Related Topics
Take Another Quiz

Hazwoper 40 Hr Pretest

6 Questions
Hazwoper 40 Hr Pretest

Pretest I put together for my son and friend taking a 40 hr hazwoper certification class

Questions and Answers
  • 1. 
    Osha's regulatory standard for respiratory protection is covered in
    • A. 

      29 cfr 1910.1200

    • B. 

      29 cfr z-1a

    • C. 

      29 cfr 1910.134

    • D. 

      29 cfr 1910.120

  • 2. 
    Industrial First Reaponders and Hazmat Team personnel are:
    • A. 

      Not required to participate in a Medical Surveillance Program

    • B. 

      Required to participate only in part of Medical Surveillance Program

    • C. 

      Required to participate in a Medical Surveillance Program for 5 years.

    • D. 

      Required to participate in a Medical Surveillance Program

  • 3. 
    The group responsible for Health & Safety of employees in the Uninted States is:
    • A. 

      Occupational Safety & Health Administration (OSHA)

    • B. 

      American National Standards Institute (ANSI)

    • C. 

      National Institute of Occupational Safety & Health (NIOSH)

    • D. 

      American Conference of Governmental Industrial Hygienist (ACGIH)

  • 4. 
    • A. 

      American Conference of Governmental Industrial Hygienist (ACGIH)

    • B. 

      American National Standards Institute (ANSI)

    • C. 

      Occupational Safety & Health Administration (OSHA)

    • D. 

      National Institute of Occupational Safety & Health (NIOSH)

  • 5. 
    In Hazmat Response Operation ____ % oxygen in air is considered the Lowest Safe working concentration
    • A. 

      21.9

    • B. 

      20.5

    • C. 

      19.1

    • D. 

      19.5

  • 6. 
    The requlatory limit for the length of Supplied Air Line hose is:
    • A. 

      300 feet

    • B. 

      200 feet

    • C. 

      150 feet

    • D. 

      100 feet

    • E. 

      MSHA/NIOSH certification limits hose length to 300 feet (90 meters). As the length of the hose is increased, the minimum approved air flow may not be delivered at the face piece.