This quiz is for the 7 level 2R1 career field in the Air Force.
Transitory Services
Weight and balance
Vehicle management
DCC
Base Commander
Maintenance flight Commander
MXG/ CC
MXS/ CC
Wing
Operations group
Operations Squadron
Transportation squadron
Flight Chief
Section chief
Flightline expediter
Pro-Super
Pro-Super
Squadron commander
Section chief
Flight chief
Tool storage
Bench stock
Repaprable parts
CANN
Maintenance manpower monitor
Maintenance Management rotation monitor
Maintenance Operations Squadron Commander
Maintenance Operations Flight PS&D Superintendent.
Quality assurance
Maintenance operations officer.
Maintenance Management Scheduling
The work center discovering the discrepancy.
Maintenance operations officer.
Maintenance Management Analysis.
Aircraft Maitenance Unit Superintendent.
Maintenance Operations Flight Plans Scheduling and Documentation.
ACDB
CAMS
IEMS
CEMS
Operational events
Status and inventory reporting
Automatic test equipment reporting
C-E status and inventory reporting.
Engine Management
Maintenance operations center
Maintenance management analysis
Plans, scheduling and documentation
Mission debrief, mission scheduling and analysis recording.
Mission recording, mission accomplishment and analysis phase.
Mission accomplishment, mission scheduling and analysis phase.
Mission documentation, analytical recording, and mission debrief.
Scheduling forecast system.
Automated scheduling module.
Scheduling development module.
Integrated development scheduling system.
Show the status and location of each aircraft on station.
Illustrate training aids for personnel training.
Show the status of qualified ariman.
Track aircraft flight patterns.
A room with glass windoms facing the flightline.
An open room where personnel traffic is high.
A typical office with desks and bookcases.
Completely enclosed and controlled room.
TO
Emergency checklist
AFI
Quick reaction pamphlet
Debrief personnel.
MOC
Maintenance operations officer.
Maintenance Management Scheduling.
Scheduling Forecast System.
Automated Scheduling Module
Scheduling Development Module
EMOC
Resident
Exportable
Nonresident
FTD
Video teletraining.
Videotape training.
Computer-based training.
Computer-based instruction.
AFS manager
AFCFM
E & T manager
MFM
You must first seek the concurrence of the WG/ CC.
Your unit E & T manager is the approval authority.
Submit a draft copy to your MFM for approval.
Your authority is normally from the CFETP, Part II, Section A.
Students assessments of core tasks in the CFETP/STS
How well the graduate performs tasks contained in the CFETP/ STS based on training received.
Students assessment of military standards.
Students assessments of training received.
1 to 3
4 to 6
6 to 8
8 to 10
Air Force CSAF QOL survey
GAS
CAS
FI
Training group.
Training squadron.
MAJCOM
AETC
Part 1
Part 2
Attachment 1
Attachment 2
Course objective list.
Training course index.
Abbrerviation and terms.
STS
AETC
AFMC
USAFE
PACAF
1
2
3
4
1
2
3
4
Be part of a subtask.
Be marked appropriately.
Have a definite beginning and end.
Authorized by the MFM.
A work center.
The Air Force.
A duty position.
An AFS
AFJQS
CJQS
STS
CTS
TE
FI report
STS
GAS
Review contractor training.
Review and update training.
Develop computer-based training.
Develop a maintenance training flight.
TE
OSR
STS
CJQS
Linear analysis
Parametric analysis
Correlation analysis
Variable trend analysis
Direct and indirect
Linear and curvilinear
Variable and nonvariable.
Paramedic and nonparamedic.
Using probability analysis
Calculating the standard error of the estimate.
Determining the proportion of predicted values to actual values.
Establishing a range within which a given proportion of the values will fall.
Time series.
Secular trend variation.
Cyclical trend variation.
Seasonal trend variation.
Time series.
Secular trend variation.
Cyclical trend variation.
Seasonal trend variation.
Past
Future
Past and future exceeding one year.
Past and future not to exceed one year.
Is valid for a three-month period.
Must be mathematically determined.
Cannot be used with nonlinear trends.
Is valid even if forces that acted on past data change.
Ratio.
Interval.
Discrete.
Continuous.
Ratio
Interval
Discrete
Continuous
Classical and frequency.
Addition and subtraction.
Classical and nonclassical.
Addition and multiplication.
FMC
PMC
TNMCS
TNMCM
Supply.
Debriefing.
Plans and scheduling.
The AVS report.
Quiz Review Timeline +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.