Business Quiz: Process And Quality

47 Questions | Total Attempts: 5892

SettingsSettingsSettings
Please wait...
Supply Quizzes & Trivia

Here we present to you this business quiz about process and quality. In this quiz all about the process and quality of software, we’ll be looking at a handful of topics including business requirements, the SDLC model, the Increment model, Cognizant, control limits, and more. What can you tell us?


Questions and Answers
  • 1. 
    If there are a lot of volatile business requirements and therefore the software is prone  to changes. Which model is appropriate if the changes vary enough for rehaul of certain systems:
    • A. 

      Incremental

    • B. 

      Waterfall

    • C. 

      Maintenance

    • D. 

      Iterative

  • 2. 
    In Incremental model, which of the following stages are incremented:
    • A. 

      All of the listed options

    • B. 

      Requirement

    • C. 

      Construction and Unit Testing

    • D. 

      Design, Construction and Unit testing

  • 3. 
    Which of the following security criteria is not relevant in Cognizant?
    • A. 

      C0

    • B. 

      C1

    • C. 

      C2

    • D. 

      C3

  • 4. 
        At the initial CMMI level, the process is:
    • A. 

      Chaotic

    • B. 

      Optimized

    • C. 

      Managed

    • D. 

      Repeatable

  • 5. 
     Which among the following option is NOT a SDLC Model?
    • A. 

      V Model

    • B. 

      U Model

    • C. 

      RAD

    • D. 

      Evolutionary Prototype

  • 6. 
     Which of the following is NOT a result of CMMi?
    • A. 

      Productivity Increase

    • B. 

      Process Improvement

    • C. 

      New Coding language

    • D. 

      Reduction of Defects

  • 7. 
    Which of the following flow shows the proper sequence of events in the quality journey of an organization?
    • A. 

      Framework -> Model -> Certification

    • B. 

      Certification -> Framework -> Model

    • C. 

      Model -> Framework -> Certification

    • D. 

      Model -> Certification ->framework

  • 8. 
      Where does one find control limits for a metric?
    • A. 

      Metric Plan

    • B. 

      Q Smart

    • C. 

      (c) Project Plan

    • D. 

      OLBM

  • 9. 
    The SDLC is followed for a development project must be one of waterfall, iterative, incremental. State True or False?
    • A. 

      True

    • B. 

      False

  • 10. 
       A large project with fixed requirements need to follow which model?
    • A. 

      Incremental

    • B. 

      Iterative

    • C. 

      Adaptive

    • D. 

      Waterfall

  • 11. 
        Metric goal maps to :
    • A. 

      Delivery quality

    • B. 

      Management direction

    • C. 

      Project Plan

    • D. 

      Business Goals

  • 12. 
    Which SDLC Model have separate and distinct phases of specification and development?
    • A. 

      Iterative

    • B. 

      Waterfall

    • C. 

      Incremental

    • D. 

      V model

  • 13. 
    Who is NOT a internal Stake holder of a project?
    • A. 

      SQAG

    • B. 

      End User

    • C. 

      Project Manager

    • D. 

      Team Member

  • 14. 
    A quantitative measure of a specific desirable attribute of a software is known as:
    • A. 

      Defect

    • B. 

      Plan

    • C. 

      Metric

    • D. 

      Base Line

  • 15. 
        Which among the following is the first SDLC Model and introduced by whom?
    • A. 

      Iterative – Winston Royce

    • B. 

      Waterfall – Barry Boehm

    • C. 

      Waterfall – Enthoven and Henry Rowan

    • D. 

      Waterfall- Winston Royce

  • 16. 
    Incremental and Iterative Model s  are also known as ______  ,  _________ respectively
    • A. 

      Spiral, Staged Delivery

    • B. 

      Sequential, Spiral

    • C. 

      Staged Delivery, Spiral

    • D. 

      Spiral, Sequential

  • 17. 
    Sequential flow of process in delivery management:
    • A. 

      Proposal, Formalization, Start up, Execution, Closure.

    • B. 

      Analysis, Formalization, start up, Execution, Closure.

    • C. 

      Start up, Analysis, Proposal, formalization, execution.

    • D. 

      None of the above.

  • 18. 
        Which among the following is NOT Application Value Management Projects?
    • A. 

      Maintainance

    • B. 

      Mass Change

    • C. 

      Testing

    • D. 

      Development

  • 19. 
    Metric is generated from the data stored in_______.
    • A. 

      Prolite

    • B. 

      E Tracker

    • C. 

      Peer Review

    • D. 

      Both A & B

  • 20. 
    Other name of black-box testing?
    • A. 

      Glass-box testing.

    • B. 

      Data-driven testing

    • C. 

      Logic–driven testing

    • D. 

      Regression testing

  • 21. 
    ______ is an open-source toolkit for measuring and reporting Java code coverage.
    • A. 

      EMMA

    • B. 

      JProbe

    • C. 

      InsECT

    • D. 

      Jcoverage

  • 22. 
    Which of the following is not the features of regression testing?
    • A. 

      Revisiting and testing all prior bug-fixes in response to new fixes or enhancements

    • B. 

      Retesting all programs that might be affected by the fixes or enhancements

    • C. 

      Discovering the hidden bugs that are not deducted during the previous tests

    • D. 

      Separating the errors logically by applying divide and conquer technique

  • 23. 
    SetUp() is used to --------------------------
    • A. 

      Initialize variables used in more than one test.

    • B. 

      Clean-up after test case.

    • C. 

      C) release permanent resources.

    • D. 

      Run many number of test cases simultaneously.

  • 24. 
    Which of the following is not the Performance testing tools __________
    • A. 

      Web Load

    • B. 

      Astra load test

    • C. 

      Requisite Pro

    • D. 

      Load Runner

  • 25. 
    TCP means____________
    • A. 

      Test Control Program

    • B. 

      Test Control Practice

    • C. 

      Test Case Point

    • D. 

      Test Case Program