Reviews And Inspection By Pavan Lalwani

26 Questions | Total Attempts: 227

SettingsSettingsSettings
Please wait...
Reviews And Inspection By Pavan Lalwani

In the world of information technology, the review and inspection phase of a project involves the process carried out by a team to read through the code, inspect it for errors and defects, test the code to see if it works the way in which it is intended, moderate and record the process while taking note of the results of this process and reporting back. Can you answer these questions on review and inspection as taught by Pavan Lalwani?


Questions and Answers
  • 1. 
    Which of the following BEST describes the difference between an inspection and a walkthrough?
    • A. 

      Both inspections and walkthroughs are led by the author.

    • B. 

      An inspection is led by a moderator and a walkthrough is led by the author.

    • C. 

      Both inspections and walkthroughs are led by a trained moderator.

    • D. 

      A walkthrough is led by the author. The author is not present during inspections.

  • 2. 
    What is the MAIN objective when reviewing a software deliverable?
    • A. 

      To identify potential application failures by use of a test specification.

    • B. 

      To identify defects in any software work product.

    • C. 

      To identify spelling mistakes in a requirements specification.

    • D. 

      To identify standards inconsistencies in the code.

  • 3. 
    For which of the following would a static analysis tool be MOST useful?
    • A. 

      Supporting reviews.

    • B. 

      Validating models of the software.

    • C. 

      Testing code executed in a special test harness.

    • D. 

      Enforcement of coding standards.

  • 4. 
    Which one do you like?
    • A. 

      Option 1

    • B. 

      Option 2

    • C. 

      Option 3

    • D. 

      Option 4

  • 5. 
    What is the main purpose of Informal review
    • A. 

      Inexpensive way to get some benefit

    • B. 

      Find defects

    • C. 

      Learning, gaining understanding, effect finding

    • D. 

      Discuss, make decisions, solve technical problems

  • 6. 
    What can static analysis NOT find? A. The use of a variable before it has been defined B. Unreachable ("dead") code C. Memory leaks D. Array bound violations
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 7. 
    Which one do you like?
    • A. 

      Option 1

    • B. 

      Option 2

    • C. 

      Option 3

    • D. 

      Option 4

  • 8. 
    Q. 98: The Phases of formal review process is mentioned below arrange them in the correct order. i. Planning ii. Review Meeting iii. Rework iv. Individual Preparations v. Kick Off vi. Follow Up
    • A. 

      A. i,ii,iii,iv,v,vi

    • B. 

      B. vi,i,ii,iii,iv,v

    • C. 

      C. i,v,iv,ii,iii,vi

    • D. 

      D. i,ii,iii,v,iv,vi

  • 9. 
    Q. 105: Who are the persons involved in a Formal Review :- i. Manager ii. Moderator iii. Scribe / Recorder iv. Assistant Manager A. i,ii,iii,iv are true B. i,ii,iii are true and iv is false. C. ii,iii,iv are true and i is false. D. i,iv are true and ii, iii are false.
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 10. 
    Q. 106: Which of the following statements regarding static testing is false: A. Static testing requires the running of tests through the code B. Static testing includes desk checking C. Static testing includes techniques such as reviews and inspections D. Static testing can give measurements such as cyclomatic complexity
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 11. 
    A Person who documents all the issues, problems and open points that were identified during a formal review. A. Moderator. B. Scribe C. Author D. Manager
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 12. 
    The Planning phase of a formal review includes the following :- A. Explaining the objectives B. Selecting the personnel, allocating roles. C. Follow up D. Individual Meeting preparations
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 13. 
    Static analysis tools are typically used by A. Testers B. Developers C. Testers & Developers D. None
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 14. 
    The person who leads the review of the document(s), planning the review,running the meeting and follow-up after the meeting A. Reviewer B. Author C. Moderator D. Auditor
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 15. 
    A formal assessment of a work product conducted by one or more qualified independent reviewer to detect defects. A. Inspection. B. Walkthrough. C. Review D. Non Conformance
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 16. 
    In a review meeting a moderator is a person who A. Takes minutes of the meeting B. Mediates between people C. Takes telephone calls D. Writes the documents to be reviewed
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 17. 
    Inspections can find all the following except A. Variables not defined in the code B. Spelling and grammar faults in the documents C. Requirements that have been omitted from the design documents D. How much of the code has been covered
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 18. 
    Peer Reviews are also called as : A. Inspection B. Walkthrough C. Technical Review D. Formal Review Q.
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 19. 
    15.ROI stands for: a)Return Of Investment b)Return On Investment c)Return On Inspection d)Return Of Inspection
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 20. 
    11.In a facilitation review, the product owner? a)Initiates the review process b)Distributes material to be reviewed c)Manages the entire review process and ensures that review process is adhered to d)Participates as an inspector
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 21. 
    7.Which of the following is not a role in peer reviews? a)Facilitator b)Author c)Reviewer d)SQA
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 22. 
    6.Which of the following does not help to decide the type of review required? a)Type of work product b)Size of work product c)Business criticality d)Complexity of work product
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 23. 
    1.Reviews and inspections are done over: a)Only executable software work products b)Only non-executable software work products c)Both executable and non-executable software work products Neither executable nor non-executable software work products
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 24. 
    1.Why are reviews done?   a)Detect and correct defects b)Ensure consistency with customer requirements c)Ensure adherence to standards d)All of the above
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

  • 25. 
    4.Which of the following is not a type of review? a)Peer review b)Test inspection c)Process review d)Fagan’s inspection
    • A. 

      A

    • B. 

      B

    • C. 

      C

    • D. 

      D

Back to Top Back to top