Oo System Analysis Bitches

62 Questions | Total Attempts: 533

SettingsSettingsSettings
Please wait...
Oo System Analysis Bitches

Here you go


Questions and Answers
  • 1. 
    Which of the following is NOT an attribute of a project:
    • A. 

      Permanent

    • B. 

      Unique purpose

    • C. 

      Involves progressive elaboration

    • D. 

      Requires resources

    • E. 

      Involves uncertainty

  • 2. 
    A common place to keep the artifacts produced during a project is called:
    • A. 

      Project Repository

    • B. 

      Project Pool

    • C. 

      Project Archive

    • D. 

      Project Collection

  • 3. 
    The Project Manager adjusts for variances and records them in an updated plan
    • A. 

      True

    • B. 

      False

  • 4. 
    Creeping Commitment proposes that feasibility should be measured throughout the project life cycle.
    • A. 

      True

    • B. 

      False

  • 5. 
    Prototypes are a "throwaway" artifact of a project:
    • A. 

      True

    • B. 

      False

  • 6. 
    The TWO models contained in the requirements meta-model are:
    • A. 

      Use case model

    • B. 

      Test model

    • C. 

      Project Model

    • D. 

      Requirements model

    • E. 

      Software engineering model

  • 7. 
    The TWO types of actors in a use case specification (description) can be:
    • A. 

      External

    • B. 

      Primary

    • C. 

      Boundary

    • D. 

      Secondary

    • E. 

      Rolling

  • 8. 
    GTD involves a regular review, where you reflect on things more broadly.
    • A. 

      True

    • B. 

      False

  • 9. 
    The division of a Project into a tree-like structure of tasks is called:
    • A. 

      Task list

    • B. 

      Tree outline view

    • C. 

      Work breakdown structure

    • D. 

      GTD inbox

  • 10. 
    Requirements workflow occurs mostly during which TWO phases of UP?
    • A. 

      Elaboration

    • B. 

      Transition

    • C. 

      Requirements

    • D. 

      Construction

    • E. 

      Inception

  • 11. 
    Requirements tracing links which TWO models:
    • A. 

      Super model

    • B. 

      Non-functional model

    • C. 

      Use case model

    • D. 

      Functional model

    • E. 

      Meta model

    • F. 

      Requirements model

  • 12. 
    Project management is a series of steps undertaken to achieve a specific outcome
    • A. 

      True

    • B. 

      False

  • 13. 
    Which components are part of the use case model:
    • A. 

      Boundary, Entity, Control, Actor

    • B. 

      Subject, Actors, Use cases, Relationships

    • C. 

      Model view, Controller, Architecture

    • D. 

      Use cases, Actors, Functional, Non-functional

  • 14. 
    Requirements capture which TWO broad types of requirements
    • A. 

      Procedural

    • B. 

      Object-oriented

    • C. 

      Functional

    • D. 

      Non-functional

    • E. 

      Non-procedural

  • 15. 
    The main flow of a use case specification (description) presents the "perfect world" scenario.
    • A. 

      True

    • B. 

      False

  • 16. 
    The finance department is responsible for determining which feasibility?
    • A. 

      Legal

    • B. 

      Schedule

    • C. 

      Economic

    • D. 

      Operational

  • 17. 
    The preliminary project scope statement deals with working with stakeholders, especially users of the project's products, services, or results, to develop the high-level scope requirements.
    • A. 

      True

    • B. 

      False

  • 18. 
    Which of the following is not a diagram in UML
    • A. 

      Use case

    • B. 

      Petri net

    • C. 

      Object

    • D. 

      Class

    • E. 

      Activity

  • 19. 
    MoSCoW is a simple scheme for assigning values to which attributes of requirements?
    • A. 

      Priority

    • B. 

      Due dates

    • C. 

      Source

    • D. 

      Effort

    • E. 

      Location

  • 20. 
    Good use case specifications (descriptions) are characterized by which of the following:
    • A. 

      Text based

    • B. 

      Written at the user's goal level perspective

    • C. 

      Multi-page main flow steps

    • D. 

      Written as a tutorial on the problem domain

    • E. 

      Just UML use case diagrams

  • 21. 
    GTD involves processing the stuff that comes out of your head and into your life as a daily practice.
    • A. 

      True

    • B. 

      False

  • 22. 
    Which of the following is NOT a test for feasability:
    • A. 

      Political

    • B. 

      Economic

    • C. 

      International

    • D. 

      Legal

    • E. 

      Operational

  • 23. 
    UML is an acronym for Universal Modeling Language
    • A. 

      True

    • B. 

      False

  • 24. 
    Use cases are best for systems dominated by a large number of non-functional requirements.
    • A. 

      True

    • B. 

      False

  • 25. 
    Actors are always external to the system.
    • A. 

      True

    • B. 

      False

Back to Top Back to top