The Well Control Snubbing Quiz will give too the possibility to enter a question bank several times. After submitting the test you will get the correct answers and your score.

5 Sample Questions

With a workstring in the hole, a leak develops in the upper stripping BOP. Which of the following would be the first action to take to enable a repair of the leak?

  • A. Kill the well.
  • B. Close the blind/shear BOP.
  • C. Close the lower stripping BOP and a safety BOP.
  • D. Close the shear/seal BOP

With a workstring in the hole a leak develops in the string. What is the first action to take?

  • A. Rig up to the kill pump and pump kill fluid into the workstring.
  • B. Bullhead the kill fluid into the well through the Xmas tree.
  • C. Install the stabbing/safety valve onto the string and close it
  • D. Drop the secondary wireline check valve into the workstring.

What is the purpose of the bleed off line?

  • A. Used as contingency to direct and control well flow to the pits if the BOP system fails.
  • B. To control bullhead or circulation well-kill pump rates.
  • C. To bleed off well pressure trapped between stripping rams during tripping of the workstring.
  • D. To use pressure from another well to equalise across the lower stripping BOP before opening.

What is the fluid pump used for? SELECT TWO ANSWERS

  • A. A standby for well kill operations.
  • B. Equalising the well pressure across the lower stripping BOP.
  • C. Maintain closure pressure on stripping rams.
  • D. Workstring fill up.

What is the fluid pump used for? SELECT TWO ANSWERS

  • A. To conduct through workstring pumping operations.
  • B. Pressure testing the pressure control equipment.
  • C. Maintain closure pressure on stripping rams.
  • D. Pressuring up the stripper rubber.