1N051 Unit 3(Aircraft Quiz)

127 Questions | Attempts: 162
Share

SettingsSettingsSettings
1N051 Unit 3(Aircraft Quiz) - Quiz

Unit 3 Review


Questions and Answers
  • 1. 

    What is the C2 weapon system that is the focal point of all air operations during conflict?

    • A.

      DGS

    • B.

      AOC

    • C.

      JTF

    • D.

      ATO

    Correct Answer
    B. AOC
  • 2. 

    Which of the following are included in the results of the Air Tasking Cycle?

    • A.

      ROE

    • B.

      JIPTL

    • C.

      ACO

    • D.

      TOT

    Correct Answer
    C. ACO
  • 3. 

    The ATO, ACO, and SPINS provide targets, time over target (TOT) for supporting aircraft, and ___

    • A.

      Flight instructions

    • B.

      Mission plans

    • C.

      JIPTL

    • D.

      Situational awareness

    Correct Answer
    A. Flight instructions
  • 4. 

    __ is a complex task affecting not only the success of the overall mission, but pilots' lives

    • A.

      ATO

    • B.

      SAID

    • C.

      Mission development

    • D.

      Mission planning

    Correct Answer
    D. Mission planning
  • 5. 

    Mission planning is different for every airframe and mission tasked to the aircraft

    • A.

      True

    • B.

      False

    Correct Answer
    A. True
  • 6. 

    Today, mission planning is done through the use of __, saving hours in preparation time

    • A.

      Automated computers

    • B.

      Prioritization

    • C.

      Hard copy mission folders

    • D.

      Target development

    Correct Answer
    A. Automated computers
  • 7. 

    Knowing and understanding the fundamentals of mission planning is a must to develop an air campaign at the AOC, MPC, or squadron level

    • A.

      True

    • B.

      False

    Correct Answer
    A. True
  • 8. 

    A well planned route provides a high probability of mission success and __

    • A.

      Attainability

    • B.

      Efficiency

    • C.

      Productivity

    • D.

      Survivability

    Correct Answer
    D. Survivability
  • 9. 

    The three major route planning priorities are __

    • A.

      Delivery of the weapons on the target, survival of the aircrew, recovery of the aircraft

    • B.

      Survival of the aircrew, target employment, survival of the aircraft

    • C.

      Delivery of weapons on the target, survival of the aircrew, survival of the aircraft

    • D.

      Delivery of the weapons on the target, survival of the pilot, recovery of the aircraft

    Correct Answer
    A. Delivery of the weapons on the target, survival of the aircrew, recovery of the aircraft
  • 10. 

    Which of the following is NOT a major route planning priority?

    • A.

      Delivery of the weapons on target

    • B.

      Survival of the aircrew

    • C.

      Recovery of classified materials

    • D.

      Recovery of the aircraft

    Correct Answer
    C. Recovery of classified materials
  • 11. 

    In addition to the route planning priorities, successful route planners must NOT consider which of the following?

    • A.

      Use entry and or re-entry corridors

    • B.

      Provide mutual defense support

    • C.

      Avoid enemy defenses

    • D.

      Use unacceptable reference points for navigational positioning

    Correct Answer
    D. Use unacceptable reference points for navigational positioning
  • 12. 

    Who is ultimately responsible for the success or failure of all mission planning?

    • A.

      Mission planners

    • B.

      Unit commander

    • C.

      COMAFFOR

    • D.

      Team lead

    Correct Answer
    B. Unit commander
  • 13. 

    The mission planning cell (MPC) is tasked to plan the mission. the MPC can included the aircrew, or an aircrew member, mission support personnel from operations, intelligence, tactics, weather, __, and others.

    • A.

      Knowledge operators

    • B.

      Communications

    • C.

      Targeteers

    • D.

      Computer programmers

    Correct Answer
    B. Communications
  • 14. 

    What includes all the activities required to plan mission from the receipt of the ATO to the post-mission debriefing?

    • A.

      Mission planning cycle

    • B.

      Mission planning assessment

    • C.

      Mission planning development

    • D.

      Mission planning phase

    Correct Answer
    A. Mission planning cycle
  • 15. 

    Which of the following is NOT an activity of the mission planning cycle?

    • A.

      Recieve the ATO

    • B.

      MPC pre-mission planning brief

    • C.

      Mission planning implementation

    • D.

      Execution phase

    Correct Answer
    C. Mission planning implementation
  • 16. 

    During contingency operations, the ATO is published __

    • A.

      Daily

    • B.

      Every 12 hours

    • C.

      Bi-weekly

    • D.

      Weekly

    Correct Answer
    A. Daily
  • 17. 

    For preplanned missions, the ATO is usually published for the first __ days of the air campaign

    • A.

      2

    • B.

      3

    • C.

      4

    • D.

      5

    Correct Answer
    B. 3
  • 18. 

    Which activity during the mission planning cycle involves extensive penetration analysis and evasion and escape planning by intelligence personnel?

    • A.

      MPC pre-mission planning brief

    • B.

      Mission planning phase

    • C.

      Mission planning validation

    • D.

      Execution phase

    Correct Answer
    B. Mission planning phase
  • 19. 

    Which activity during the mission planning cycle involves validating mission planning for preplanned missions in support of an OPLAN?

    • A.

      MPC pre-mission planning brief

    • B.

      Mission planning phase

    • C.

      Mission planning validation

    • D.

      Execution phase

    Correct Answer
    C. Mission planning validation
  • 20. 

    The mission is conducted in which activity of the mission planning cycle

    • A.

      MPC pre-mission planning brief

    • B.

      Mission planning phase

    • C.

      Mission planning validation

    • D.

      Execution phase

    Correct Answer
    D. Execution phase
  • 21. 

    During contingency operations, the next day's __ is published while the current missions are flown

    • A.

      ATO

    • B.

      ROE

    • C.

      SPINS

    • D.

      OPLAN

    Correct Answer
    A. ATO
  • 22. 

    The 3 key factors in the mission planning process are:

    • A.

      Mission tasking, target location, and mission route characteristics

    • B.

      Mission tasking, target identification, and mission route characteristics

    • C.

      Mission tasking, target location, and mission route profile

    • D.

      Mission tasking, target identification, and route identification

    Correct Answer
    B. Mission tasking, target identification, and mission route characteristics
  • 23. 

    The ATO outlines specific tasking for the air campaign on a __ basis

    • A.

      Daily

    • B.

      Monthly

    • C.

      Weekly

    • D.

      Yearly

    Correct Answer
    A. Daily
  • 24. 

    Once an ATO is received by the __, the MPC element begins to break out the ATO and start the mission planning process

    • A.

      Wing command section

    • B.

      Unit level planners

    • C.

      Wing operations center

    • D.

      Operations group section

    Correct Answer
    C. Wing operations center
  • 25. 

    Target identification usually comes from higher headquarters, either through ATOs or as preplanned in the OPLAN

    • A.

      True

    • B.

      False

    Correct Answer
    A. True
  • 26. 

    Which of the following is NOT an appropriate scale chart used in supporting the mission planning process?

    • A.

      Tactical navigation chart

    • B.

      Jet navigation chart

    • C.

      Operational navigation chart

    • D.

      Tactical pilotage chart

    Correct Answer
    A. Tactical navigation chart
  • 27. 

    What are the primary charts used to depict the entire combat mission route on one chart page?

    • A.

      Tactical navigation chart

    • B.

      Jet navigation chart

    • C.

      Operational navigation chart

    • D.

      Tactical pilotage chart

    Correct Answer
    B. Jet navigation chart
  • 28. 

    High altitude portions of the mission route are normally prepared on a/an __

    • A.

      Tactical navigation chart

    • B.

      Jet navigation chart

    • C.

      Operational navigation chart

    • D.

      Tactical pilotage chart

    Correct Answer
    C. Operational navigation chart
  • 29. 

    Low altitude routes are normally portrayed on a __

    • A.

      Tactical navigation chart

    • B.

      Jet navigation chart

    • C.

      Operational navigation chart

    • D.

      Tactical pilotage chart

    Correct Answer
    D. Tactical pilotage chart
  • 30. 

    Target area routes are normally depicted on a __

    • A.

      Tactical navigation chart

    • B.

      Jet navigation chart

    • C.

      Joint operations graphic

    • D.

      Tactical pilotage chart

    Correct Answer
    C. Joint operations graphic
  • 31. 

    Which publication defines the air tasking cycle?

    • A.

      ACO

    • B.

      AFI 22-303

    • C.

      Joint Publication 1-01

    • D.

      Joint Publication 3-30

    Correct Answer
    D. Joint Publication 3-30
  • 32. 

    How many phases are in the air tasking cycle?

    • A.

      3

    • B.

      4

    • C.

      5

    • D.

      6

    Correct Answer
    D. 6
  • 33. 

    What is the end product of the target development phase, which supports the objectives and conforms to guidance?

    • A.

      MAAP

    • B.

      JIPTL

    • C.

      ACO

    • D.

      ATO

    Correct Answer
    B. JIPTL
  • 34. 

    What is the employment plan that forms the foundation for the ATO?

    • A.

      MAAP

    • B.

      JIPTL

    • C.

      ACO

    • D.

      ATO

    Correct Answer
    A. MAAP
  • 35. 

    Combat assessment is conducted at what level(s) of the air force?

    • A.

      Operational

    • B.

      Strategic

    • C.

      Tactical

    • D.

      All

    Correct Answer
    D. All
  • 36. 

    What is the primary document of product result of the air tasking cycle?

    • A.

      MAAP

    • B.

      JIPTL

    • C.

      ACO

    • D.

      ATO

    Correct Answer
    D. ATO
  • 37. 

    What time frame does the ATO encompass for air combat execution?

    • A.

      12 hours

    • B.

      24 hours

    • C.

      48 hours

    • D.

      72 hours

    Correct Answer
    B. 24 hours
  • 38. 

    They key to reading and understanding your unit's ATO tasking is in __

    • A.

      The very first line

    • B.

      The introduction

    • C.

      The very last line

    • D.

      The combat assessment

    Correct Answer
    A. The very first line
  • 39. 

    How is the end of each set identified?

    • A.

      Fields

    • B.

      Single slash

    • C.

      Double slash

    • D.

      Set identifier

    Correct Answer
    C. Double slash
  • 40. 

    __ provides electronic access to USMTF air tasking order/conformation, ATO, and ACO

    • A.

      MIDB

    • B.

      Taskview

    • C.

      Info work space (IWS)

    • D.

      Analyst notebook (ANB)

    Correct Answer
    B. Taskview
  • 41. 

    Taskview provides graphical views of message components and offers the option to automatically construct planning software missions using __ text.

    • A.

      ATO

    • B.

      SPINS

    • C.

      OPLAN

    • D.

      OPORD

    Correct Answer
    A. ATO
  • 42. 

    The ACO institutes daily airspace control procedures, and is written out much like the ATO in what type of format?

    • A.

      Plain text format

    • B.

      USAF text format

    • C.

      Simple text format

    • D.

      Message text format

    Correct Answer
    D. Message text format
  • 43. 

    What contains modifications to guidance and procedures, activates/deactivates procedural control measures, and update positive control measures?

    • A.

      ATO

    • B.

      ACO

    • C.

      SPINS

    • D.

      OPLAN

    Correct Answer
    B. ACO
  • 44. 

    What 2 documents use message text format (MTF)?

    • A.

      ACO and ATO

    • B.

      ATO and OPLAN

    • C.

      OPORD and ACO

    • D.

      OPORD and OPLAN

    Correct Answer
    A. ACO and ATO
  • 45. 

    Temporary routes used to get aircraft to specific areas for mission accomplishment are called what?

    • A.

      ATR

    • B.

      WEZ

    • C.

      MEZ

    • D.

      MRR

    Correct Answer
    D. MRR
  • 46. 

    Base defense zones are zones that are established for the defense of what kind of airfields?

    • A.

      Joint

    • B.

      Enemy

    • C.

      Friendly

    • D.

      Coalition

    Correct Answer
    C. Friendly
  • 47. 

    What does the size of BDZs depend on?

    • A.

      The airspace

    • B.

      The deconfliction zone

    • C.

      The entry and re-entry corridors

    • D.

      Air defense system protecting the base

    Correct Answer
    D. Air defense system protecting the base
  • 48. 

    Any aircraft will be fired upon if they enter which zone?

    • A.

      WFZ

    • B.

      WEZ

    • C.

      MEZ

    • D.

      ROZ

    Correct Answer
    A. WFZ
  • 49. 

    What is it called if an AOR is protected by SAMs?

    • A.

      FFZ

    • B.

      MEZ

    • C.

      ROZ

    • D.

      WEZ

    Correct Answer
    B. MEZ
  • 50. 

    Who dictates the SPINS?

    • A.

      CPD

    • B.

      CSAF

    • C.

      Commander

    • D.

      C2 planning cell

    Correct Answer
    C. Commander

Quiz Review Timeline +

Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.

  • Current Version
  • Mar 20, 2022
    Quiz Edited by
    ProProfs Editorial Team
  • Jun 04, 2012
    Quiz Created by
    Syoung5190
Back to Top Back to top
Advertisement
×

Wait!
Here's an interesting quiz for you.

We have other quizzes matching your interest.