1.
What among the following should the Architect's fee NOT be based?
A. 
Project Construction Cost
B. 
Client's Profile Directory
C. 
D. 
2.
The Architect has chosen a bidder but the Owner doesn't approve. What can be done?
A. 
B. 
Ask the Bidder to adjust the Bid
C. 
The owner is not entitled not to accept the bidder as it has been already chosen already
D. 
3.
Where does Assessing the Needs of the Client fall?
A. 
B. 
C. 
D. 
Assessment and research services
4.
After completion of contract drawings, specifications and other documents upon submission to a client, what stage is this?
A. 
B. 
C. 
D. 
5.
Architect of Record means?
A. 
Registered and licensed architect
B. 
Architect-incharge of the construction
C. 
Legally registered from PRC
D. 
Signed the architectural drawings
6.
Who determines time and cost of the project?
A. 
B. 
C. 
D. 
7.
A client wanted your service for his new house with a Total Project Cost of Three Million (3,000,000.00) pesos. What is the percentage of your professional fee for the Design Service?
A. 
B. 
C. 
D. 
8.
Who should secure the Building Permits?
A. 
B. 
C. 
D. 
9.
- The method of compensation applicable only to non-creative work such as accounting, supervision and data gathering.
A. 
Multiple of Direct Personal Expenses
B. 
C. 
Percentage of Construction Cost
D. 
Professional Fee + expenses
10.
What stage in the Regular Design services should the Architect completes all drawings, specifications and other documents for construction?
A. 
B. 
C. 
D. 
11.
Any formal grouping of two or more architectural firms working in joint venture on project basis.
A. 
B. 
C. 
D. 
12.
An architectural pre-design services wherein the goal is to achieve unimpaired program with minimum cost.
A. 
B. 
C. 
D. 
13.
Charges for specific building types are usually based on _____________.
A. 
B. 
C. 
D. 
14.
The Project Development Cost includes _________________.
A. 
B. 
C. 
D. 
15.
The owner enumerates his/ her own requirements for the project. In return, the architect informs and explains needed technical requirements and the concomitant professional fees.
A. 
B. 
C. 
D. 
16.
The owner is given an estimate of the project, and upon completion, if there is realized savings for the estimated project construction cost; it is divided equally between the owner and the architect.
A. 
Design-Build by Administration
B. 
Design Build with Guaranteed Maximum Project Construction Cost
C. 
Design Build by Fixed Construction Cost
D. 
17.
At what stage are detailed specifications and estimates done?
A. 
B. 
C. 
D. 
18.
- The architect registered and licensed under this Act, who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans, specifications and contract documents he/she has signed and sealed.
A. 
B. 
C. 
Architect-in-charge of construction
D. 
19.
Involves the detailed planning and design of light transmission, timing and control for compatibility with the architectural design concept.
A. 
Architectural Interior Design
B. 
Architectural Lighting Layout and Design
C. 
Architectural Reflected Ceiling Plan
D. 
20.
Who signs Contract Documents?
A. 
Architect in charge of construction
B. 
C. 
D. 
21.
How much should be the Architectural composition of the Corporation?
A. 
B. 
C. 
D. 
22.
Accredits the National organization of Architects.
A. 
B. 
C. 
D. 
23.
Owner A wants to build a Diplomatic Function Hall for at least 800 persons. He hires Architect B for the project. Architect B later informs that we need to hire a Professional since he has limited knowledge in function hall designs. Who should they hire?
A. 
B. 
C. 
D. 
24.
Any architect who are guilty of misdemeanor shall be sentenced of imprisonment for a maximum of ________.
A. 
B. 
C. 
D. 
25.
Three siblings decided to form their own architectural firm. One is an Architect, another is an Engineer and the last is an Interior Designer. Where should they register their business/office?
A. 
B. 
C. 
D.