capacity
|
the amount of output that a system is capable of achieving over a specific pd of...
|
|
| 2 |
managing _______ ________ is critical in operations of all businesses
|
productive capacity
|
|
| 3 |
basic capacity questions
|
what kind of capacity is needed?how much is needed?when is it needed?
|
|
| 4 |
speculative
|
forecast
|
|
| 5 |
responsive
|
demand
|
|
| 6 |
real (effective) capacity
|
what is to be produced
|
|
| 7 |
long range capacity planning
|
> 1 yrbuildingsinvest in new facilities and equipment or not?large capital expenditures
|
|
| 8 |
intermediate range capacity planning
|
6-18 monthshiring, lay off, minor equip purchase
|
|
| 9 |
short range capacity planning
|
1 month or lesseliminate variance between planned vs. actual outputovertime, personnel...
|
|
| 10 |
strategic capacity planning
|
determining the overall capacity level or capital intensive resources that best...
|
|
| 11 |
best operating level
|
level of capacity for which the process was designed and volume output where avg cost per unit...
|
|
| 12 |
capacity utilization rate=
|
actual output/ best operating level (%)
|
|
| 13 |
capacity utilization rate
|
how close to best operating level
|
|
| 14 |
economies of scale
|
volume increase, cost/unit decreasespread the fixed costs of building and equip over multiple...
|
|
| 15 |
diseconomies of scale
|
where cost/unit rises as volume increasesplant too large
|
|
| 16 |
focused factory
|
a facility with a fairly limited set of production objectivesfocus on one product
|
|
| 17 |
Plant within a Plant
|
used to operationalize a focused factory by designating a specific area in a larger plant
|
|
| 18 |
capacity flexibility
|
ability to increase or decrease production levels and shift products
|
|
| 19 |
economies of scope
|
low cost to switch from one product to another
|
|
| 20 |
flex plants
|
adapt to change like ringling bros
|
|
| 21 |
adjustments
|
balance capacityfrequency of additions/reductionsexternal sources of capacity
|
|
| 22 |
balancing capacity across process steps
|
outputs from prior steps are inputs to nextminimize bottleneck
|
|
| 23 |
frequency of add/reduction
|
too frequent, unnecessary costsnot frequent, lost salesboth expensive
|
|
| 24 |
external sources of capacity
|
may be cheaper to out source
|
|
| 25 |
bottleneck
|
the step in production delivery process that has the lowest capacity when measured using a...
|
|
| 26 |
find a bottleneck
|
on paper: find capacityline of sight: highest WIP inventory
|
|
| 27 |
capacity expansion=
|
desired change in capacity- increase in capacity from replacing depreciated capital- change...
|
|
| 28 |
match capacity to
|
demand
|
|
| 29 |
Planning SERVICE capacity
|
time (deliver to customer then produced)locationvolatility of demand (10-30 min)capacity utilization...
|
|
| 30 |
best operating point is near _____ of capcity for serivce
|
70%
|
|
| 31 |
caveats
|
capacity affects not only service quality but also conformance quality
|
|
| 32 |
capacity cushion
|
amt of capacity in excess of expected demanddesign/expected
|