2AX7X 2013 Volume 2

70 Questions | Attempts: 1358
Share

SettingsSettingsSettings
2AX7X Quizzes & Trivia

2AX7X 02 1110, Edit Code 5


Questions and Answers
  • 1. 

    Training detachments (TDs) are administratively assigned to which majcom?

    • A.

      Air combat command

    • B.

      Air training command

    • C.

      Air reserve command

    • D.

      Air education and training command

    Correct Answer
    D. Air education and training command
  • 2. 

    The block training method is normally used to each which maintenance training flight (mtf) training course?

    • A.

      And 7lvl course

    • B.

      Weight and balance

    • C.

      Maintenance orientation

    • D.

      General technical order system

    Correct Answer
    C. Maintenance orientation
  • 3. 

    How often must the maintenance operations officer/maintenance superintendent review and sign the special certification roster (scr)

    • A.

      Annually

    • B.

      Semi-annually

    • C.

      Quarterly

    • D.

      Monthly

    Correct Answer
    B. Semi-annually
  • 4. 

    In order to be given authority to downgrade a "red-x" an individual must be approved by the maintenance group commander and hold the minimum grade of

    • A.

      TSgt

    • B.

      MSgt

    • C.

      SMSgt

    • D.

      CMSgt

    Correct Answer
    B. MSgt
  • 5. 

    TBA provides AF personnel with global, real-time

    • A.

      Access to distance learning courseware

    • B.

      Access to special certification roster criteria listings

    • C.

      Visibility of available formal training courses AF-wide

    • D.

      Visibility of technical qualifications, certifications, and training statuses of personnel

    Correct Answer
    D. Visibility of technical qualifications, certifications, and training statuses of personnel
  • 6. 

    In the TBA, what type of notification does the "system messages" board provide in addition to software releases, projected dowtimes, and training update info?

    • A.

      Open suspenses

    • B.

      System upgrades

    • C.

      Application problems

    • D.

      Changes to your user roles

    Correct Answer
    C. Application problems
  • 7. 

    What training phase has these four sub-phases: multiphase, majcom mandatory, freeflow, and maintenance qualification training?

    • A.

      1

    • B.

      2

    • C.

      3

    • D.

      4

    Correct Answer
    B. 2
  • 8. 

    What continuation training consists of academic and practical hands-on courses that complement initial skills training received through aetc mission ready airman (MRA) and  training detachment courses?

    • A.

      Maintenance qualification

    • B.

      maintenance refresher

    • C.

      On-the-job

    • D.

      Ancillary

    Correct Answer
    A. Maintenance qualification
  • 9. 

    How often does the maintenance training flight provide a status of training briefing to the maintenance group commander?

    • A.

      Monthly

    • B.

      Quarterly

    • C.

      Semiannually

    • D.

      Annually

    Correct Answer
    A. Monthly
  • 10. 

    An individual comes due for a training recertification while TDY, on leave, or incapacipated.  provided it has not been more than 60 days since the original due date, how many days are allowed after returning before decertification is required?

    • A.

      15

    • B.

      30

    • C.

      45

    • D.

      60

    Correct Answer
    B. 30
  • 11. 

    Who is responsible for conducting an interview with both the trainee and his/her supervisor before a trainee starts a career development course?

    • A.

      Operations officer

    • B.

      Group commander

    • C.

      Unit training manager

    • D.

      Maintenance training flight commander or chief

    Correct Answer
    C. Unit training manager
  • 12. 

    Manpower authorizations are

    • A.

      Funded

    • B.

      Unfunded

    • C.

      Both funded and unfunded

    • D.

      Both funded and unfunded

    Correct Answer
    A. Funded
  • 13. 

    A meeting to discuss manning issues in the maintenance group is normally held

    • A.

      Weekly

    • B.

      Monthly

    • C.

      Quarterly

    • D.

      Semiannually

    Correct Answer
    B. Monthly
  • 14. 

    The maximum continuous duty time you can schedule your workers for without getting maintenance group commander approval is

    • A.

      12 hrs

    • B.

      13 hrs

    • C.

      14 hrs

    • D.

      15 hrs

    Correct Answer
    A. 12 hrs
  • 15. 

    Maintenance group commanders are the final approval authority for exceeding a 12-hour shift up to

    • A.

      14 hrs

    • B.

      15 hrs

    • C.

      16 hrs

    • D.

      18 hrs

    Correct Answer
    C. 16 hrs
  • 16. 

    Which agency is normally responsible for monitoring the overall maintenance supply interface and resolving supply support problems?

    • A.

      Maintenance supply liason

    • B.

      Maintenance supply support

    • C.

      Maintenance operations center

    • D.

      Maintenance data system analysis

    Correct Answer
    A. Maintenance supply liason
  • 17. 

    Maintenance supply liason personnel report directly to the commander of the

    • A.

      Maintenance squadron

    • B.

      Logistics readiness squadron

    • C.

      Aircraft maintenance squadron

    • D.

      Maintenance operations squadron

    Correct Answer
    B. Logistics readiness squadron
  • 18. 

    Which of the following is not normally a maintenance supply liason duty?

    • A.

      Monitoring status of back-ordered requisitions

    • B.

      Advising supervisors on supply managenment documents

    • C.

      Soliciting and consolidating inputs to initiate a quick reference list

    • D.

      Collecting and turning in expendable, excess, and surplus precious metal bearing assets

    Correct Answer
    D. Collecting and turning in expendable, excess, and surplus precious metal bearing assets
  • 19. 

    The assets in a high priority mission support kit (hpmsk) should be transferred into the host base's standard base supply system account after how many days?

    • A.

      15

    • B.

      30

    • C.

      45

    • D.

      60

    Correct Answer
    B. 30
  • 20. 

    Which expendability, recoverability, and reparability codes (ERRC) must be assigned to an asset before it can be placed in bench stock?

    • A.

      Xf3

    • B.

      Xd2

    • C.

      Xd1

    • D.

      Xb3

    Correct Answer
    D. Xb3
  • 21. 

    The goal for bench stock assets is to establish levels to provide how many days of supply?

    • A.

      30

    • B.

      60

    • C.

      90

    • D.

      120

    Correct Answer
    A. 30
  • 22. 

    Provided it is still serviceable, which type of a shelf life item are you allowed to inspect and re-mark with a new expiration date?

    • A.

      1

    • B.

      2

    • C.

      3

    • D.

      4

    Correct Answer
    B. 2
  • 23. 

    Who in the maintenance group is responsible for ensuring the capability exists to meet local manufacture requirements?

    • A.

      MXG commander

    • B.

      MXG superintendent

    • C.

      MXG deputy commander

    • D.

      Maintenance squadron (MXS) operations officer/maintenance superintendent (MX SUPT)

    Correct Answer
    D. Maintenance squadron (MXS) operations officer/maintenance superintendent (MX SUPT)
  • 24. 

    What agency acts as a central repository of engineering drawings and other engineering data?

    • A.

      Audio visual center

    • B.

      Engineering data service center

    • C.

      AF primary standards laboratory

    • D.

      Communication and information system

    Correct Answer
    B. Engineering data service center
  • 25. 

    Which of the following is not an obvious sign of pollution?

    • A.

      Oil sheen on standing water

    • B.

      Stressed vegetation

    • C.

      Stains on ground

    • D.

      Cloudy water

    Correct Answer
    D. Cloudy water
  • 26. 

    Who is responsible for developing a hazard communication training plan to notify personnel of all known hazards they may be exposed to in a particular workcenter?

    • A.

      Operations officer

    • B.

      Section supervisor

    • C.

      Squadron commander

    • D.

      Squadron safety monitor

    Correct Answer
    B. Section supervisor
  • 27. 

    Which tag should you use to document that a part has been properly drained and/or purged?

    • A.

      Afto form 20, caution tag

    • B.

      Dd form 1574, serviceable tag-material

    • C.

      Dd form 1577-1 unserviceable tag

    • D.

      Dd form 1577-2, unserviceable tag (repairable)

    Correct Answer
    A. Afto form 20, caution tag
  • 28. 

    Who must appoint an individual to be an equipment account custodian?

    • A.

      Section supervisor

    • B.

      Squadron commander

    • C.

      Flight commander/chief

    • D.

      Operations officer/maintenance superintendent

    Correct Answer
    B. Squadron commander
  • 29. 

    What specific block of supply training must an individual receive before assuming duties as a due-in from maintenance (DIFM) monitor?

    • A.

      1

    • B.

      3

    • C.

      2b

    • D.

      2a

    Correct Answer
    C. 2b
  • 30. 

    What form is used to document all report of surveys (ROS)?

    • A.

      Af imt 453, report of survey register

    • B.

      Af imt 1185, statement of record data

    • C.

      Dd form 362, statement of charges/cash collection voucher

    • D.

      Dd form 200, financial liability, investigation of property loss

    Correct Answer
    D. Dd form 200, financial liability, investigation of property loss
  • 31. 

    Which LRS office accounts for special purpose recoverable authorized maintenance (SPRAM) assets managed on in-use detail records?

    • A.

      Flight service center (FSC)

    • B.

      Equipment liason office (ELO)

    • C.

      Command equipment management office (CEMO)

    • D.

      Defense reutilization and marketing office (DRMO)

    Correct Answer
    B. Equipment liason office (ELO)
  • 32. 

    Unless delegated, who is responsible for reviewing all requests for special purpose recoverable authorized maintenance (SPRAM) authorizations submitted by SPRAM custodians?

    • A.

      LRS commander

    • B.

      MXG deputy commander

    • C.

      Mission support group commander

    • D.

      MXG commander

    Correct Answer
    C. Mission support group commander
  • 33. 

    Which precious metals indicator code (PMIC) indicates that an item of supply contains a combination of two or more precious metals?

    • A.

      A

    • B.

      C

    • C.

      G

    • D.

      P

    Correct Answer
    B. C
  • 34. 

    Which supply tracking document provides information on all document numbers processed during the day?

    • A.

      D18, priority monitor report

    • B.

      D04, daily document register

    • C.

      M-24, organization effectiveness report

    • D.

      D23, repair cycle asset managment list

    Correct Answer
    B. D04, daily document register
  • 35. 

    Which supply tracking document is produced daily and lists all back-ordered parts with an urgency of need (UND) code of A?

    • A.

      D18, priority monitor report

    • B.

      D04, daily document register

    • C.

      M-24, organization effectiveness report

    • D.

      D23, repair cycle asset managment list

    Correct Answer
    A. D18, priority monitor report
  • 36. 

    Which supply tracking document provides a management product for monitoring issue and bench stock supply support?

    • A.

      D18, priority monitor report

    • B.

      D04, daily document register

    • C.

      M-24, organization effectiveness report

    • D.

      D2, repair cycle asset managment list

    Correct Answer
    C. M-24, organization effectiveness report
  • 37. 

    Who must authorize temporary storage of in-tranit classified material in cargo security cages and alarmed rooms?

    • A.

      Aircraft commander

    • B.

      Host installation commander

    • C.

      Operations group commander

    • D.

      Mission support group commander

    Correct Answer
    B. Host installation commander
  • 38. 

    When the aircraft owner or user does not stay with an aircraft which has secret or confidential equipment, installed, she/he must arrange for security checks to be accomplished every

    • A.

      Hour

    • B.

      2 hours

    • C.

      3 hours

    • D.

      4 hours

    Correct Answer
    C. 3 hours
  • 39. 

    Who is the final authority for reviewing a unit's list of supply assets requiring functional check, calibration, or operational flight programming?

    • A.

      Flight commander/chief

    • B.

      Maintenance group commander

    • C.

      LRS chief inspector

    • D.

      MX operations officer (MOO)/ maintenance superintendent (MX SUPT)

    Correct Answer
    C. LRS chief inspector
  • 40. 

    Who is responsible for determining the appropriate supply delivery priority for a parts requests?

    • A.

      Customer

    • B.

      Maintenance supply support

    • C.

      Maintenance supply liason

    • D.

      LRS customer service

    Correct Answer
    A. Customer
  • 41. 

    Which urgency justification codes (UJCs) are used to show a supply request for bits and pieces to repair a LRU or shop replaceable unit (SRU) spare?

    • A.

      IA or JA

    • B.

      AR or BR

    • C.

      AA or AM

    • D.

      BM or CM

    Correct Answer
    B. AR or BR
  • 42. 

    Before a supply point can be established and located in a maintenance work area, who must maintenance coordinate with?

    • A.

      LRS flight service center

    • B.

      MXG QA

    • C.

      MXG maintenance data system analysis

    • D.

      LRS material management element

    Correct Answer
    D. LRS material management element
  • 43. 

    Once established, how often must supply point accounts be reconciled by the workcenter supply point monitor?

    • A.

      Annually

    • B.

      Semiannually

    • C.

      Quarterly

    • D.

      Montly

    Correct Answer
    B. Semiannually
  • 44. 

    When a MICAP part issues and is placed in the TNB, supply personnel notify the

    • A.

      Operations officer

    • B.

      Aircraft section flight chief

    • C.

      Maintenance operations center (MOC)

    • D.

      AMU P&S dedicated scheduler

    Correct Answer
    C. Maintenance operations center (MOC)
  • 45. 

    When the goal is to get a refund or a new item in exchange, what type of deficiency report is submitted?

    • A.

      DR

    • B.

      Supply discrepancy report

    • C.

      Maintenance cross-tell report

    • D.

      PQDR

    Correct Answer
    B. Supply discrepancy report
  • 46. 

    Who has the responsibility for overall DR program managment for the submitting organizatioin or group?

    • A.

      Originator

    • B.

      Action point

    • C.

      Screening point

    • D.

      Originating point

    Correct Answer
    D. Originating point
  • 47. 

    Who acts as the DR focal point between the support point and submitting organization?

    • A.

      Originator

    • B.

      Action point

    • C.

      Screening point

    • D.

      Originating point

    Correct Answer
    B. Action point
  • 48. 

    Which is not normally a MXG TO distribution office (TODO) duty?

    • A.

      Establishing technical order distribution account (TODA) sub-accounts as required

    • B.

      Assisting units in establishing additional TODO accounts

    • C.

      Advising MXG/CC on TO availability

    • D.

      Resolving TO availability problems

    Correct Answer
    A. Establishing technical order distribution account (TODA) sub-accounts as required
  • 49. 

    What maintenance operations flight section is responsible for periodically reviewing maintenance information system products to ensure proper documentation and management of time compliance technical orders by owning and managing agencies? 

    • A.

      Maintenance supply liason

    • B.

      Maintenance operations center

    • C.

      Maintenance management analysis

    • D.

      Plans, scheduling, and documentation

    Correct Answer
    D. Plans, scheduling, and documentation
  • 50. 

    Once a category 1 deficiency is discovered, a DR must be submitted to the screening point within

    • A.

      8 hrs

    • B.

      16 hrs

    • C.

      24 hrs

    • D.

      32 hrs

    Correct Answer
    C. 24 hrs

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 20, 2022
    Quiz Edited by
    ProProfs Editorial Team
  • Jul 02, 2013
    Quiz Created by
    Marc025

Related Topics

Back to Top Back to top
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.