This quiz titled 'high pressure boilers 2' assesses knowledge on safety equipment usage in hazardous environments, focusing on respiratory protection, hard hat standards, and chemical safety. It is crucial for ensuring workplace safety and compliance with health standards.
Proper training prior to use
The use be clean shaven daily
That is be self sanitizing
The face mask pressure be maintained slightly negative
Rate this question:
Low oxygen concentrations
Chemical fumes
Mineral dusts
Harmful gases
Rate this question:
1 in
0.74 in
0.50 in
1.27 in.
Rate this question:
4.5 psi
15 psi
4500 psi
2250 psi
Rate this question:
Face shield
Monogoggle
Safety goggle
Safety glasses
Rate this question:
Ask the foreman if is safe
Ask a qualified worker to indicate and explain the points of isolation
Check with a co worker before proceeding
Rely full on the permit information
Rate this question:
Plant safety committee
Operations dept.
Operating and maintenance dept.
Maintenance dept.
Rate this question:
Open the equipment drain valve
Close the equipment outlet valve
Notify the foreman
Enter the completed isolation's in the log book
Rate this question:
Close the discharge valve
Place a lock on the drain valve
Isolate the driver
Remove the belts
Rate this question:
Remove the fuses
Install a lockout clamp on the breaker handle
Place a do not operate tag on the breaker
Do all of the above
Rate this question:
Isolate drain and lock out boiler
Ventilate en-closer spaces
Notify boiler inspector
Cool down boiler for entry
Rate this question:
Too much noise to withstand
Equipment being used to become a hazard
The worker to refuse to perform his job
An accident
Rate this question:
Difficult place in which to maneuver
Breeding ground for bio hazardous infectious substances
Life threatening environment
Healthy environment
Rate this question:
Verify the operators isolation points throgh the plant safety committee
Estimate how long you will be there
Inform the plant manager of your whereabouts
Plan the entry using a confined space check lists
Rate this question:
True
False
Rate this question:
Is the required oxygen level measured and assured
Is the temp.in the space withing tolerable working limits
Is the confined space structurally safe and sound
Has the head of the plant safety dept. being notified
Rate this question:
Is expressed by the tare weight stamped on the cylinder
Must take into account liquid expansion due to temp. change
Is a function of the pressure within the unit as ambient temp
May be increased on approval from the DOT
Rate this question:
Steel
Poly carbonate
Brass
Lead
Rate this question:
Crack the connecting joint in order to purge it of excess gases
Check the areas for gases with an analyzer
Unchain the cylinder
Close the cylinder valve to prevent air entering the cylinder
Rate this question:
212 deg f
122 deg f
77 deg f
200 deg f
Rate this question:
Manufacturers symbol
Date the cylinder was tested for the first time
Ownership symbol
Date the cylinder was changed
Rate this question:
Result in a new test date being stamped on the cylinder
Subject the cylinder to a pressure equal to its working pressure
Subject the cylinder to a pressure of on and one half times
Remove any dents the cylinder may contain
Rate this question:
Rich
Lean
Invisible
At the auto lighten temp.
Rate this question:
All molecular vibration will cease
It will from a gas and burn
The liquid will burn
The vapors become inert
Rate this question:
Prevent injury to the worker
Prevent massive condensation of the steam with the tank
Flush the tank gradually
Reduce the risk of static electricity spark
Rate this question:
Pyrophoric effect
Static electric charge build up
Catalytic effect of the fresh metallic surface
Temp. of the mixture
Rate this question:
Lowest temp. at which a mixture will burn
Temp. at which it is said to have a lean mixture
Temp. at which the fuel may gel
Temp. at which the mixture is above the boiling temp.
Rate this question:
The circulator pump is off
The boiler has a valid inspection certificate
The low water fuel cutoff is in the tripped position
The boiler control is in the on position
Rate this question:
25% lower than operating pressure
10% lower than operating pressure
25% above operating pressure
20% lower than operating pressure
Rate this question:
Shut down the boiler immediately purge and restart it
Shut down the boiler close the fuel valves and determine the cause of the problem
Try to re light the burner immediately
Check the altitude gage to ensure there is enough water in the system
Rate this question:
203
250
302
334.4
Rate this question:
149
203
170.6
190
Rate this question:
Valves are in good operating condition
Furnace refractory is in order
Tubes are free of scale
Exterior of the tubes are in good condition
Rate this question:
Tubes rupturing
A furnace explosion
An unwanted high rate of water circulation
A foaming condition occuring
Rate this question:
Allow the super heater to warm up quickly
Prevent overheating of the super heater
Ensure drum level does not drop
Enhance boiler water circulation
Rate this question:
20.30 psi
21.03 psi
19.58 psi
18.85 psi
Rate this question:
An over pressure condition
A vacuum
Too much condensing of the steam
Loss of visible level in the sightglass
Rate this question:
Acidic
Neutral ph
Liquid
Alkaline
Rate this question:
Compressed oxygen
Water pressure
Steam pressure
Compressed air
Rate this question:
A hydro static test
An internal inspection
An external inspection
An overhaul
Rate this question:
Tube pitting
Carbon deposits
Moisture
Small salt traces
Rate this question:
Tight
Purged
Blown down
Unblocked
Rate this question:
10 to 1
20 to 1
15 to 2
Rate this question:
Boiler operator
Inspector
Boss
Contractor
Rate this question:
Drained, thoroughly dried out quick lime placed inside and left open
Drained,thorughly dried out quick lime placed inside and closed up
Left with the water at normal working level but open to atmoshere
Left with water at normal working level and pressurized
Rate this question:
Closing up the boiler
Ensuring all tools and debris have been removed from the boiler
Conducting a hydro-static test
Informing the boiler inspector the tube replacement is complete
Rate this question:
Shift engineer
Millwright
Pressure welder
Pipe fitter
Rate this question:
Black-light
Bulb
Neon bulb
Flashlight
Rate this question:
Quiz Review Timeline (Updated): Mar 19, 2023 +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.