Everyone on a scaffold
Anyone within 6 feet of the life line
Only 1 person
A maximum of 2 people
Fire box
Outside box
Hot box
Inside box
1/8 inch
1/4 Inch
3/8 inch
1/2 inch
A heating metal until to its to hot to touch temperature that in pairs the metal
Heating to a
Scorching the metal until it melts
Heating the metal
Measuring the water flow through tubes pressure in the furnace
Measuring the. Gas
Indicates the temperature to which is attached indicating the steam flow through the holes
1/8 to 1/4 inch
3/8 to 3/4 inches
7/8 to 1 inch
1 1/12 to 2 inch
Inlet outlet alarm
Reflucks and drain
Regen blind
Side glass and level
Tertiary
Rediant
Conviction
Fin fan
30degree
45 degree
60 D
90 d
Raise frame weld neck
Raise front weld neck
Raise face weld neck
Raced faced wide neck
Between the trays
O. Top of the trays
O. The bottom of the tower wall
On the inside of the tower wall
Above the radiant tubes
Below the radiant tubes
Beside the radiant tubes
Outside the heater
The gasket should be checked
Pressure should be relieved before any tightening strarted
All the water should be drAined
Tighten under pressure
Bundle
Nozzle
Shell side
Tube side
Bottom of the tower
Top of the tower
Side of a tower
At the sump
Quiz Review Timeline +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.