"
3/\6"
1/4"
1/16"
Rate this question:
Loose asbestos
Old cabinets
Old appliances
Old plumbing fixtures
Rate this question:
Both heating and cooling
Neither heating nor cooling.
Heating only.
Cooling only.
Rate this question:
Reduce their energy consumption
Help them save water
Help them receive rebates
Off-set their bathroom bid.
Rate this question:
Flexibility in use
Perceptible information
Design programming
Low physical effort
Rate this question:
3/16
1/4
3/8
1/2
Rate this question:
Best performance for most purposes
Relatively expensive product cost
Can be purchased pre-laminated
Impregnated with polyester resins
Rate this question:
Latex added to sanded or non-sanded grout
Non-sanded
Epoxy
Color lasting
Rate this question:
6
9
15
12
Rate this question:
Mortise and tenon joint.
Butt joint
Dowel joint.
Dovetail joint.
Rate this question:
Quiz Review Timeline (Updated): Mar 21, 2023 +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.