Work Orders

8 Questions | Total Attempts: 40

SettingsSettingsSettings
Please wait...
Work Orders

Work Orders


Questions and Answers
  • 1. 
    If this were on the Installation Work Order what would you enter into CMS in the Systems Tab under Elapsed Install Time (hh:mm)?
  • 2. 
    The Actual Number of modules needs to be updated for each roof section.
    • A. 

      True

    • B. 

      False

  • 3. 
    To find the number of circuits check the third page of the CAD.
    • A. 

      True

    • B. 

      False

  • 4. 
    Calculate the System Size.
  • 5. 
    Who would you remove from this "Reply all" email:
  • 6. 
     With the time elapsed on  the Installation and Electrical Work Orders, use the greater of the two times for the time elapse section in CMS.
    • A. 

      True

    • B. 

      False

  • 7. 
    All of the following belong on the Techs the be paid spread sheet except:
    • A. 

      Uninstalls

    • B. 

      Reinstalls

    • C. 

      Add-ons with the original team

    • D. 

      Changes to accounts completed before July 1, 2013

    • E. 

      Add-ons with a different team than the original team

  • 8. 
    Which of the following need to be entered into CMS on the Installation Work order:
    • A. 

      Elapsed time

    • B. 

      Techs

    • C. 

      System ID#

    • D. 

      Inverter type and Quantity