This quiz will cover all URE multiple choice questions from Vol. 3 of the B-Set of Pavements and Construction Equipment Operator 5-Level upgrade course. All questions are taken directly from the UREs and the multiple choice options are the same. Correct answers reflect the correct answers from the CDC themselves and not necessarily the correct See moreanswers from the CERTest.
They are bolted together
They are welded together
They are held together with pins
Sandbags are palced against them
Rate this question:
Remove the damaged section
Replace the entire revetment
Weld patches over the damage
Cut the damaged panel and patch it
Rate this question:
ARMCO and barrels
Bitburg and ARMCO
Concrete bins and barrels
Bitburg and concrete bins
Rate this question:
Cotton liner
Plastic liner
Sandbag liner
Geofabric liner
Rate this question:
1
2
3
4
Rate this question:
Rebar
Zip strips
Angle irons
Connecting pins
Rate this question:
A-1
B-1
Concrete bins
Bitburg revetments
Rate this question:
Lean-to
Sandbag
Small piping
Steel planking
Rate this question:
Log
Lean-to
Sandbag
Metal planking
Rate this question:
Reduce voids around the culvert
Give more strength to the culvert
Keep debris from falling into the culvert
Give the culvert a better water-tight seal
Rate this question:
Determine if the bridge is a permanent or temporary type of construction
Ensure the bridge is constructed according to its projected use
Ensure the bridge is constructed to withstand heavy loads
Decide where the bridge is to be located
Rate this question:
Peace time
Dry periods
Nighttime
Freezing weather
Rate this question:
Reduce the cement content
Make the areas easier to work
Lessen the equipment that is needed
Make it possible to complete and area in one working day
Rate this question:
A spring
A mjor highway
Railroad tracks
Power lines
Rate this question:
1 foot of material
2 feet of material
3 feet of material
4 feet of material
Rate this question:
Top of berm
Lower center of the berm
Lower outside of berm
Stones under 10 pounds should never be used
Rate this question:
Above ground level
Below ground level
Constructed from earth fill
Constructed with a flat top
Rate this question:
Sod
Clay
Soil-cement
All of the above
Rate this question:
Flood the berm with water
Dump sand into the berm
Pump the fuel out
Open the drain
Rate this question:
Construct fire breaks
Slope the lagoon walls
Dispose of excess materials
Secure the area with fencing
Rate this question:
Increase evaporation
Act as irrigation valves
Increase the lagoon intake
Control the operating depth
Rate this question:
Quick and complete draining
To increase the storage capacity
Maintain the berm walls
To decrease vegetation
Rate this question:
Window sections
End sections
Tent frame
The fly
Rate this question:
Snaps
Beckets
Zippers
Buttons
Rate this question:
1
2
3
5
Rate this question:
Before you remove the liner
Before you start disassembly
After you remove the tent frame
After you remove all internal components
Rate this question:
Temper Tent system
GP Medium system tent
GP Large system tent
Small Shelter System
Rate this question:
50 knots
40 knots
30 knots
20 knots
Rate this question:
1
2
3
4
Rate this question:
Mid liner
End liner
Side liner
Any liner
Rate this question:
12 inches
15 inches
24 inches
30 inches
Rate this question:
10 days
20 days
30 days
60 days
Rate this question:
Monthly intervals
Quarterly intervals
Four month intervals
Six month intervals
Rate this question:
1 inch
2 inches
3 inches
4 inches
Rate this question:
0
1
2
3
Rate this question:
None
One
Two
Three
Rate this question:
Argon
Oxygen
Acetone
Nitrogen
Rate this question:
Red and green respectively
Green and black respectively
Green and black or red or maroon respectively
Red or black and maroon or green respectively
Rate this question:
To loosen the cylinder valve
To see if there is pressure in the cylinder
To blow out any dirt lodged in the outlet nipple
The cylinder valves should not be opened before the regulators are attached
Rate this question:
1 turn
1-1/4 turns
1-1/2 turns
1/2 turn
Rate this question:
Acetylene connections have right hand threads and and oxygen connections have left hand threads
Acetylene connections have left hand threads and and oxygen connections have right hand threads
All connections have right hand threads
All connections have left hand threads
Rate this question:
Oxygen valve first
Acetylene valve first
Oxygen and acteylene valves 1-1/2 turns
Oxygen and acetyelene valves all the way open
Rate this question:
It has a high percentage of oxides in it
Because there is not enough oxygen in the air to burn the acetylene completely
It has a high percentage od nitrides in it
There is not enough hydrogen in the air to burn the acetylene completely?
Rate this question:
Neutral
Oxidizing
Acetyelene
Carbonizing
Rate this question:
Cylinder valves?
Flashback arresters
Oxygen torch valves
Acetylene torch valves
Rate this question:
Turn the adjusting screw counter clockwise
Open both torch valves at the same time
Open the torch valves one at a time
Turn the adjusting screw clockwise
Rate this question:
Oxygen torch valve
Actyelene torch valve
Oxygen cylinder valve
Oxygen and actylene valves simultaneously
Rate this question:
By a trigger or lever
Through a release valve
Through the central orifice
Through the oxygen regulator
Rate this question:
Quiz Review Timeline (Updated): Mar 22, 2023 +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.