This is a 50 question multiple choice and true or false test for Information Technology Equipment Custodian (ITEC) Training at Dobbins Air Reserve Base, GA. The ITEC has 120 minutes (2 hours) to complete the test and must have a minimum of 90% to pass (45 out of 50 correct). The ITEC should read each question carefully and choose the best answer. After successful completion of the test, the ITEC needs to save their training certificate of completion as a PDF file, save a copy for their file, and send a copy to the Read moreECO to update their training date. ITEC Inital and Annual Refresher training is required in accordance with AFI 33-112, para. 8.5. 1.2.
Viewing of the training slides and successful completion of this test will fulfill requirements for INITIAL or ANNUAL Refresher Training for the ITEC. The ITEC also has the option to request personal one-on-one training from the (Equipment Control Officer) ECO.
AFI 23-111
AFI 33-112
AFI 33-114
AFMAN 23-220
True
False
AFI 23-111
AFI 33-112
AFI 33-114
AFMAN 23-220
True
False
True
False
Rate this question:
True
False
Receive initial training within 20 days of initial appointment and receive semi-annual refresher training thereafter.
Receive initial training within 20 days of initial appointment and receive annual refresher training thereafter.
Receive initial training within 30 days of initial appointment and receive semi-annual refresher training thereafter.
Receive initial training within 30 days of initial appointment and receive annual refresher training thereafter.
No later than 20 days prior to the outgoing ITEC’s departure.
No later than 30 days prior to the outgoing ITEC’s departure.
No later than 35 days prior to the outgoing ITEC’s departure.
No later than 45 days prior to the outgoing ITEC’s departure.
True
False
No later than 20 days prior to the outgoing ITEC’s departure.
No later than 30 days prior to the outgoing ITEC’s departure.
No later than 35 days prior to the outgoing ITEC’s departure.
No later than 45 days prior to the outgoing ITEC’s departure.
5280
5802
5208
2508
FU6730
FU7603
FU6307
FU6703
True
False
From 1 January to 31 March, due to the ECO by COB 31 March.
From 1 April to 30 June, due to the ECO by COB 30 June.
From 1 July to 30 September, due to the ECO by COB 30 September.
From 1 October to 31 December, due to the ECO by COB 31 December.
True
False
Rate this question:
True
False
True
False
True
False
Rate this question:
True
False
Rate this question:
Account for it without proof of its existence. In other words, “pencil whip" the inventory that the asset is accounted for.
Contact the user through e-mail correspondence so that there is a written documentation (proof) of the asset’s accountability.
Call the user by phone and take the user’s word that he/she has the asset.
Wait for the user to return from deployment or TDY.
Rate this question:
ITEC that performed the inventory
Primary ITEC and Alternate ITEC
ITEC that performed the inventory and Unit Commander or Equivalent
ITEC that performed the inventory, Unit Commander or Equivalent, and ECO
ITEC that performed the inventory and his/her Supervisor
Outgoing ITEC and ECO
New ITEC and ECO
Unit Commander or Equivalent
Outgoing ITEC, New ITEC, Supervisor, and ECO
Outgoing ITEC, New ITEC, Unit Commander or Equivalent, and ECO
True
False
True
False
True
False
True
False
True
False
True
False
True
False
True
False
Rate this question:
True
False
3 years
4 years
5 years
6 years
Rate this question:
3 years
4 years
5 years
6 years
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
True
False
Rate this question:
True
False
True
False
Submit a Turn-In Memo to the ECO; deguass all hard drives; fill out DLIS 1867 for all hard drives; get the equipment ready to go to supply; await further instructions from the ECO.
Await instructions from the ECO; submit a Turn-In Memo to the ECO; get the equipment ready to go to supply; sanitize hard drives; await further instructions from the ECO.
Submit a Turn-In Memo to the ECO; determine what needs to be turned in; get the equipment ready to go to supply; sanitize hard drives; take the equipment to DRMO.
Determine and identify what needs to be turned in; submit a Turn-In Memo to the ECO; get the equipment ready to go to supply and sanitize or degauss hard drives as required; fill out DLIS Form 1867 as required; await further instructions from the ECO.
All ITEC appointment letters; most current inventory; all source documents such as hand receipts, turn-in memos, transfer documents, etc.; other ITEC related documents such as printed e-mail corresponcence; ITEC checklist.
All ITEC appointment letters; all inventories dating back 5 years; hard copies of AFI 23-111, AFI 33-112, and AFMAN 23-220; current applicable source documents such as hand receipts, turn-in memos, transfer documents, etc.; other ITEC related documents such as printed e-mail corresponcence; ITEC checklist.
Most current ITEC appointment letter; most current official inventory; hard copy of AFI 33-112; current applicable source documents such as hand receipts, turn-in memos, transfer documents, etc.; other current ITEC related documents such as printed e-mail corresponcence; current ITEC checklist.
Most current ITEC appointment letter; all inventories dating back 5 years; all source documents such as hand receipts, turn-in memos, transfer documents, etc.; all other ITEC related documents such as printed e-mail corresponcence; ITEC checklist.
True
False
Rate this question:
Date of the inventory listing is current, and DRA and ITEC account numbers are correct.
Asset serial number is correct, and building & room number of the asset location is correct.
Description & model number of the asset is correct, and there is a legible bar code lable affixed to the asset.
ITEC information on the last page of the inventory listing is correct.
All of the above.
ITEC ensures to look everywhere (e.g., inside/under desks/cabinets, behind doors, inside storage closets, etc.) in the immediate location (according to the building and room location on the inventory) to locate the asset.
ITEC asks co-workers or witnesses if they know where the asset is or if they have seen it.
ITEC checks the ITEC folder/binder for source documents that may reveal the status of the asset, for example, hand receipts, turn-in memos, transfer documents, etc.
ITEC informs the ECO and provides the ECO with the serial number to check AIM to see if the asset was transferred to another DRA or ITEC account.
All of the above.
If stolen, the end-user must contact the local police (of the jurisdiction where the asset was stolen) to get a police report made and get a copy of the report for an ROS.
The ITEC must immediately (within 15 days of discovery for ARTs and full-time civilians, or withing 45 days for traditional reservists of the loss, theft, or damage) inform the Base Reports of Survey (ROS) Manager so that an ROS invenstigation can be made.
Contact the manufacturer as required to repair/replace a damaged asset.
The ITEC asks the ECO for a new asset to replace the lost, stolen, or damaged asset without performing an ROS.
A, B, and C are correct. However for answer C, the asset warranty must be considered.
If the hard drive is deguassed, will not be replaced back into the computer chasis, and will be disposed of seprately from the computer, fill out one DLIS Form 1867 for the hard drive, with the serial number, make and model of the hard drive.
If the hard drive is deguassed, will not be replaced back into the computer chasis, and will be disposed of seprately from the computer, fill out a second copy of the DLIS Form 1867 for the computer chasis, with the serial number, make and model of the computer chasis.
If the hard drive is erased or wiped and is replaced back into the computer chasis, fill out one DLIS Form 1867 for the computer chasis, with the serial number, make and model of the computer chasis.
All of the above.
True
False
True
False
True
False
Quiz Review Timeline +
Our quizzes are rigorously reviewed, monitored and continuously updated by our expert board to maintain accuracy, relevance, and timeliness.
Wait!
Here's an interesting quiz for you.