On Line Test With Multiple Choice

25 Questions | Attempts: 12
Share

SettingsSettingsSettings
On Line Test With Multiple Choice - Quiz

Test 2 - Multiple Choice


Questions and Answers
  • 1. 

    Which of the following is NOT Company strategic targets?

    • A.

      Faster

    • B.

      Better

    • C.

      Cheaper

    • D.

      Further

    Correct Answer
    B. Better
  • 2. 

    Executing the same test case by giving the number of inputs on same build called as

    • A.

      Regression Testing

    • B.

      Retesting

    • C.

      Adhoc Testing

    • D.

      Sanity Testing

    Correct Answer
    B. Retesting
  • 3. 

    To check whether we are developing the right product according to the customer requirements are not. It is a static process

    • A.

      Validation

    • B.

      Verification

    • C.

      Quality Assurance

    • D.

      Quality Control

    Correct Answer
    B. Verification
  • 4. 

    To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process

    • A.

      Validation

    • B.

      Verification

    • C.

      Quality Assurance

    • D.

      Quality Control

    Correct Answer
    A. Validation
  • 5. 

    A Non-Functional Software testing done to check if the user interface is easy to use and understand

    • A.

      Usability Testing

    • B.

      Security Testing

    • C.

      Unit Testing

    • D.

      Block Box Testing

    Correct Answer
    A. Usability Testing
  • 6. 

    The review and approved document (i.e. Test plan, System Requirement Specification’s) is called as

    • A.

      Delivery Document

    • B.

      Baseline Document

    • C.

      Checklist

    Correct Answer
    B. Baseline Document
  • 7. 

    What are the Testing Levels?

    • A.

      Unit Testing

    • B.

      Integration Testing

    • C.

      System Testing and Acceptance Testing

    • D.

      All the above

    Correct Answer
    D. All the above
  • 8. 

    Cost of quality =Prevention Cost + Appraisal cost + Failure cost

    • A.

      True

    • B.

      False

    Correct Answer
    A. True
  • 9. 

    It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & deals with process.

    • A.

      Validation

    • B.

      Verification

    • C.

      Quality Assurance

    • D.

      Quality Control

    Correct Answer
    C. Quality Assurance
  • 10. 

    Variance from product specifications is called?

    • A.

      Report

    • B.

      Requirement

    • C.

      Defect

    Correct Answer
    C. Defect
  • 11. 

    Verification is

    • A.

      Process based

    • B.

      Product based

    Correct Answer
    A. Process based
  • 12. 

    Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC )

    • A.

      True

    • B.

      False

    Correct Answer
    A. True
  • 13. 

    The testing which is done by going thro' the code is known as

    • A.

      Unit Testing

    • B.

      White-box Testing

    • C.

      Black-box Testing

    • D.

      Regression Testing

    Correct Answer
    B. White-box Testing
  • 14. 

    Software testing which is done without planning and Documentation is known as

    • A.

      Adhoc Testing

    • B.

      Unit Testing

    • C.

      Regression Testing

    • D.

      Functional Testing

    Correct Answer
    A. Adhoc Testing
  • 15. 

    Acceptance testing is known as

    • A.

      Beta Testing

    • B.

      Grey Box Testing

    • C.

      Test Automation

    • D.

      White box Testing

    Correct Answer
    A. Beta Testing
  • 16. 

    Retesting the entire application after a change has been made called as?

    • A.

      Full Regression Testing

    • B.

      Unit Regression Testing

    • C.

      Regional Regression

    • D.

      Retesting

    Correct Answer
    A. Full Regression Testing
  • 17. 

    Boundary value analysis belongs to which testing method?

    • A.

      Black Box testing

    • B.

      White Box testing

    Correct Answer
    A. Black Box testing
  • 18. 

    It measures the quality of a product It is a specific part of the QA procedure, It is a corrective process, It applies for particular product & Deals with the product.

    • A.

      Validation

    • B.

      Verification

    • C.

      Quality Assurance

    • D.

      Quality Control

    Correct Answer
    D. Quality Control
  • 19. 

    What are the Types of Integration Testing?

    • A.

      Big Bang Testing

    • B.

      Bottom Up Testing

    • C.

      Top Down Testing

    • D.

      All the above

    Correct Answer
    D. All the above
  • 20. 

    Which is Black-Box Testing method?

    • A.

      Equivalence Partitioning

    • B.

      Code Coverage

    • C.

      Fault Injection

    Correct Answer
    A. Equivalence Partitioning
  • 21. 

    Automation Testing should be done before starting Manual testing. Is the above statement correct?

    • A.

      True

    • B.

      False

    Correct Answer
    B. False
  • 22. 

    Earlier a defect is found the cheaper it is to fix it. Is the above statement correct?

    • A.

      True

    • B.

      False

    Correct Answer
    A. True
  • 23. 

    Informing to the developer which bug to be fix first is called as

    • A.

      Severity

    • B.

      Priority

    • C.

      Fix Ability

    • D.

      Traceability

    Correct Answer
    B. Priority
  • 24. 

    Defects generally fall into the following categories?

    • A.

      Wrong

    • B.

      Missing

    • C.

      Extra

    • D.

      All of the above

    Correct Answer
    D. All of the above
  • 25. 

    What is correct Software Process Cycle?

    • A.

      Plan(P)------>Check(C)------>Act(A)----->Do(D)

    • B.

      Plan(P)------>Do(D)------>Check(C)----->Act(A)

    • C.

      Plan(P)------>Do(D)------>Act(A)----->Check(C)

    Correct Answer
    B. Plan(P)------>Do(D)------>Check(C)----->Act(A)

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 14, 2022
    Quiz Edited by
    ProProfs Editorial Team
  • May 04, 2015
    Quiz Created by
    CY736

Related Topics

Back to Top Back to top
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.