Evaluate the status of the project against the defined exit criteria. - ProProfs
     

Evaluate the status of the project against the defined exit criteria. Which of the following optionsshows the correct status? 2 credits



A. Criteria A = OK, criteria B = OK, criteria C = OK
B. Criteria A = NOT OK, criteria B = NOT OK, criteria C = OK
C. Criteria A = OK, criteria B = NOT OK, criteria C = NOT OK
D. Criteria A = NOT OK, criteria B = NOT OK, criteria C = NOT OK

This question is part of ISTQB Exam

+ AnswerRequest Answer
...

1 Answer

John Smith

John Smith

Answered on May 09, 2017

Criteria A = NOT OK, criteria B = NOT OK, criteria C = OK

####