CDC 2AX7X : Trivia Test On Aerospace Maintenance Craftsman! Quiz

13 Questions | Total Attempts: 65

SettingsSettingsSettings
CDC 2AX7X : Trivia Test On Aerospace Maintenance Craftsman! Quiz - Quiz

CDC 2AX7X: Trivia Test On Aerospace Maintenance Craftsman. If you think you have had enough practice in this specific course, all you need to do is press the start button and answer the questions to the best of your ability. After you are done with this one, do keep an eye out for other trivia quizzes like it.


Questions and Answers
  • 1. 
    What does the UPMR provide a listing of?
    • A. 

      Group authorizations including gains and losses by workcenter or FAC with the name and rank of the actual person filling each position

    • B. 

      Wing authorizations including gains and losses by workcenter or FAC with the name and rank of the actual person filling each position

    • C. 

      Unit authorizations including gains and losses by workcenter or FAC with the name and rank of the actual person filling each position

  • 2. 
    What is a manning assist used for?
    • A. 

      To alleviate a short-term manning problem caused by a temporary but unusually high workload

    • B. 

      To alleviate a long- termmanning problem caused by a temporary but unusually high workload

    • C. 

      To increase manning

  • 3. 
    Who is the approval authority to schedule maintenance personnel to work a shift longer than 12 hours?
    • A. 

      Squadron/CC

    • B. 

      WING/CC

    • C. 

      MXG/CC

  • 4. 
    Why is shift rotation a key component of personnel utilization?
    • A. 

      Screw up sleep schedule

    • B. 

      Develop personal experience and knowledge by exposing them to shift specific duties

    • C. 

      Its not important

  • 5. 
    What can a maintenance analysis referral be used for?
    • A. 

      Show maintenance failures

    • B. 

      To identify, investigate, and propose corrective action for management problems and to document corrective actions for implementation on a wider scale

    • C. 

      Show which program flies the most for more funding

  • 6. 
    With the exception of MSL personnel, supply support personnel are normally listed on what UMD?
    • A. 

      MOF

    • B. 

      LRS

    • C. 

      Maintenance Group

  • 7. 
    In addition to coordinating maintenance and supply actions and managing supply transactions, what are work center supply personnel tasked with doing?
    • A. 

      Managing the production assets in the repair cycle and resolving supply support problems

    • B. 

      Ordering Parts

    • C. 

      Tracking parts status

  • 8. 
    Why do MSL personnel periodically visit and inspect all maintenance workcenters?
    • A. 

      Find issues with workcenters

    • B. 

      To identify and recommend corrective actions on procedural or compliance problems associated with supply support

    • C. 

      Issue directives IAW with AF instructions

  • 9. 
    What is the purpose of a readiness spares package?
    • A. 

      Prevent a backorder status

    • B. 

      If run out of parts can easily pull from it without wasting repair time

    • C. 

      To provide a prepackaged set of supplies and spare parts required to support planned wartime or contigency operations for a specified period of time pending resupply

  • 10. 
    In a general sense, what are the two primary types of readiness spare packages?
    • A. 

      Mobility readiness spare packages and in-place readiness spare packages

    • B. 

      Precious cargo and XB3

    • C. 

      Local station package and deployable packages

  • 11. 
    What is the definition of primary operating stock (POS) as it pertains to readiness spares packages?
    • A. 

      Normal day to day assets routinely available in the supply sys to support avionics

    • B. 

      Normal day to day assets routinely available in the supply sys to support weapons systems

    • C. 

      Normal day to day assets routinely available in the supply sys to support airframe components

  • 12. 
    Temporary high priority mission support kits (THPMSK) are primarily used to provide support what type of operations?
    • A. 

      To support contingency operations for a period less than 30 days

    • B. 

      To support contingency operations for a period less than 90 days

    • C. 

      To support contingency operations for a period less than 120 days

  • 13. 
    What is the primary reason for conducting an annual review of all permanent readiness spares packages?
    • A. 

      Ensure that units are supported with the right size Readiness Spares Package to accomplish its wartime tasking

    • B. 

      Ensure that units are supported with the right size Readiness Spares Package to accomplish its normal day to day work schedule

    • C. 

      Ensure that units are supported with the right size Readiness Spares Package to accomplish any TDY mission

Back to Top Back to top