Professional Practice for Architecture Mock Board
Technically
Legally
Professionally
Current
Listed
Recognized
Owned
Non-Listed
Three (3) year
Four (4) year
Five (5) year
Six (6) year
Directly
Referral by another Architect
Design Competition
All Listed
RA 8266
RA 8256
RA 9246
RA 9266
Bidding
Advertisement
Design Competition
Proposal
Bidding
Advertisement
Referral by an Architect
Proposal
An Invitation
A NEwspaper Advertisement
Bidding
No Projects done
Non-payment of dues
Non-renewal
Fraudulent acts
Artists
Civil engineer
Students
Registered Architects
Pre-design Services
Regular Design Services
Construction Services
Post Construction Services
Pre- Design Services
Regular Design Services
Construction Services
Post Construction Services
Pre-Design SErvices
Regular Design Services
Post-Construction Services
Non-Listed
Rate this question:
Pre-Design Services
Regular Design Services
Construction Services
Post- Construction Services
1975 UAP Documents
1979 PIA Documents
1979 UAP Documents
IAPOA Documents
Programming
Matrix Analysis
Architectural Research
Pre-Feasibility Studies
Site Planning
Site Selection
Site Comparison
Site Analysis
Feasibility Studies
Design Analysis
Project Viability Studies
Viability Analysis
Architectural Studies
Architectural data collection
Technical Research
Architectural Research
Feasibility Studies
Space Programming
Architectural Research
Architectural Programming
Site Studies
Site Planning
Site Utilization
Non-Listed
DEPED
TESDA
UAP
CHED
UAP
CHED
PRC
SEC
PRC
IAPOA
LGU
All listed
Fixed Salary
Wages
% of Construction Cost
Non-listed
% of Construction Cost
Multiple Direct Personnel Expenses
Salary
Fixed Fee
12% - 15%
10% - 15%
12% - 20%
12% - 25%
% of Construction Cost
Multiple of Direct Personnel Expenses
Salary
Fixed Fee
% of Construction Cost
Multiple of Direct Personnel Expense
Per Hectare
Salary
12% - 15%
10% - 15%
12% - 20%
12% - 25%
Owner
Architect
Consultant
Contractor
10 yrs
1 yr
3 yrs
15 yrs
PD 1185
PD 233
PB 223
PD 223
% of construction cost
% of gross monthly rentals
Lump sum
% of income
UAP
IAPOA
God
Non-listed
Account
Remuneration
Wages
Check
Retention Fee
Guarantee Bond
Liability
Contract
100%
98%
88%
95%
Penalty
Liquidated Damages
Interest Payment
Surcharges
Specifications
Memo. of Agreement
General Conditions
The Contract
PRC
Building Official
DPWH
Non-listed
PD 1185
PD 1086
PD 1026
PD 1096
2.0 sqm
3.10 sqm
3.20sqm
6.0 sqm
1.0 mts
0.80 mts
0.65 mts
0.60 mts
Activity Ledger
Construction Record
Logbook of Construction
Non listed
Renovation
Conversion
Repair
Alteration
Architect
Owner
Project manager
Contractor
2.55 mts
2.70 mts
2.40 mts
2.10 mts
PRC
Building Official
DPWH
Non-listed
2.0 mts
2.10 mts
3.20 mts
6.10 mts