The ProProfs editorial team is comprised of experienced subject matter experts. They've collectively created over 10,000 quizzes and lessons, serving over 100 million users. Our team includes in-house content moderators and subject matter experts, as well as a global network of rigorously trained contributors. All adhere to our comprehensive editorial guidelines, ensuring the delivery of high-quality content.
Learn about Our Editorial Process
| By Syarkawi
S
Syarkawi
Community Contributor
Quizzes Created: 1 | Total Attempts: 784
| Attempts: 786 | Pertanyaan: 20
Please wait...

Question 1 / 20
0 %
0/100
Score 0/100
1. Hal-hal yang perlu diperhatikan dalam penanganan dan penyiapan bahan bangunan adalah..?

Explanation

The correct answer is "Pemilihan kualitas bahan bangunan yang baik." This is because selecting high-quality building materials is crucial in ensuring the durability and safety of the structure. Good quality materials will have better resistance to wear and tear, weather conditions, and structural integrity. Using low-quality materials may result in frequent repairs, decreased lifespan of the building, and potential safety hazards. Therefore, it is important to carefully choose materials that meet the required standards and specifications for construction.

Submit
Please wait...
About This Quiz
Teknik Sipil - Quiz

2. Jenis-jenis pekerjaan yang di tangani kontraktor, kecuali ..?

Explanation

The given options represent different types of jobs that contractors handle. The options include architecture, integrated work, civil work, environmental planning, and trade. The word "kecuali" in the question indicates that we need to find the option that does not belong to the given category. The correct answer, "Perdagangan," means trade in English, which is not typically a type of job handled by contractors.

Submit
3. Manakah yang termasuk faktor-faktor penyebab kegagalan proyek..

Explanation

Semua benar. Faktor-faktor penyebab kegagalan proyek dapat meliputi perubahan dalam batasan sistem, perencanaan yang buruk, dokumentasi yang sangat minim, dan komunikasi yang kurang baik. Semua faktor ini dapat menyebabkan kegagalan dalam mencapai tujuan proyek dan menyebabkan masalah dalam pelaksanaan proyek secara keseluruhan.

Submit
4. Siapakah yang biasa mendelegasikan suatu proyek 

Explanation

The correct answer is "manager proyek". A project manager is typically responsible for delegating tasks and responsibilities within a project. They oversee the project's progress, assign resources, and ensure that the project is completed successfully. Stakeholders, customer, sponsor, and the leader of the company may have input and involvement in the project, but it is ultimately the project manager who delegates the project tasks to the team members.

Submit
5. susunan item pekerjaan yang ada pada pekerjaan pondasi yaitu ..?

Explanation

The correct answer is the arrangement of work items in the foundation work, starting with the Bowplank work, followed by excavation work, then filling work with sand, and finally the installation of the foundation with a stone mixture ratio of 1:5. This sequence is logical as it follows the typical order of tasks in foundation construction, starting with the preparation of the site, excavation, filling, and finally the installation of the foundation structure.

Submit
6. Yang termasuk dalam sumber daya proyek sistem infromasi adalah:

Explanation

Semua jawaban benar karena sumber daya proyek sistem informasi meliputi sumber daya proyek, kategori sumber daya proyek, tim proyek dan organisasi, serta manajemen sumber daya manusia. Semua elemen tersebut berperan dalam pengembangan dan pengelolaan proyek sistem informasi.

Submit
7. Peningkatan kualitas perencanaan dan pengendalian dalam menghadapi sejumlah kegiatan dan kompleksitas pekerjaan proyek merupakan:

Explanation

The correct answer is "Tujuan penjadwalan" which translates to "scheduling objectives" in English. This answer suggests that the improvement of planning and control quality is one of the objectives of scheduling in order to effectively manage project activities and their complexities.

Submit
8. Salah satu komponen yang menjadi target utama dalam sebuah proyek adalah:

Explanation

One of the main components that is targeted in a project is time. This is because time plays a crucial role in project management and can greatly impact the success or failure of a project. Meeting deadlines and delivering the project on time is essential for client satisfaction and overall project success. Time management involves setting realistic timelines, prioritizing tasks, and ensuring efficient use of resources to complete the project within the allocated time frame.

Submit
9. Sifat-sifat beton, kecuali...

Explanation

The given answer is correct because it lists the properties of concrete that are not mentioned in the other options. The properties mentioned in the other options include "kuat hancur" (compressive strength), "susut" (shrinkage), and "kelecakan" (workability), which are also mentioned in the other options. However, "kuat tarik" (tensile strength), "kuat tekan" (flexural strength), and "elastisitas" (elasticity) are only mentioned in the given answer. Therefore, the given answer correctly identifies the properties of concrete that are not mentioned in the other options.

Submit
10. Pada tahap ini  dilakukan uji coba sistem yang telah selesai disusun.proses uji coba ini diperlukan untuk memastikan bahwa sistem tersebut sudah benar adalah tahap:

Explanation

The correct answer is "Evaluasi". In this stage, the system that has been developed is tested to ensure that it is functioning correctly. The evaluation process is necessary to identify any errors or issues and make any necessary improvements or adjustments before the system is implemented. This stage helps to ensure that the system meets the desired requirements and functions effectively.

Submit
11. cabang-cabang ilmu teknik sipil, kecuali ,.?

Explanation

The question is asking for the branches of civil engineering, except for one option. The correct answer is "ekonomi" (economics) because it is not a branch of civil engineering. The other options, "arsitek" (architecture), "informatika" (informatics), "sipil" (civil), and "pembangunan" (development), are all branches or related fields within civil engineering.

Submit
12. Pasir untuk beton diantaranya harus seperti pernyataan dibawah ini kecuali :

Explanation

The given answer is incorrect because the statement "Berbutir tajam dan keras" is actually one of the requirements for concrete sand. So, it should not be excluded. The correct answer should be "Tidak mengandung garam" because concrete sand should not contain any salt.

Submit
13. Kemampuan memotivasi orang lain, ketrampilan manajemen dan mengembangkan orang lain bagi seorang manajer proyek merupakan :

Explanation

The ability to motivate others, manage and develop others is a competence that falls under self-management. This means that a project manager should possess the skills to motivate and inspire their team members, effectively manage their tasks and responsibilities, and help them grow and develop professionally. This requires strong self-management skills, including self-awareness, self-control, and the ability to prioritize and manage one's own time and resources.

Submit
14. Yang bukan termasuk faktor efektif yang mempengaruhi suatu project management adalah:

Explanation

The factors that are effective and influence project management are usually related to the human resources, the processes followed, the project itself, and the products or deliverables. However, a program refers to a set of related projects, and it is not considered a factor that directly affects project management. Therefore, program is the correct answer as it does not fit into the category of factors that are effective and influence project management.

Submit
15. Langkah yang benar dalam pengerjaan plat beton bertulang Lantai II ádalah...

Explanation

The correct order of steps in the construction of reinforced concrete floor II is to first cut/bend the reinforcement, then create the formwork/template, next assemble the reinforcement, followed by pouring the concrete, and finally compacting the concrete. This sequence ensures that the reinforcement is properly prepared and installed before the concrete is poured, and that the concrete is compacted to achieve maximum strength and durability.

Submit
16. Yang tidak termasuk dalam tahapan pengembangan sistem Informasi adalah..

Explanation

The given options represent different stages in the development of an information system. Investigation involves gathering information about the current system and identifying problems. Analysis involves studying the gathered information and defining system requirements. Planning involves creating a roadmap for the development process. Financing involves securing the necessary funds for the development. Therefore, the stage that does not belong in the development of an information system is "Pembuatan" which means "making" or "creating" in English.

Submit
17. Berikut yang tidak termasuk didalam ruang lingkup pengelolaan proyek adalah 

Explanation

The given options include scope management, quality management, cost management, and time management, which are all components of project management. However, "planning management" is not a recognized term in project management. Planning is an essential part of project management, but it is typically encompassed within the overall project management process rather than being its own separate category. Therefore, planning management is not included in the scope of project management.

Submit
18. tahap kegiatan yang paling utama pada siklus hidup proyek adalah ?

Explanation

The correct answer is "Tahap Inisiasi" because the initiation phase is the most important stage in the project life cycle. This is where the project is defined, the objectives are set, and the feasibility of the project is assessed. It involves identifying the stakeholders, understanding their needs, and determining the resources required for the project. Without a proper initiation phase, the project may lack direction and clarity, leading to potential issues and failures later on.

Submit
19. Mengidentifikasi, mendokumentasi, memberikan peranan dan tanggung jawab serta hubungan pelaporan dalam sebuah proyek dalam kegiatan manajemen HR disebut:

Explanation

Organizational planning in HR management involves identifying, documenting, assigning roles and responsibilities, and establishing reporting relationships within a project. This process ensures that the project team is structured effectively, with clear communication channels and defined roles for each team member. By implementing organizational planning, HR managers can optimize the project's human resources and improve overall project performance.

Submit
20. Kegiatan yang berkaitan dengan faktor manusia dalam kegiatan project management adalah:   

Explanation

The correct answer is "organisasi". This is because organisasi (organization) is a key activity related to human factors in project management. It involves structuring and coordinating the resources, tasks, and responsibilities within the project team to ensure effective collaboration and achievement of project goals. Seleksi (selection), recruiting, and training are also important activities in managing human resources, but they are not specifically related to the organizational aspect of project management. Therefore, the correct answer is organisasi.

Submit
View My Results

Quiz Review Timeline (Updated): Mar 22, 2023 +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 22, 2023
    Quiz Edited by
    ProProfs Editorial Team
  • Apr 10, 2015
    Quiz Created by
    Syarkawi
Cancel
  • All
    All (20)
  • Unanswered
    Unanswered ()
  • Answered
    Answered ()
Hal-hal yang perlu diperhatikan dalam penanganan dan penyiapan bahan...
Jenis-jenis pekerjaan yang di tangani kontraktor, kecuali ..?
Manakah yang termasuk faktor-faktor penyebab kegagalan proyek..
Siapakah yang biasa mendelegasikan suatu proyek 
Susunan item pekerjaan yang ada pada pekerjaan pondasi yaitu ..?
Yang termasuk dalam sumber daya proyek sistem infromasi adalah:
Peningkatan kualitas perencanaan dan pengendalian dalam menghadapi...
Salah satu komponen yang menjadi target utama dalam sebuah proyek...
Sifat-sifat beton, kecuali...
Pada tahap ini  dilakukan uji coba sistem yang telah selesai...
Cabang-cabang ilmu teknik sipil, kecuali ,.?
Pasir untuk beton diantaranya harus seperti pernyataan dibawah ini...
Kemampuan memotivasi orang lain, ketrampilan manajemen dan...
Yang bukan termasuk faktor efektif yang mempengaruhi suatu...
Langkah yang benar dalam pengerjaan plat beton bertulang Lantai II...
Yang tidak termasuk dalam tahapan pengembangan sistem...
Berikut yang tidak termasuk didalam ruang lingkup pengelolaan proyek...
Tahap kegiatan yang paling utama pada siklus hidup proyek adalah...
Mengidentifikasi, mendokumentasi, memberikan peranan dan tanggung...
Kegiatan yang berkaitan dengan faktor manusia dalam kegiatan project...