  • 1. 
       Who do you call before you Dig?
    • A. 

      Call the safety department

    • B. 

      BC 1 call

    • C. 

      Call your superintendent

    • D. 

      Call utility department

  • 2. 
      What would the pothole frequency be for potholing an electrical line?
    • A. 

      10 meters

    • B. 

      16 meters

    • C. 

      8 meters

    • D. 

      Don't need to pothole

  • 3. 
        When do you need a Ground Disturbance Permit?
    • A. 

      Only when using an excavator

    • B. 

      Only when digging by a gas line

    • C. 

      Anytime you disturb the ground

    • D. 

      Only when your working by a undrground Utility

  • 4. 
    Who needs to sign off on the Ground Disturbance Permit?
    • A. 

      The site superintendent

    • B. 

      The operator who is creating the Ground Disturbance

    • C. 

      The foremen

    • D. 

      The superintendent, engineer, foremen, and crew

  • 5. 
    What do you need before you dig?
    • A. 

      Ground Disturbance permit

    • B. 

      Utility drawings

    • C. 

      JHA addressing utilities

    • D. 

      BC 1 Call

    • E. 

      All of the above

  • 6. 
    When digging over top of a Kinder Morgan line you don't need a Kinder Morgan inspector on site.
    • A. 

      True

    • B. 

      False

  • 7. 
    When working close to a Terasen gas line I need to give Terasen notification before I start my operation. 
    • A. 

      True

    • B. 

      False

  • 8. 
    If you strike a gas line but only scratch the coating you can just cover it back up and you don't need to notify anybody.
    • A. 

      True

    • B. 

      False

  • 9. 
    Having a locate company mark out the utilities is the only step needed to begin digging.
    • A. 

      True

    • B. 

      False

  • 10. 
    Pre loading over top of a utility is considered to be a Ground Disturbance.
    • A. 

      True

    • B. 

      False