General Project Management Trivia Quiz

20 Questions | Total Attempts: 154

SettingsSettingsSettings
General Project Management Trivia Quiz - Quiz

Welcome to the general management quiz on product management that is designed to test out just how much you know about this field and procedures that are involved in achieving the goal you are given. The main stage is on having a good plan. Give it a shot and be sure to share your score in the comment section. All the best!


Questions and Answers
  • 1. 
    A condition or capability needed by a user to solve a problem or achieve an objective is part of ________________.
    • A. 

      Collecting Requirements

    • B. 

      WBS

    • C. 

      Mind Mapping

  • 2. 
    A condition or capability that must be met possessed by a system or system component to satisfy a contract, standard, specification, or other formally imposed document 
    • A. 

      Project Charter

    • B. 

      WBS Dictionary

    • C. 

      Collecting Requirements

  • 3. 
    A condition or capability that must be met or possessed by a system, product, service, result, or component to satisfy a contract, standard, specification, or other formal document. 
    • A. 

      Work Package

    • B. 

      Requirement

    • C. 

      Define Requirements

  • 4. 
    Describes how the project requirements will be analyzed, documented, and managed 
    • A. 

      Requirements Traceability Matrix (RTM)

    • B. 

      WBS

    • C. 

      Requirements Management Plan

  • 5. 
    A table that lists requirements, various attributes of each requirement, and the status of the requirements to ensure that all requirements are addressed 
    • A. 

      Requirements Traceability Matrix (RTM)

    • B. 

      Work Package

    • C. 

      Mind Mapping

  • 6. 
    Project title is part of the ______________
    • A. 

      Work package

    • B. 

      Requirements Traceability Matrix (RTM)

    • C. 

      Project Charter

  • 7. 
    Project start date is part of the _______________
    • A. 

      Project charter

    • B. 

      WBS

    • C. 

      Gnatt Chart

  • 8. 
    Project finish date is part of the _______________
    • A. 

      Work Breakdown Structure (WBS)

    • B. 

      Concept

    • C. 

      Project charter

  • 9. 
    Key scheduled milestones is part of the __________________
    • A. 

      WBS

    • B. 

      Project Charter

    • C. 

      Milestone report

  • 10. 
    Budget information is part of the _________________
    • A. 

      Project charter

    • B. 

      Budget report

    • C. 

      Project contract

  • 11. 
    Project manager is part of the __________________
    • A. 

      Management report

    • B. 

      WBS

    • C. 

      Project charter

  • 12. 
    Project objectives is part of the _________________
    • A. 

      Work package

    • B. 

      Project charter

    • C. 

      Concept report

  • 13. 
    Main project success criteria is part of _________________
    • A. 

      WBS

    • B. 

      Project criteria

    • C. 

      Gnatt chart

  • 14. 
    Approach is part of the ________________
    • A. 

      Project charter

    • B. 

      Gnatt Chart

    • C. 

      Work package

  • 15. 
    Roles and responsibilities is part of the ___________________
    • A. 

      Concept

    • B. 

      Analogy approach

    • C. 

      Project charter

  • 16. 
    Comments is part of the __________________
    • A. 

      Mind mapping

    • B. 

      Project charter

    • C. 

      WBS

  • 17. 
    The top box in the work breakdown structure (WBS) where the title of the project is placed. 
    • A. 

      Level 2

    • B. 

      Level 1

    • C. 

      Level 3

  • 18. 
    The main groupings for the work associated with a project which are listed under the top box in the work breakdown structure (WBS). 
    • A. 

      Level 2

    • B. 

      Level 1

    • C. 

      Level 3

  • 19. 
    What the items in level 2 are called
    • A. 

      Work Package

    • B. 

      Gnatt Structure

    • C. 

      Concept

  • 20. 
    What the items in level 3 are called in the WBS
    • A. 

      Define User Requirements

    • B. 

      Concept

    • C. 

      Define Requirements