Our Painting Process has an Inspection Instruction associated with it called "All Painted / Undercoated Parts". What is the number that is assigned to this Inspection Instruction?
A. 
180ii-02
B. 
135ii-01
C. 
180ii-01
D. 
135ii-02
2.
The ESAB Plasma contains an Inspection Instruction called 15ii-01 "All Plasma Cut Parts". What Rev Level is this document currently at?
A. 
1
B. 
2
C. 
3
D. 
4
3.
C-20007-1 is a Frame Bracket Assembly and is hand welded in our Frame Bracket area. The AutoCAD print for this part was drawn by?
A. 
J. Sukosd
B. 
L.E.T.
C. 
B. Machado
D. 
J. Ramsey
4.
The hand weld Small Part area is required to use certain WPS's (Welding Procedure Specifications) when welding products. What is the first WPS listed on Small Parts WPS List?
A. 
WPS-1.xls
B. 
WPS-5.xls
C. 
WPS-8.xls
D. 
WPS-14.doc
5.
The Control Plan used for our robotically welded HT250US, was approved by who?
A. 
Dan Piehl
B. 
Josh Renken
C. 
Teresa Roberts
D. 
Steve Limberg
6.
If you ever have issues finding a document or have questions about a document, you should ask for help?