Oee Kwiz - Pho

10 Questions | Total Attempts: 72

SettingsSettingsSettings
Oee Kwiz - Pho - Quiz

Take the KWIZ. . . Join the OEE KWiz. Answer the questions within 15 minutes. This game is created to promote awareness on Overall Equipment Effectiveness to all employees.


Questions and Answers
  • 1. 
    What does OEE stand for
    • A. 

      Overall Equipment Efficiency

    • B. 

      Overall Equipment Effectiveness

    • C. 

      Overal Equipment Estimation

    • D. 

      Output Efficiency Estimation

  • 2. 
    What are the components of OEE?
    • A. 

      Performance, Quality, Availability

    • B. 

      Quality, Availability, Unit per Hour

    • C. 

      Yield, Downtime, Unit per Hour

    • D. 

      Performance, Yield, Downtime

  • 3. 
    What is the purpose of OEE indicator?
    • A. 

      To find out the root cause of machine shutdown.

    • B. 

      To accelerate the speed of product shipment

    • C. 

      To reduce machine set up time

    • D. 

      To reduce 6 big losses

  • 4. 
     What are 6 big losses in this video?
    • A. 

      AR [Preventive Maintenance , Set-up and adjustment] PR [Change Over Time, Reduce speed] QR [Material Shortage, Production rejects]

    • B. 

      AR [Breakdowns, Set-up and adjustment] PR [Small stops, Reduce speed] QR [Start-up rejects, Production rejects]

    • C. 

      AR [Preventive Maintenance , Schedule Downtime] PR [Change Over Time, Reduce speed] QR [Material Shortage, Production rejects]

    • D. 

      AR [Preventive Maintenance , New Year Shutdown] PR [Change Over Time, Reduce speed] QR [Material Shortage, Production rejects]

  • 5. 
     How to calculate OEE?
    • A. 

      OEE = AR x PR x QR

    • B. 

      OEE = Yield x Downtime x UPH

    • C. 

      OEE = Downtime x PR x QR

    • D. 

      OEE = AR x PR x Yield

  • 6. 
    How to calculate AR?
    • A. 

      AR = Planned Production Time-Total Downtime (Hrs)  x 100%                               Planned Production Time

    • B. 

      AR = Planned Production Time-Total Scheduled Downtime (Hrs)  x 100%                               Planned Production Time

    • C. 

      AR = 24 Hours -Total Downtime (Hrs)  x 100%                Planned Production Time

    • D. 

      AR = Planned Production Time-Total Downtime (Hrs)  x 100%                                          24 Hours

  • 7. 
    How to calculate PR?
    • A. 

      PR = Output x 100%           Input

    • B. 

      PR =  Output     x 100%           Runtime

    • C. 

      PR = Ideal Cycle Time x 100%               Run Time

    • D. 

      PR = Ideal Cycle Time x Output x 100%               Run Time

  • 8. 
    How to calculate QR?
    • A. 

      QR =      Total Defects  x 100%              Total Build Plan

    • B. 

      QR =    Reworked Quantity x 100%                          Input

    • C. 

      QR =    Output x 100%               Input

    • D. 

      QR =      Retested Quantity   x 100%               Reworked Quantity

  • 9. 
    Is the scheduled downtime part of OEE ?
    • A. 

      Yes

    • B. 

      No

  • 10. 
    Can each part of OEE over 1.0 ?
    • A. 

      Yes

    • B. 

      No

Back to Top Back to top