Ohio EPA Approval #: OTCO-S13423-OM 4.50 CONTACT HOURS

If you have any questions please contact our for office at 614-268-6826 or email [email protected]

5 Sample Questions

Without receiving an application for the general permit to install, the director may prepare and issue a general permit to install that covers the installation of any of the following, within a specific geographic area:
Select all that apply:

  • A. External fat, oil and grease interceptors
  • B. Sewer extensions
  • C. Remediation of ground water utilizing pump and treat systems
  • D. Cooling towers

The director may issue a general permit to install or renew a general permit to install if, on the basis of all information available to Ohio EPA, the director determines the following:
Select all that apply

  • A. The installation of the disposal system will be protective of public health and the environment
  • B. The installation of the disposal system is more appropriately covered by a general permit to install than an individual permit to install
  • C. Technology and standards exist that make it reasonable to issue a general permit to install
  • D. The criteria specified in rule 3745-42-04 are  not met.

No person is authorized to install a disposal system under the coverage of a general permit to install until the director issues a verbal approval that the disposal system has obtained coverage under a general permit to install.

  • A. True
  • B. False

Each person who wishes to obtain coverage under a general permit to install in order to install a disposal system shall submit to the director, or an authorized representative, __________________in accordance with the deadlines specified in the general permit to install.

  • A. a notice of intent
  • B. an alternative general permit
  • C. a renewal general permit
  • D. a notice of termination of previous permit

A general permit to install shall be automatically terminated unless construction is initiated within __________________ after the date the director grants coverage.  

  • A. 6 months
  • B. 12 months
  • C. 18 months
  • D. 24 months

More by RaShawn Truss

OTCO Class A Wastewater Course (For STS Renewals)

The objective in using this Ohio EPA Class A Training Manual course to to educate individuals on the basics of wastewater treatment from a small system perspective or to borrow a phrase from Dr. John Buchanon: "Small Pipe People". Being a 'Big Pipe Person" since 1976 and a Class III Wastewater Operator since 1987, I can easily take for granted the knowledge one can acquire regarding the efforts to protect our natural, renewal resource: Water let us not forget we are to protect public's health. This particular manual was a labor of love from the Ohio EPA's Compliance Assistance Unit also know as the USEPA Region V, 104g training group. I thank the Ohio EPA for supporting their efforts since the 1980's. I particular want to recognized one of the humble unsung heroes of our profession Mr. Keith Kroeger. Keith retired in 2015 from Ohio EPA was a driving force for small wastewater systems outreach in throughout Ohio.  Keith Kroeger, thank you and enjoy your retirement. Rick                  Keith                Rick              John Established by Section 104(g)(1) of the Federal Clean Water Act, the four CAU members help bring wastewater treatment plant (WWTP) facilities into compliance and/or to maintain compliance. Our goal is to improve the water quality of our streams, rivers, and lakes by assisting WWTPs that need help in meeting their National Pollution Discharge Elimination System (NPDES) permit. The Compliance Assistance Program seldom works without total commitment from community officials. In order to achieve success, we need the same level of commitment from everyone involved: village administrators, superintendents, plant operators, etc.

$90