1.
Who serves as the equipment review and authorization activity?
A. 
Equipment accountability office
B. 
C. 
D. 
2.
The selection of property custodian requires mutual agreement between
A. 
The Equipment Accountability Office (EAO) and organization commanders
B. 
The previous custodian and equipment managment element (EME)
C. 
Organization commanders and the previous custodian
D. 
The accountable officer and organization commander
3.
What element within an allowance standard esablishes the number of items that can be issued to an individual, activity, or organization?
A. 
B. 
C. 
D. 
4.
Which code replaces the cost desingnator in the ERRCD for an equipment item?
A. 
B. 
C. 
D. 
5.
Which ERCCD identifies NON-EAID equipment items?
A. 
B. 
C. 
D. 
6.
The equipment xustodian uses which AF Form to request NON-EAID items?
A. 
B. 
C. 
D. 
7.
Which AF Form is used to request a change to an allowance standard or to request an item that requires approval under miscellaneous allowance source code?
A. 
B. 
C. 
D. 
8.
Which turn-in method is used to process the TIN before picking up the property?
A. 
B. 
C. 
D. 
9.
What activity code is used to process NON-EAID equipment turn-ins?'
A. 
B. 
C. 
D. 
10.
What activity code is used to process EAID equipment turn-ins?
A. 
B. 
C. 
D. 
11.
When a piece of equipment is no longer required or authorized, the equipment management section processes what input to reduce or delete an authorization?
A. 
B. 
C. 
D. 
12.
Which listing is used to identify out-of-balance
A. 
B. 
C. 
D. 
13.
When signed by the property custodian which listing serves as a custody receipt?
A. 
Allowance source code listing
B. 
Consolidated transaction register
C. 
Consolidated inventory document registry
D. 
Custodian authorization/Custody receipt listing
14.
Which SPRAM asset is used to detect or isolate a fault or problem in online equipment?
A. 
B. 
C. 
D. 
15.
Which TRIC is used to load, change, or delete a SPRAM detail?
A. 
B. 
C. 
D. 
16.
Which report provides a listing of all items authorized, on-hand, and due-out, for organizations authorized SPRAM assets
A. 
B. 
C. 
D. 
17.
When your base weapon assets are increased or decreased, what report do you send to the Small Arms Registry at Robins Air Force Base?
A. 
B. 
C. 
D. 
18.
What Material Management computer listing do you use to reconcile communications security and weapons assets?
A. 
Conversion Aduit List (R22)
B. 
Daily Weapon/COMSEC Report (D21)
C. 
Weapon/COMSEC Reconciliation (R46)
D. 
Consolidated Inventory Adjustment Document Registry (M10)
19.
Who works hand-in-hand with the LRS to support mission requirements?
A. 
B. 
C. 
D. 
20.
What stock leveling term represents the maximum quantity that should be on-hand or on order to
A. 
Economic Order Quality (EOQ)
B. 
C. 
Requsition objective (RO)
D. 
Safety-level quantity (SLQ)
21.
When one-for-ne stock leveling term represents teh maximum quantity that should be on-hand or on order to sustain current operations?
A. 
B. 
C. 
D. 
22.
A request for an adjusted stock level is made on what AF Form?
A. 
B. 
C. 
D. 
23.
Which Material Management System is used to review and validate adjusted stock levels?
A. 
B. 
C. 
D. 
24.
The RBL system computes demand levels for what items?
A. 
B. 
C. 
D. 
25.
The Material Management System uses what document identifier code to respond to a RBL allocation?
A. 
B. 
C. 
D.