Air Log Quality Management,RAM,Rsaf Modification General,Latitude Scvg Policy

10 Questions | Total Attempts: 18

SettingsSettingsSettings
Please wait...
Latitude Quizzes & Trivia

Complete all


Questions and Answers
  • 1. 
    The purpose pf self check for a workcentre?
    • A. 

      Be more familiar with the procedure int he workcentre

    • B. 

      Know the limitations that the workcentre have

    • C. 

      Identify weakness and strength in order to bring about improvmnets to the workcentre

    • D. 

      All of above

  • 2. 
    Wha is the max allowable verification period for checking of corrective actions?
    • A. 

      7 days

    • B. 

      14days

    • C. 

      21days

    • D. 

      30 days

  • 3. 
    Which logictics RAM model should the workcentre adopt for their work?
    • A. 

      Follow strictly to the RAM model as prescribed in ALFO

    • B. 

      No standardised RAM model format required

    • C. 

      RAM model as prescribed in the workcentre FLO that is adapted from the logistic RAM model in AFLO

    • D. 

      Floow strictly to the RAM model as prescribed in the accident prevention manual(APM)

  • 4. 
    How long shall RAM records be retained aft the execution of hazardous task?
    • A. 

      To be destroyed immediately aft completion of task

    • B. 

      For at least 1 month

    • C. 

      For at least 7 hours

    • D. 

      For at least 7 days

  • 5. 
    The RAM focuses on which 4 elements?
    • A. 

      Management,Man,Mission,Machine

    • B. 

      Management,Medium,Mission,Machine

    • C. 

      Management,Man,Medium,Machine

    • D. 

      Medium,Man,mission,Machine

  • 6. 
    What is the procedure for classified modification submission?
    • A. 

      There is no special procedure for classified modification submission and the normal channel applies

    • B. 

      There is only one classifiction for modification, ie Normal

    • C. 

      All classified modifications is to be submitted directly to the appropriate committee Chairman for approval aft evaluation by project team

    • D. 

      All classified modification is to be submitted to HAL for approval aft evaluation by project team

  • 7. 
    When can out-of-committee approval sought from Chairman of the relevant modification committee?
    • A. 

      When mandatory, immediate complaince of a modification is called for

    • B. 

      When classifeid modification is called for

    • C. 

      There is no provision for out of committee approval

    • D. 

      For all modifications with safety implications

  • 8. 
    Which of the following is true: i) If the svcg is done one working day in advance for Weekly & below scvg, no formal approval is required. ii) If scvg is done two working days in advance for Monthly Scvg, no formal approval is required. iii) Where DIs(Daily Inspections) are authorised and deferred, no entry in ADD Log is required
    • A. 

      All the above

    • B. 

      I and ii

    • C. 

      I and iii

    • D. 

      Ii and iii

  • 9. 
    In the event that MOD/STI/SI could not carried out or completed by the compliance date due to calid reasons,_________can request for extension of compliance date using the form in Annex A(when ES(R) processing is not avalable) the completed form is to be submitted to OC MCF._____________is the approving authority for such requests.
    • A. 

      Log Flt OC/Dy OC,CO ALS

    • B. 

      CO ALS, WSD-DSTA

    • C. 

      CO ALS, HLB

    • D. 

      Log Flt OC/Dy OC, DD(O&S)

  • 10. 
    Int he event to bring forward the scvg o phase out a life component earlier than its life limit, ______________ can authorised a max o 5% of original due period. Beyond 5%,__________ authorisation needs to be obtained.
    • A. 

      CO ALS, WSD-DSTA's

    • B. 

      Log flt OC/Dy OC, CO ALS's

    • C. 

      CO ALS, HLB's

    • D. 

      Log Flt OC/Dy OC, WSD-DSTA's

Related Topics
Back to Top Back to top