WHEN LIFTING ABOVE 600FT
WHEN LIFTING WEIGHT OVER 15,000 LBS
IN HIGH HEAT CONDITIONS
WHEN RIGGING FROM 3 POINTS
CRANE OPERATOR AND RIGGER
PIPEFITTER & MILLWRIGHT
PROCESS OPERATOR AND BOILER MAKER
LABOR & PIPEFITTER
3 LEGGED V-TOP JACKS
4 LEGGED ROLLER TOP JACKS
3 LEGGED ROLLER TOP JACKS
PIPE FITTER CHAIN WISE
BASKET HITCH
CHOKER HITCH
BRIDLE HITCH
GROMMET HITCH
BEFORE THE LAST 2 BOLTS ARE REMOVED FROM EACH CLIP
BEFORE ANY BOLTS ARE REMOVED OR ANY CUTTING IS DONE ON THE BEAM
AFTER THE LAST TWO BOLTS HAVE BEEN REMOVED BUT BEFORE ANY CUTTING IS DONE ON THE BEAM
AFTER CUTTING IS DONE ON THE BEAM
ASBESTOS
CORETEN
HOT SLAG
INCONEL
LOCKING, TAGGING, AND BLINDING LINES THAT FEED THE VESSEL
BLINDING ALL LINES THAT ENTER THE VESSEL
LOCKING AND TAGGING VALVES THAT FEED THE VESSEL
BLEEDING LINES THAT FEED THE VESSEL
10 FT
15 FT
20 FT
50 FT
MAKE SURE A PROPER PERMIT HAS BEEN OBTAINED
DETERMINE THE CONTENT
MAKE SURE THE VESSEL IS COMPLETELY EMPTY
LAY THE VESSEL ON ITS SIDE
A 2 FOOT LEVEL
A STRING LEVEL
A POCKET SCALE
A WATER LEVEL
ROLLING MOTORS AND EXPANDERS
ROLLING BITS AND EXPANDERS
ROLLING BARLS AND EXPANDERS
ROLLING PINS AND EXPANDERS
THE RIGHT HAND THREAD IS FOR OXYGEN USE ONLY
THE LEFT HAND THREAD IS FOR OXYGEN USE ONLY
THE RIGHT HAND THREAD IS FOR ACETYLENE USE ONLY
THE LEFT HAND THREAD IS FOR ACETYLENE USE ONLY
HEATING IRON
GRINDER
SOLDERING COPPER
OXYFUEL TORCH
MOST ACETYLENE CYLINDERS ARE TOO SMALL TO PUT OUT ON THIS VOLME FOR FLOW
IT COSTS THE COMPANY MONEY
ACETYLENE IS UNSTABLE ABOVE THIS PRESSURE
MOST CUTTING TORCHES WILL NOT ACCEPT THIS PRESSURE
REMOVE THE TUBE AND DO NOT REPLACE
PLUG THE TUBE INSIDE THE STEAM DRUM
REPLACE THE FAILED TUBE
REPLACE THE BOILER
THE CROWN SEAL MUST BE REMOVED
THE FUEL GAS VALVE MUST BE SHUT
THE LUBE OIL VALVE MUST BE SHUT
THE QUENCH OIL VALVE MUST BE SHUT
BLUE MUD
INCONEL
FIRE BRICK
PLASTIC
MINIMUM WEIGHT TESTED
MINIMUM WALL THICKNESS
MAXIMUM WEIGHT TESTED
MAXIMUM WALL THICKNESS
COORDINATES
REVISION BLOCK
TITLE BLOCK
NOTES
INCHES AND FEET
METRIC TONS
DECIMAL FORM
YARDS
ISOMETRIC
MECHANICAL FLOW DIAGRAM
PLAN VIEW
SIDE VIEW
TOP OF STEEL ON THE EMBEDED RING (BASE PLATE)
TOP OF CONCRETE ON THE VESSEL FOUNDATION
TOP OF GROUT ON THE VESSEL FOUNDATION
BOTTOM OF STEEL ON THE EMBEDED RING (BASE PLATE)
PRODUCT MUST BE DRAINED FROM THE LINE
VALVE MUST BE IN CLOSED POSITION
LINE MUST BE BLINDED UPSTREAM FROM THE VALVE
LINE MUST BE BLINDED DOWNSTREAM FROM THE VALVE
BREAKING DIFFICULT BOLTS
ADJUSTING BUBBLE CAPS
ALIGNING FLANGES
PRYING FLANGES APART
3 WAY VALVES
GATE VALVES
GLOBE VALVES
PLUG VALVES
MSDS
NBIC
MATERIAL TEST REPORT
P4 REPORT
BODY, HARDWARE, BOLTS, AND GASKET
BONNET, PACKING, PROCESS, AND FLOW
BODY, BONNET, GATE, AND STREAM
GATE, FLOW, PACKING, AND BOLTS
MASTIC
EPOXY
THREADED
KEYWAY
FOREMAN
PROJECT MANAGER
QA/QC
BOILERMAKER
ROLLING MOTOR
GRINDER
MILLING MOTOR
FLAT FILE
GRINDER
FLAPPER WHEEL
CHIPPINH GUN
MILLING MACHINE
NO PREPARATIONS MUST BE MADE
PUT THE TRAVEL STOPS IN THE SPRING
REMOVE THE TRAVEL STOPS AND SET THE HANGERS
SET THE SPRING TO TEST MODE
C-CLAMPS, THREADED RODS, BEAM CLIPS
TURNBUCKLES, BEAM CLIPS, C-CLAMPS
EYE BOLTS, TURNBUCKLES, THREADED RODS
EYE BOLTS, TURN STALLS, BEAM CLIPS
INDUSTRIAL GRADE ROPE
WOOD SCREWS
12D NAILS
#9 TIE WIRE
MARKED B7
MARKED B16
MARKED WITH 3 RADIAL LINES
WITHOUT MARKINGS
IN A CIRCULAR PATTERN
IN A CROSS-OVER PATTERN
TIGHTEN EACH BOLT TO FINGER TIGHTNESS THEN USE CHANNEL LOTS
TO PURGE AIR POCKETS
TO PROVIDE WATER FILL POINTS
TO PLACE A GAUGE IN THE AREA
TO PREVENT A VACUUM WHEN THE SYSTEM IS DRAINED
ANCHOR BOLTS
TOSSLE BOLTS
EYE BOLTS
THREADED BOLTS
TO SPREAD THE PRODUCT LOAD EVENLY AMONG THE TUBES
BECAUSE THE LINES BECOME HEAVIER WHEN THEY ARE IN SERVICE
BECAUSE SPRINGS CAN HAVE A TENDENCY TO RETURN TO THEIR ORIGINAL LENGTH
TO COMPENSATE FOR METAL FATIGUE THAT WILL STRETCH THE SPRINGS
PIPING THAT MOVES VERTICALLY AND DOES NOT NEED CONSTANT SUPPORT
PIPING THAT MOVES HORIZONTALLY AND DOES NEED CONSTANT SUPPORT
HIGH-PRESSURE AND LOW-TEMPERATURE PIPE
PIPING THAT MUST BE SUPPORTED AT ALL TIES DURING THERMAL EXPANSION AND CONTRACTION
EYEBOLT
TOGGLE BOLT
EXPANSION ANCHOR BOLT
SELF TAPPING BOLT
PROPOSED LENGTH OF TRAVEL HAS NO OBSTRUCTION
CODE STAMPING IS ATTACHED TO THE CANISTER
SPRING IS PROPERLY SEATED ANS SUPPORTED
PROPER COLOR CODE IS APPLIED
SCREWED
ROLLED
INSERTED
GLUED
THE INSIDE DIAMETER MUST MATCH UP
THE OUTSIDE DIAMETER MUST MATCH UP
BOTH INSIDE AND OUTSIDE DIAMETERS MUST MATCH UP
EITHER THE INSIDE OR OUTSIDE MUST MATCH UP
BREAD
RAG
DUCT TAPE
PURGE PAPER
THE SPRING CANISTER SHOULD BE INSPECTED
THE INSIDE OF THE FITTING SHOULD BE INSPECTED
THE AIR TUGGER SHOULD BE INSPECTED
THE RETAINING PIN SHOULD BE INSPECTED
BOTTOM MANWAY
TOP MANWAY
ABOVE THE REBOILER
BELOW THE REBOILER
6 POINT
8 POINT
9 POINT
12 POINT
2
4
6
8
TO MAINTAIN PRESSURE ON THE EXCHANGER
TO DRAIN CONDENSATION
SO THAT THE PUMP CAN BE DISCONNECTED
SO THAT AIR CAN BE REMOVED FROM THE EXCHANGER
Quiz Review Timeline +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.