Most kids dream of becoming an airplane pilot and being in charge of moving people over the skies. Are you planning on flying an airplane and have undergone the courses? The quiz below offers revision on the courses leading to the final exam. Give it a try and all the best!
50%
42%
35%
95%
The APU has shutdown
The fire bottle is prepared to release all its contents
The fire bottle has released all its contents
The APU Control Unit requires a BITE
The APU doors (intake and exhaust) are fully open
The APU control unit has completed its self-test
There is a problem with the control unit and the BITE test is necessary
The APU fuel valve has just opened
4020 lbs.
500 lbs.
650 lbs.
1000 lbs.
Overhead Panel, P5
Aft Control Panel, P8
Control Panel, P62
Any above position
EGT and RPM
N1 and N2
N2 and EPR
EPR and RPM
30 seconds
120 seconds
90 seconds
60 seconds
Approximately 50 feet
Approximately 30 feet
Approximately 40 feet
Approximately 20 feet
Three attempts followed by a 30 minute cool-down
Three attempts followed by a 60 minute cool-down
Three attempts followed by a 90 minute cool-down
Three attempts followed by a 45 minute cool-down
99%
97%
95%
100%
90 seconds
60 seconds
30 seconds
120 seconds
1
3
None
2
Four
Six
Eight
Two
The APU may be stopped (Normal), but never started, during servicing
The APU may be started, but never stopped(excluding APU emergencies) during fuel servicing
The APU will never be started or stopped (excluding APU emergencies) during fuel servicing
The APU may be started or stopped during fuel servicing
Overhead P-11 Panel
Sidewall P-61 Panel
Overhead P-5 Panel
Sidewall P-62 Panel
107% RPM
109% RPM
106% RPM
108% RPM
STATUS
OPERATION
MAINTENANCE
Any of the above
Center
Left Main
Reserve
Right Main
550 lbs.
600 lbs.
500 lbs.
650 lbs.
After 120 seconds
After 30 seconds
After 60 seconds
Immediately
7% RPM
8% RPM
9% RPM
6% RPM
The E-4 rack
The E-5 rack
The E-6 rack
The E-3 rack
The APU fuel valve has just opened
There is a problem with the control unit and a BITE is necessary
The APU doors (intake and exhaust) are fully open
The APU control unit has completed its self-test
471º C to 571º C
343º C to 538º C
471º C to 588º C
581º C to 588º C
APU LRU
APU START
APU LOP
APU BITE
Quiz Review Timeline +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.