Quiz: Development Of Housing And Condominium Projects!

100 Questions | Total Attempts: 1617

SettingsSettingsSettings
Quiz: Development Of Housing And Condominium Projects! - Quiz

How much do you know about the development of housing and condominium projects? One cannot just pick a spot and build anything they want, and this is because certain areas have laws and regulations on what one can build in an area, how and even with what. Do you know some of the guidelines to be followed in housing? Take the quiz and find out!


Questions and Answers
  • 1. 
    Amends the Sec. 31 of P.D. 957 on provision of open spaces in a residential subd. project
    • A. 

      PD 1216

    • B. 

      PD 9161

    • C. 

      RA 1216

    • D. 

      RA 9161

  • 2. 
    Development permit issued by a local government unit for a subdivision project is valid for?
    • A. 

      1 years

    • B. 

      5 years

    • C. 

      10 years

    • D. 

      3 year

  • 3. 
    The maximum allowable road grade (slope) of a major road in a residential subdivision project is?
    • A. 

      18%

    • B. 

      15%

    • C. 

      20%

    • D. 

      12%

  • 4. 
    The maximum length of block for a residential subdivision project: is?
    • A. 

      200 meters

    • B. 

      250 meters

    • C. 

      300 meters

    • D. 

      150 meters

  • 5. 
    The minimum front setback of dwelling unit for economic and socialized housing?
    • A. 

      1.5 meters

    • B. 

      2 meters

    • C. 

      3 meters

    • D. 

      2.5 meters

  • 6. 
           Under PD 957, the minimum area of  “open space” in a residential subdivision with an area of 1 hectare and above for adequate roads, alleys, sidewalks and for parks or recreational is?
    • A. 

      30% of the total area of the subdivision projects

    • B. 

      20% of the total area of the subdivision projects

    • C. 

      25% of the total area of the subdivision projects

    • D. 

      None of the above

  • 7. 
    Under BP 220, the open space requirement of  66 to 100 families lot per gross area for parks and playgrounds for residential subdivision with an area of 1 hectare and above is?
    • A. 

      3.5%

    • B. 

      7%

    • C. 

      10%

    • D. 

      9%

  • 8. 
    What is the subdivision’s price ceiling for open market housing under PD 957? 
    • A. 

      P1,000,000

    • B. 

      P1,250,000

    • C. 

      No price selling

    • D. 

      None of the above

  • 9. 
    Minimum lot area for residential open market housing under  PD 957 is?
    • A. 

      100 SQ.M.

    • B. 

      120 SQ.M.

    • C. 

      75 SQ.M.

    • D. 

      125 SQ.M.

  • 10. 
    Open market residential housing under  PD 957 minimum lot frontage?
    • A. 

      10 SQ.M.

    • B. 

      8 SQ.M.

    • C. 

      5 SQ.M.

    • D. 

      12 SQ.M.

  • 11. 
    In a residential open market housing under  PD 957 with an alley of 4 meters right of way, carriageway measurement is? 
    • A. 

      2.5 meters

    • B. 

      6 meters

    • C. 

      4 meters

    • D. 

      5 meters

  • 12. 
    In a residential open market housing under  PD 957 with a right of way of 15 meters, its Planting strip measurement is?
    • A. 

      1.5 meters

    • B. 

      1.3 meters

    • C. 

      1 meter

    • D. 

      0.5 meter

  • 13. 
     In a residential open market housing under  PD 957 shelter component minimum floor area is?
    • A. 

      42 SQ.M.

    • B. 

      40 SQ.M.

    • C. 

      30 SQ.M.

    • D. 

      None of the above

  • 14. 
    In a residential open market housing under  PD 957 easement or setback in the rear is?
    • A. 

      2 meters

    • B. 

      1.5 meters

    • C. 

      3 meters

    • D. 

      1 meter

  • 15. 
    Low Cost Housing  is not covered by 30% open space requirement, open space requirement is base on?
    • A. 

      Density of the project

    • B. 

      Quantity of the project

    • C. 

      Volume of the project

    • D. 

      None of the above

  • 16. 
    In Low Cost Housing, parks & playground open space area requirements for 150 & below dwelling unit per hectare is?
    • A. 

      3.5 %

    • B. 

      1.5 %

    • C. 

      2.5 %

    • D. 

      3.0 %

  • 17. 
    Delivery of the condominium certificate of title from the date of full payment is ?
    • A. 

      30 days

    • B. 

      60 days

    • C. 

      45 days

    • D. 

      None of the above

  • 18. 
    Owner/developer shall construct & provide the facilities/improvements/infrastructures within?
    • A. 

      TWO YEARS FROM THE DATE OF ISSUANCE OF LICENSE TO SELL

    • B. 

      SIX MONTHS FROM THE DATE OF ISSUANCE OF LICENSE TO SELL

    • C. 

      ONE YEAR FROM THE DATE OF ISSUANCE OF LICENSE TO SELL

    • D. 

      None of the above

  • 19. 
    In a residential open market housing under  PD 957 easement or setback in front is?
    • A. 

      3 METERS

    • B. 

      5 METERS

    • C. 

      3.5 METERS

    • D. 

      4 METERS

  • 20. 
    In a residential open market housing under  PD 957 easement or setback in the side is?
    • A. 

      1 METERS

    • B. 

      2.5 METERS

    • C. 

      3 METERS

    • D. 

      2 METERS

  • 21. 
    Parks/playground maybe donated to the HOA with consent of the LGU  
    • A. 

      True

    • B. 

      False

  • 22. 
    What is the minimum measurement for access road or right of way for condominium open market housing under PD 957?
    • A. 

      6 METERS

    • B. 

      8 METERS

    • C. 

      10 METERS

    • D. 

      NONE OF THE ABOVE

  • 23. 
    What is the open space requirement of  20 families lot per gross area for parks and playgrounds in a residential subdivision with an area of 1 hectare and above ?
    • A. 

      3.5%

    • B. 

      5%

    • C. 

      3%

    • D. 

      7%

  • 24. 
    In a residential open market housing under  PD 957 with a right of way of 15 meters, what is its sidewalk measurement?
    • A. 

      1.2 METERS

    • B. 

      1.5 METERS

    • C. 

      2.5 METERS

    • D. 

      1 METER

  • 25. 
    In a residential open market housing under  PD 957 with a right of way of 6.5 meters,  sidewalk measurement is?
    • A. 

      2 METERS

    • B. 

      1.5 METERS

    • C. 

      1 METER

    • D. 

      0.5 METER

Back to Top Back to top