Gusto mo dumugo ilong mo? eto sagutan mo! di ko matandaan lahat ng rinreview ko kaya tignan ko kung effective pag gumawa ng sariling exam.... gawa din kayu tapos try ko sagutan... try nyo wag dayain tong quiz na to dahil sarili nyo lang niloloko nyo! bawal backspace pwede Retake then post nyo score nyo sa comment! 60minutes exam


Questions and Answers
  • 1. 

    Not a part of the Architect Design Services or Regular Design Services

    • A.

      Scheme Design Phase

    • B.

      Design Development Phase

    • C.

      Contract Document Phase

    • D.

      Owner-Architect Agreement Phase

    • E.

      Construction Phase

    Correct Answer
    D. Owner-Architect Agreement Phase
  • 2. 

    Architect's Minimum Basic Fee for Simple Project?

    • A.

      10% of total project cost

    • B.

      8% of total project cost

    • C.

      6% of total project cost

    • D.

      7% of total project cost

    • E.

      12% of total project cost

    Correct Answer
    C. 6% of total project cost
  • 3. 

    Architect's Minimum Basic Fee for Moderate Project?

    • A.

      10% of total project cost

    • B.

      8% of total project cost

    • C.

      6% of total project cost

    • D.

      7% of total project cost

    • E.

      12% of total project cost

    Correct Answer
    D. 7% of total project cost
  • 4. 

    Architect's Minimum Basic Fee for Exceptional Project?

    • A.

      10% of total project cost

    • B.

      8% of total project cost

    • C.

      6% of total project cost

    • D.

      7% of total project cost

    • E.

      12% of total project cost

    Correct Answer
    B. 8% of total project cost
  • 5. 

    Architect's Minimum Basic Fee for Residential Project?

    • A.

      12% of total project cost

    • B.

      7% of total project cost

    • C.

      10% of total project cost

    • D.

      8% of total project cost

    • E.

      15% of total project cost

    Correct Answer
    C. 10% of total project cost
  • 6. 

    Architect's Minimum Basic Fee for Residential Project with extensive detailing?

    • A.

      15% of total project cost

    • B.

      8% of total project cost

    • C.

      10% of total project cost

    • D.

      7% of total project cost

    • E.

      12% of total project cost

    Correct Answer
    C. 10% of total project cost
    Explanation
    basta residential project 10% parin kahit tanung mo pa ke sir! minimum naman yan eh, kung gusto mo sumingil ng 15% ok lang basta minimum 10% parin! GAGO! :)

    Rate this question:

  • 7. 

    Architect's Minimum Basic Fee for Monumental Project?

    • A.

      15% of total project cost

    • B.

      8% of total project cost

    • C.

      10% of total project cost

    • D.

      7% of total project cost

    • E.

      12% of total project cost

    Correct Answer
    E. 12% of total project cost
  • 8. 

    Architect's Minimum Basic Fee for Extensive Detailing Project?

    • A.

      15% of total project cost

    • B.

      8% of total project cost

    • C.

      10% of total project cost

    • D.

      7% of total project cost

    • E.

      12% of total project cost

    Correct Answer
    A. 15% of total project cost
  • 9. 

    Architect's Minimum Basic Fee for Alteration & Renovation Project?

    • A.

      15% of total project cost

    • B.

      100% of total project cost

    • C.

      120% of total project cost

    • D.

      150% of total project cost

    • E.

      200% of total project cost

    Correct Answer
    D. 150% of total project cost
  • 10. 

    Architect's Minimum Basic Fee for Consultation&Arbitration Project?

    • A.

      200/Appearance and 500/Hour (consultation)

    • B.

      500/Apprentice and 200/Hour (consultation)

    • C.

      500/Appearance and 200/Hour (consultation)

    • D.

      250/Appearance and 500/Hour (consultation)

    • E.

      300/Appearance and 500/Hour (consultation)

    Correct Answer
    A. 200/Appearance and 500/Hour (consultation)
  • 11. 

    After submittal of design development, how many days(maximum) she/he can get the payment?

    • A.

      120 days

    • B.

      30 days

    • C.

      15 days

    • D.

      60 days

    • E.

      100,000,000 days

    Correct Answer
    C. 15 days
  • 12. 

    How far from established office of the architect, he/she paid by a per diem of not less than 500 pesos + transportation and living expenses?

    • A.

      1 Kilometer

    • B.

      150 Kilometers

    • C.

      200 Kilometers

    • D.

      100 Kilometers

    • E.

      6 Light years

    Correct Answer
    D. 100 Kilometers
  • 13. 

    The 15% retention fee off the architect is broken down into?Liability -         ____%Supervision-  ____%

    • A.

      5% and 10%

    • B.

      10% and 5%

    • C.

      12% and 3%

    • D.

      3% and 12%

    • E.

      50% and 50% of the 15% retention

    Correct Answer
    B. 10% and 5%
  • 14. 

    Any tax that the government may issue/impose on the architects as consequence of the services performed for the project(exclusive of income tax) shall be paid by who?

    • A.

      Architect

    • B.

      Owner

    • C.

      Contractor

    • D.

      Sub-Contractor

    Correct Answer
    B. Owner
  • 15. 

    What is the provisions bound on protection of "intellectual property"

    • A.

      PD 49/RA8293

    • B.

      PD 223

    • C.

      PD 1185

    • D.

      RA 9266

    • E.

      PD 1723

    Correct Answer
    A. PD 49/RA8293
  • 16. 

    What is the provision on the architect's liability for 15 years

    • A.

      PD 49/RA8293

    • B.

      PD 223

    • C.

      PD 1185

    • D.

      RA 9266

    • E.

      PD 1723

    Correct Answer
    E. PD 1723
  • 17. 

    What is the fee for physical planning for Site Development? (1st 50 hectares)in peso

    • A.

      2000/hectares

    • B.

      3000/hectares

    • C.

      5000/hectares

    • D.

      10000/hectares

    Correct Answer
    C. 5000/hectares
  • 18. 

    What is the fee for physical planning for Subdivision Planning for Urban Area? (1st 100 hectares) in peso

    • A.

      2000/hectares

    • B.

      3000/hectares

    • C.

      5000/hectares

    • D.

      10000/hectares

    Correct Answer
    C. 5000/hectares
  • 19. 

    What is the fee for physical planning for Subdivision Planning for Rural Area? (1st 100 hectares) in peso

    • A.

      2000/hectares

    • B.

      3000/hectares

    • C.

      5000/hectares

    • D.

      10000/hectares

    Correct Answer
    A. 2000/hectares
  • 20. 

    What is the fee for the Special Allied Services: Interior Design?

    • A.

      10-15%

    • B.

      12-20%

    • C.

      10-20%

    • D.

      8-20%

    Correct Answer
    B. 12-20%
  • 21. 

    What is the fee for the Special Allied Services: Landscape Architect?

    • A.

      10-15%

    • B.

      12-20%

    • C.

      10-20%

    • D.

      8-20%

    Correct Answer
    A. 10-15%
  • 22. 

    What is the fee for the Special Allied Services: Acoustic,Communication, Electronics Engr?

    • A.

      10-15%

    • B.

      12-20%

    • C.

      10-20%

    • D.

      8-20%

    Correct Answer
    A. 10-15%
  • 23. 

    In 3d wheel of a building project, what is the role of the Contractor?

    • A.

      Design

    • B.

      Decision

    • C.

      Delivery

    • D.

      Build

    Correct Answer
    C. Delivery
  • 24. 

    In 3d wheel of a building project, what is the role of the Architect?

    • A.

      Design

    • B.

      Decision

    • C.

      Delivery

    • D.

      Build

    Correct Answer
    A. Design
  • 25. 

    In 3d wheel of a building project, what is the role of the Owner?

    • A.

      Design

    • B.

      Decision

    • C.

      Delivery

    • D.

      Build

    Correct Answer
    B. Decision
  • 26. 

    What is the percentage fee method for the Architect as the Full-time Supervision/Supervisor?

    • A.

      1%-1.5%

    • B.

      2%-5%

    • C.

      1.5%-3%

    • D.

      2%-5%

    Correct Answer
    A. 1%-1.5%
  • 27. 

    What is the percentage fee method for the Architect as the Project Manager?

    • A.

      1%-1.5%

    • B.

      2%-5%

    • C.

      1.5%-3%

    • D.

      2%-5%

    Correct Answer
    B. 2%-5%
  • 28. 

    What is the percentage fee method for the Architect as the Construction Manager?

    • A.

      1%-1.5%

    • B.

      2%-5%

    • C.

      1.5%-3%

    • D.

      2%-5%

    Correct Answer
    C. 1.5%-3%
  • 29. 

    How the architect compensated in post construction service?

    • A.

      1.Fixed Annually Salary 2. 4%-6% gross monthly rental

    • B.

      1.Fixed Monthly Salary 2. 2%-6% gross monthly rental

    • C.

      1.Fixed Annually Salary 2. 2%-6% gross monthly rental

    • D.

      1.Fixed Monthly Salary 2. 4%-6% gross monthly rental

    Correct Answer
    D. 1.Fixed Monthly Salary 2. 4%-6% gross monthly rental
  • 30. 

    The Person/Entity ordering the project for execution including duly pointed successors/Authorized Representatives

    • A.

      Architect

    • B.

      Owner

    • C.

      Contractor

    • D.

      Sub-Contractor

    Correct Answer
    B. Owner
  • 31. 

    The Person/Firm whose proposal has been accepted and to whom the contract was awarded?

    • A.

      Architect

    • B.

      Owner

    • C.

      Contractor

    • D.

      Sub-Contractor

    Correct Answer
    C. Contractor
  • 32. 

    Is the person/firm or corporation who provides the guarantee for the contractor's bond

    • A.

      Security

    • B.

      Surety

    • C.

      Principal

    • D.

      Guarantor

    Correct Answer
    B. Surety
  • 33. 

    Additional information on contract documents issued to bidders before date of bidding

    • A.

      Bid Addendum

    • B.

      Bid Announcement

    • C.

      Bid Bulletin

    • D.

      Bid Publication

    Correct Answer
    C. Bid Bulletin
  • 34. 

    The cashier's check/surety bond accompanying the proposal submiited by the bidder will enter into a contract w/ the owner for the construction of the work, if the contract was awarded to him

    • A.

      Proposal Bond

    • B.

      Guarantee Bond

    • C.

      Performance Bond

    • D.

      Surety Bond

    Correct Answer
    A. Proposal Bond
  • 35. 

    The offer of a bidder to perform the work describe by the contract documents when made cut and submitted on the prescribe proposal form properly signed and guaranteed

    • A.

      Proposal

    • B.

      Performance

    • C.

      Agreement

    • D.

      Recommendation

    Correct Answer
    A. Proposal
  • 36. 

    Is the approved form of security furnished by the contractor & his surety as a guarantee of good faith on the part of the contractor to pay all the obligations arising from the contract.

    • A.

      Proposal bond

    • B.

      Performance bond

    • C.

      Payment bond

    • D.

      Guarantee bond

    Correct Answer
    C. Payment bond
  • 37. 

    Is the approved form of security furnish by the contractor and his  surety as a guarantee of good faith on the part of the contractor to execute the work in accordance with terms of the contract

    • A.

      Proposal bond

    • B.

      Performance bond

    • C.

      Payment bond

    • D.

      Guarantee bond

    Correct Answer
    B. Performance bond
  • 38. 

    Is the approved form of security furnished by the contractor and is surety as a guarantee to the quality of materials and equipment installed and the workmanship performed by the contractor.

    • A.

      Proposal bond

    • B.

      Performance bond

    • C.

      Payment bond

    • D.

      Guarantee bond

    Correct Answer
    D. Guarantee bond
  • 39. 

    Bond that Guarantee to enter into a contract if awarded?

    • A.

      Proposal bond

    • B.

      Performance bond

    • C.

      Payment bond

    • D.

      Guarantee bond

    Correct Answer
    A. Proposal bond
  • 40. 

    Is the contract between the owner and the contractor undertaking the project described in the contract documents including all supplemental agreements thereto and all general and special provision  pertaining to the work

    • A.

      Agreement

    • B.

      General Condition

    • C.

      Special Provisions

    • D.

      Specifications and supplementary specs

    • E.

      Drawings

    Correct Answer
    A. Agreement
  • 41. 

    The notice published by the owner or the invitation issued to perspective bidders

    • A.

      Bid Bulletin

    • B.

      Proposal

    • C.

      Invitation to bid

    • D.

      Instruction to bidders

    • E.

      Tender documents

    Correct Answer
    C. Invitation to bid
  • 42. 

    Are special representation of the work involved in the project

    • A.

      Agreement

    • B.

      General Condition

    • C.

      Special Provisions

    • D.

      Specifications

    • E.

      Drawings

    Correct Answer
    E. Drawings
  • 43. 

    The List of instructions stipulating the manner on how bid are to be prepared and conditions for the award of contract.

    • A.

      Invitation to bid

    • B.

      Proposal

    • C.

      Bid Bulletin

    • D.

      Instruction to bidders

    • E.

      Tender documents

    Correct Answer
    D. Instruction to bidders
  • 44. 

    As printed documents stipulating the procedural and the administrative aspects of the contract

    • A.

      Agreement

    • B.

      General conditions

    • C.

      Special provisions

    • D.

      Specification and supplementary specs

    • E.

      Drawings

    Correct Answer
    B. General conditions
  • 45. 

    Are instruction which maybe issued prior to the bidding to supplement and or modify drawing specification and or general condition of the contract

    • A.

      Agreement

    • B.

      General condition

    • C.

      Special provisions

    • D.

      Specification and supplementary specs

    • E.

      Drawings

    Correct Answer
    C. Special provisions
  • 46. 

    Shall be understood to mean "furnish"&"install"

    • A.

      Provide

    • B.

      Specify

    • C.

      Engage

    • D.

      Prepare

    Correct Answer
    A. Provide
  • 47. 

    Are written/printed description of work to be done describing qualities of material and mode of contruction

    • A.

      Agreement

    • B.

      General conditions

    • C.

      Special provisions

    • D.

      Specifications

    • E.

      Drawings

    Correct Answer
    D. Specifications
  • 48. 

    Is an outline specifications enumerating the type/trade names of materials to be used

    • A.

      Outline Specification

    • B.

      Schedule of Specification

    • C.

      Schedule of materials and finishes

    • D.

      Material and Specification Instructions

    Correct Answer
    C. Schedule of materials and finishes
  • 49. 

    Are additional information w/c may be issued as an addition/amendment to the provision of the specification.

    • A.

      Supplementary Specification

    • B.

      Specification

    • C.

      Agreement

    • D.

      General Condition

    • E.

      Special Provision

    Correct Answer
    A. Supplementary Specification
  • 50. 

    Applies to all laws ordinances and other governmental regulations applicable to the project and its under taking.

    Correct Answer
    local laws, local law

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 16, 2022
    Quiz Edited by
    ProProfs Editorial Team
  • Mar 16, 2009
    Quiz Created by
    Wurpwurps
Back to Top Back to top
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.