3dx7xv2
Deliberate planning.
Crisis action planning.
Mobilization planning
Force rotational planning.
Volume 1.
Volume 2.
Volume 3.
Volume 4.
Air Force Personnel Center (AFPC) Aerospace Expeditionary Forces (AEF) Center.
Installation Deployment Officer (IDO).
Unit Deployment Monitor (UDM).
Joint Staff.
Standard unit type code (UTC).
Joint force/capability.
In-lieu-of (ILO).
Ad hoc.
Training
Personnel.
Facility condition.
Equipment condition.
Training.
Personnel.
Home station mission.
Equipment condition.
10–201.
10–244.
10–401.
10–403.
AFI 10–201.
AFI 10–244.
AFI 10–401.
AFI 10–403.
Pilot Units.
Joint Planners.
Logistics Readiness Squadron.
Each unit is responsible for building its own LOGDET.
Force protection.
Airfield operations.
Force accountability.
Explosive Ordinance Disposal (EOD).
Force protection and logistics.
Intelligence and force protection.
Secure communications and intelligence.
Secure communications and force accountability.
Robust the airbase.
Operate the airbase.
Establish the airbase.
Generate the mission.
2 days, 7 days.
2 days, 14 days.
7 days, 14 days.
14 days, 30 days.
Generate the mission.
Establish the airbase.
Operate the airbase.
Robust the airbase.
Scott AFB, IL.
Travis AFB, CA.
Peterson AFB, CO.
Joint Base McGuire-Dix-Lakehurst, NJ.
O–4.
O–5.
O–6
O–7.
Command and control.
Operate the airbase.
Robust the airbase.
Open the airbase.
2 kilometers (km).
4 km.
8 km.
16 km.
Strategy.
Combat plans.
Combat support.
Combat operations.
MQ–9 Reaper.
RQ–11B Raven.
MQ–1B Predator.
RQ–4B Global Hawk.
3D0X3, Cyber Surety.
3D1X2, Cyber Transport Systems.
3D1X3, RF Transmission Systems.
3D1X7, Cable and Antenna Systems.
38 Engineering Squadron (ES).
38 Contracting Squadron (CONS).
38 Operations Support Squadron (OSS).
85 Engineering Installation Squadron (EIS).
1942
1954
1988
1998
MPTO 00–33A–1001.
MPTO 00–33A–1002.
MPTO 00–33A–2001.
MPTO 00–33A–2002.
A. funding, execute, close, and control.
Plan, execute, monitor, and control.
Plan, execute, close, and control.
Plan, control, close, and support.
Funding
Technical solution.
Requirements management plan.
Answers, guidance, and education.
Processes.
Priorities.
Requirements.
Technical solutions.
Cost management plan.
Allied support plan.
Technical plan.
Material plan.
The status.
A milestone.
A deliverable.
The final result.
Status request.
Defect repairs.
Preventive action.
Corrective action.
AFTO Form 745.
AFTO Form 747.
AFTO Form 749.
AF Form 1747.
Major.
Minor.
Major and minor.
Major and critical.
Follow-up.
Controlling.
Organization
Documenting.
AF Form 1146.
AF Form 1747.
AFTO Form 46.
AFTO Form 47.
Project monitor.
Project manager.
Communication squadron.
Implementing organization.
Project monitor.
Project manager
Program action officer
Program action monitor
Service design, service transition, service plan, and continual service improvement.
Service plan, service transition, service operation, and continual service improvement.
Service design, service transition, service operation, and continual service improvement
Service design, service disposition, service operation, and continual service improvement
Service improvement.
Service transition.
Service strategy.
Service design.
Service design.
Service strategy.
Service transition.
Service operation.
1
2
3
4
AFI 33–115.
AFI 33–150.
TO 00–33D–3001.
TO 00–33D–3004.
Work Orders
Trouble Tickets
Infrastructure requirements
Communications and Information Systems Installation Records (CSIR).
Organic.
Contract.
Inorganic.
Self-Help
TO 00–33A–1001.
TO 00–33D–3003.
Integrated Maintenance Data System (IMDS).
Cyberspace Infrastructure Planning System (CIPS).
Base Communications Systems Officer.
Affected Work Center.
C. Base Civil Engineer.
Project Managers.
Requires services from outside agencies.
Mobility (deployment) equipment.
Requires additional manpower.
Requires additional funding.
Concept Plan.
Functional Plan.
Supporting Plan.
Operational Plan.
Concept Plan.
Functional Plan
Supporting Plan
Operational Plan
Programming Plan (PPLAN).
Program Action Directive (PAD).
Operations Plan (OPLAN) major paragraph.
Time Phased Force and Deployment Data (TPFDD).
Special Measures.
Administration.
Assumptions.
Logistics.
Quiz Review Timeline +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.