  • 1. 
    In ______________ review, review results will not be reported in any format.
    • A. 

      Formal

    • B. 

      Informal

    • C. 

      Self

    • D. 

      Both A and B

  • 2. 
    In ______________ review, review results will not be reported in any format.
    • A. 

      Formal

    • B. 

      Informal

    • C. 

      Self

    • D. 

      Both A and B

  • 3. 
    In ______________ review, review results will not be reported in any format.
    • A. 

      Formal

    • B. 

      Informal

    • C. 

      Self

    • D. 

      Both A and B

  • 4. 
    In ______________ review, review results will not be reported in any format.
    • A. 

      Formal

    • B. 

      Informal

    • C. 

      Self

    • D. 

      Both A and B

  • 5. 
    Any reference to a________________should be made using square brackets and the ___________ label must be written in CAPS.
    • A. 

      Attributes

    • B. 

      Button

    • C. 

      Field

    • D. 

      Input Data

  • 6. 
    _______________ correlates any two base lined documents that require a many to many relationship to determine the completeness of the relationship.
    • A. 

      Test Case

    • B. 

      Test Design

    • C. 

      Traceability matrix

    • D. 

      None

  • 7. 
    ________must be written for the invalid and the unexpected, as well as for valid and expected conditions.
    • A. 

      Test Case

    • B. 

      Test requirement

    • C. 

      Use cases

    • D. 

      Test plan

  • 8. 
    ________ is conducted by SME in the absence of the author.
    • A. 

      Formal

    • B. 

      Peer Review

    • C. 

      Walkthrough

    • D. 

      None

  • 9. 
    Reference to any input data being provided must be given within________quotes.
    • A. 

      Double

    • B. 

      Single

    • C. 

      Brackets

    • D. 

      Title case

  • 10. 
    Reference to any object name such as a ______ must be written within double quotes and _________must be written in title case. 1.Window 2. Label 3.Object name 4.Button
    • A. 

      1&2

    • B. 

      1,2&3

    • C. 

      1,3&4

    • D. 

      1,2&3,4

  • 11. 
    ____________ section details the actions that are required beforehand that is, a necessary action that is to be completed before start of the Test case.
    • A. 

      Testcase Id

    • B. 

      ER

    • C. 

      Pre-Requisite

    • D. 

      AR

  • 12. 
    A ____________ lists causes and effects in a matrix. Each column represents a unique combination.
    • A. 

      Equivalence partitioning

    • B. 

      Boundary value analysis

    • C. 

      Decision table

    • D. 

      ACE

  • 13. 
    __________is a technique that consists of developing test cases and data that focuses on the input and output boundaries of a given data.
    • A. 

      Equivalence partitioning

    • B. 

      Boundary value analysis

    • C. 

      Decision table

    • D. 

      None

  • 14. 
    __________________ is a software testing technique that divides the input data of a software unit into partitions of data from which test cases can be derived.
    • A. 

      EQP

    • B. 

      BVA

    • C. 

      Decision table

    • D. 

      None

  • 15. 
    _________________ helps to create re-usable Test Scenarios. Therefore,it can be used in projects which aim to build re-usable Test Scenarios.
    • A. 

      Use Cases

    • B. 

      Data Flow Diagram

    • C. 

      ACE

    • D. 

      BVA

  • 16. 
    A__________________defines a goal-oriented set of interactions between external actors and the system under consideration.
    • A. 

      Use cases

    • B. 

      Data flow diagram

    • C. 

      BVA

    • D. 

      ACE

  • 17. 
    ______________ is the testing conducted on a complete system (all the modules integrated with each other) to evaluate the system's compliance with its specified requirements.
    • A. 

      System

    • B. 

      System Integration

    • C. 

      Component Integration

    • D. 

      UAT

  • 18. 
    ____________________-represent a powerful tool for test design and are a single event or a sequence of events that happen during the actual usage of the application.
    • A. 

      Test case

    • B. 

      Test scenario

    • C. 

      Test log

    • D. 

      Defect Log

  • 19. 
    In use case Modeling, Minimum number of scenarios will be equal to___________
    • A. 

      Number of alternative flows plus the main flow

    • B. 

      Number of alternative flows less than the main flow

    • C. 

      Both A & B.

    • D. 

      None

  • 20. 
    Impact analysis is required during the following instances ___________
    • A. 

      Testing after bug fixing.

    • B. 

      Change to the requirements.

    • C. 

      Change request is introduced to the product.

    • D. 

      All the above.

  • 21. 
    Testing of a previously verified program or application following program modification for extension or correction to ensure no new defects have been introduced.
    • A. 

      Retesting

    • B. 

      Regression Testing

    • C. 

      Ad-Hoc testing

    • D. 

      None

  • 22. 
    Functionalities that are being tested in a
    • A. 

      Version

    • B. 

      Build

    • C. 

      All the above

    • D. 

      None

  • 23. 
    Name should be of minimum three characters and maximum 30 characters then the following will be:
    • A. 

      Numeric Checks

    • B. 

      Length Checks

    • C. 

      Negative Checks

    • D. 

      Default Display

  • 24. 
    A decision table is typically divided into ___________ quadrants.
    • A. 

      Two

    • B. 

      Three

    • C. 

      Four

    • D. 

      Five

  • 25. 
    __________________ is all the data that a system outputs as a result of processing input data and events.
    • A. 

      Input Data

    • B. 

      Output Data

    • C. 

      Master Data

    • D. 

      Setup Data

Back to Top Back to top