1.
There are three ways to access the spec writing program once you have "Logged In" on the ATAS Website. They are:
Correct Answer
B. Under "Products" tab, under "SpecWriter" tab, and by clicking on one of the blue boxes on the left side of the screen that is titled "ATAS Spec Program"
Explanation
To access the spec writing program on the ATAS website, you need to go to the "Products" tab and then select the "SpecWriter" tab. From there, you can click on one of the blue boxes on the left side of the screen that is titled "ATAS Spec Program". This will allow you to access the spec writing program.
2.
Regarding the specification you created using the ATAS on-line SpecWriter program, what CSI Section number did it fall under?
Correct Answer
A. 07 41 13 - Metal Roof Panels
Explanation
The correct answer is 07 41 13 - Metal Roof Panels. This section number refers to the specification for metal roof panels, which is the category that the specification created using the ATAS on-line SpecWriter program falls under.
3.
Under Part 1 - General, which type of panel is listed:
Correct Answer
C. Factory Formed Metal Roof Panels
Explanation
The correct answer is Factory Formed Metal Roof Panels. This type of panel is listed under Part 1 - General.
4.
Under Part 1 - General, the spec states that "Finish must conform to the":
Correct Answer
C. Metal Construction Association Certified Premium Painted Standard
Explanation
The correct answer is Metal Construction Association Certified Premium Painted Standard. This is because under Part 1 - General, the specification states that the finish must conform to the Metal Construction Association Certified Premium Painted Standard.
5.
Under Part 1 - General, the spec states "Capable of producing sheet metal roofing assemblies that comply with UL 580 for Class ____ wind-uplift resistance."
Correct Answer
B. 90
Explanation
The spec states that the sheet metal roofing assemblies need to comply with UL 580 for Class wind-uplift resistance. The missing word in the statement is the wind-uplift resistance class. Based on the given options, the correct answer is 90.
6.
Under Part 1 - General, the spec states "Meets Energy Star requirements in ______________"
Correct Answer
A. Steep slope applications only
Explanation
The correct answer is "Steep slope applications only." This means that the product meets the Energy Star requirements only for steep slope applications, not for low slope applications or both steel and low slope applications.
7.
Under Part 1 - General, the spec states "Solar Reflectance for Roofs with Slopes Steeper than 2:12 - Initial solar reflectance of ____ when tested according to ASTM E903, and maintained under normal conditions. Solar reflectance of ____ when tested 3 years after installation."
Correct Answer
C. 55.0 and 55.0
Explanation
The spec states that for roofs with slopes steeper than 2:12, the initial solar reflectance should be 55.0 when tested according to ASTM E903, and maintained under normal conditions. Additionally, the solar reflectance should still be 55.0 when tested 3 years after installation.
8.
Under Part 1 - General, the spec states "Installer Qualifications: Installer of sheet metal roofing for a minimum of ____ years. Roll-Formed Sheet Metal Roofing Fabricator Qualifications: Minimum of ____ years factory forming experience."
Correct Answer
D. 10 and 10
Explanation
The spec states that the installer of sheet metal roofing should have a minimum of 10 years of experience, while the roll-formed sheet metal roofing fabricator should have a minimum of 10 years of factory forming experience.
9.
Under Part 1 - General, related to Platinum Plus Level Warranty, the spec states "Construction Inspection: Manufacturer shall conduct on site inspection and formal written report to architect and owner at the following intervals: ____ percent sheet metal roofing installation completion, and final inspection upon completion of roof system."
Correct Answer
B. 50%
Explanation
The correct answer is 50%. According to the specification, the manufacturer is required to conduct an on-site inspection and provide a formal written report to the architect and owner at two intervals: 50% completion of sheet metal roofing installation and final inspection upon completion of the roof system.
10.
Under Part 1 - General, the Fluoropolymer Finish Warranty Period stated on the specification is ____ years from date of Substantial Completion.
Correct Answer
B. 30
Explanation
The correct answer is 30. This means that the Fluoropolymer Finish Warranty Period stated on the specification is 30 years from the date of Substantial Completion.
11.
Under Part 1 - General, the Product Warranty Period stated under the Manufacturer's Platinum Plus Warranty is ____ years from date of Substantial Completion.
Correct Answer
A. 20
Explanation
The correct answer is 20. This means that under Part 1 - General, the Product Warranty Period stated under the Manufacturer's Platinum Plus Warranty is 20 years from the date of Substantial Completion.
12.
Under Part 2 - Products, Substitution requests must meet specifications and must be submitted a minimum of ____ days prior to date of bid.
Correct Answer
B. 10
Explanation
Substitution requests under Part 2 - Products must meet specifications and be submitted a minimum of 10 days prior to the date of bid. This means that any requests for substitutions must be made at least 10 days before the bidding date and must comply with the specified requirements.
13.
Under Part 2 - Products, ATA-Shield is described as:
Correct Answer
D. All of the above
Explanation
The correct answer is "All of the above". This means that ATA-Shield is a product that meets all the descriptions mentioned in the options. It is an 80 mil homogeneous rubberized asphalt waterproofing compound that is glass fiber reinforced. It is also specifically designed for use under sheet metal roofing.
14.
Under Part 2 - Products, ATA-Guard is described as:
Correct Answer
D. All of the above
Explanation
The correct answer is "All of the above". The explanation for this is that ATA-Guard is described as being resistant to 260 degrees Fahrenheit, being polyolefin based, and being 100 percent asphalt free. Therefore, all of the given statements are true and describe ATA-Guard accurately.
15.
Under Part 2 - Products, it is stated that all trim and flashing components shall be supplied in a minimum of ____ lengths.
Correct Answer
B. 12'-0"
Explanation
Under Part 2 - Products, it is stated that all trim and flashing components shall be supplied in a minimum of 12'-0" lengths. This means that the trim and flashing components should be provided in lengths that are at least 12 feet long.
16.
Under Part 2 - Products, it is stated that Manufacturer must maintain __________ and __________ of all equipment.
Correct Answer
C. Quality control and maintenance procedures
Explanation
In Part 2 - Products, the manufacturer is required to maintain quality control and maintenance procedures for all equipment. This means that they must have established processes in place to ensure that the equipment meets the required quality standards and that regular maintenance is performed to keep the equipment in good working condition. By maintaining quality control and maintenance procedures, the manufacturer can ensure that their equipment is reliable and meets the expectations of their customers.
17.
Under Part 2 - Products, it is stated "Fabricate sheet metal roofing and components to comply with details shown, manufacturers installation details and recommendations in __________ and __________ ".
Correct Answer
A. SMACNA's "Architectural Sheet Metal Manual" and NRCA Waterproofing Manual
Explanation
The correct answer is SMACNA's "Architectural Sheet Metal Manual" and NRCA Waterproofing Manual. This is because the statement in the question mentions the need to comply with details shown, manufacturers installation details, and recommendations. Both SMACNA's "Architectural Sheet Metal Manual" and NRCA Waterproofing Manual provide guidelines and recommendations for fabricating sheet metal roofing and components, making them the appropriate references for ensuring compliance.
18.
Under Part 2 - Products, it is states "Custom fabricate flashings and trim to comply with recommendations in __________".
Correct Answer
B. SMACNA's "Architectural Sheet Metal Manual"
Explanation
The correct answer is SMACNA's "Architectural Sheet Metal Manual". This manual provides recommendations and guidelines for custom fabricating flashings and trim in architectural sheet metal work. It is a widely recognized industry resource and is commonly used by professionals in the field.
19.
Under Part 3 - Execution, it is stated "Field cutting of sheet metal roofing by torch is __________."
Correct Answer
C. Not permitted
Explanation
The statement clearly states that field cutting of sheet metal roofing by torch is "not permitted." This means that using a torch to cut sheet metal roofing is not allowed.
20.
Under Part 3 - Execution, it is stated "Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action by:"
Correct Answer
D. Any one of the above listed methods
Explanation
The correct answer is "Any one of the above listed methods." This means that any of the mentioned methods can be used to protect against galvanic action when dissimilar metals will contact each other or corrosive substrates. The options given include painting contact surfaces with bituminous coating, applying rubberized-asphalt underlayment to each contact surface, and using other permanent separation methods as recommended by fabricators or manufacturers. All of these methods are acceptable and can be used to prevent galvanic action.
21.
Under Part 3 - Execution, as per the specification, when should temporary protective coverings and strippable films be removed from sheet metal roofing?
Correct Answer
B. While roofing is being installed
Explanation
Temporary protective coverings and strippable films should be removed from sheet metal roofing while roofing is being installed. This is because these coverings are meant to protect the roofing material during transportation and handling, and they may hinder the proper installation of the roofing. Therefore, it is important to remove them while the roofing is being installed to ensure that the installation process is not compromised.
22.
Under Part 3 - Execution, for Manufacturer's Field Service, you should engage a __________ service representative to inspect completed metal roof panel installation, including accessories.
Correct Answer
A. Factory-authorized
Explanation
In the context of the given question, it is recommended to engage a factory-authorized service representative to inspect the completed metal roof panel installation. This means that the representative is authorized by the manufacturer of the metal roof panels to perform the inspection. This ensures that the inspection is carried out by someone who has the necessary knowledge and expertise regarding the specific product being installed.
23.
Under Part 3 - Execution, at whose expense will additional inspections be performed to determine compliance of replaced or aditional work with specified requirements?
Correct Answer
C. Contractor's
Explanation
Additional inspections to determine compliance of replaced or additional work with specified requirements will be performed at the contractor's expense. This means that the contractor is responsible for ensuring that any work they have done or any work they have replaced meets the specified requirements. They will need to cover the costs of these inspections as part of their contractual obligations.
24.
Under Part 3 - Execution, it is stated that underlayment should be covered within ___ days.
Correct Answer
B. 14
Explanation
Under Part 3 - Execution, it is stated that underlayment should be covered within 14 days. This means that after the underlayment is installed, it should be covered with the final flooring material within 14 days. This is important to prevent any damage or deterioration to the underlayment and ensure proper installation of the flooring.
25.
Name at least three things listed in a Metal Roof Panel specification, created by using the ATAS on-line SpecWriter, that could separate ATAS from other manufacturers and increase the chances of our panel being used on a project.