John Smith
Answered: Aug 09, 2020
Project is running behind the monetary value of the work it planned to accomplish-schedule performance index (spi) tells the schedule efficiency ratio of earned value accomplished against the...Read More

1 Answer

217 views
S.m.mumtaz
Answered: Aug 09, 2020
Defines and refinesthe project objectives

1 Answer

216 views
John Smith
Answered: Aug 09, 2020
Project planning outputs-project planning outputs are not an input to risk monitoring and control. the project plan is an approved document, which is used to manage project execution. inputs to the...Read More

1 Answer

216 views
S.m.mumtaz
Answered: Aug 09, 2020
It is used primarily to award contract of a project or its phase.

1 Answer

215 views
T. Moses, Copywriter
Answered: Dec 12, 2019
The best project management tool should be that one which gives you an immersive experience with respect to project handling. Generally, top project management tools are hard to use due to...Read More

1 Answer

212 views
John Smith
Answered: Aug 09, 2020
Spi // spi – schedule performance index-you would most likely use schedule performance index (spi) as a basis for crashing your schedule. spi is an indicator of how the project is progressing...Read More

1 Answer

211 views
John Smith
Answered: Aug 09, 2020
Establishing a cost baseline for measuring project performance-integrated change control does not involve establishing a cost baseline for measuring project performance. the cost baseline for...Read More

1 Answer

211 views
Jroc
Answered: Aug 09, 2020
Is documents the justification for undertaking the project

C

1 Answer

210 views
John Smith
Answered: Aug 09, 2020
Risk monitoring and control-approved change requests are an input to risk monitoring and control. risk monitoring and control is the process of risk tracking, monitoring, identifying new risks,...Read More

1 Answer

209 views
John Smith
Answered: Aug 09, 2020
An error in defining the project scope-this is an example of a change request that was the result of an error in defining the project scope. a statement of work (sow) is a narrative description...Read More

1 Answer

209 views
John Smith
Answered: Aug 09, 2020
Trend analysis-trend analysis is a technique used for performance reporting. it involves examining project results over time to determine if performance is improving or degrading. it is helpful in...Read More

1 Answer

209 views
John Smith
Answered: Aug 09, 2020
A set of procedures to define how scope might be changed, including the paper work, tracking systems and approval levels necessary for authorizing change-the projects scope change control system is...Read More

2 Answers

208 views
John Smith
Answered: Aug 09, 2020
Scope changes-scope changes is not a tool or technique for risk monitoring and control. scope changes, in the form of approved change requests are an input to risk monitoring and control. tools and...Read More

1 Answer

208 views
John Smith
Answered: Aug 09, 2020
Schedule-the new project manager should be concerned with the schedule. the spi of 0.71 needs to be monitored. schedule performance index (spi) is a key indicator of project schedule performance. if...Read More

1 Answer

208 views
John Smith
Answered: Aug 09, 2020
Flowcharting-flowcharting is not typically used in the performance reporting process. flowcharting is a tool often used in the perform quality assurance and perform quality control processes. a...Read More

1 Answer

207 views